Compaction quality is critical to the stability and durability of earth-rock dams. The traditional quality inspection method relies primarily on testing randomly sampled spots of a job site, which may cause unreliable representation of the compaction quality of the entire work and lead to delays not only in performing the construction work but also in identifying and rectifying quality issues. In this paper, a quality-inspection process is developed that monitors compaction operations of earth-rock dam construction in real time and establishes a multiple regression model to predict compaction quality by using independent variable data obtained from the real-time quality-monitoring system. These independent variables include compaction operation parameters (i.e., compaction passes, roller velocity, vibration status, and pavement thickness) and earth-rock aggregate’s moisture content and gradation. Furthermore, by using the kriging interpolation procedure, the compactness at any point of a work area...
In rockfall hazard management, the investigation and detection of potential rockfall source areas on rock cliffs by remote-sensing-based susceptibility analysis are of primary importance. However, when the rockfall analysis results are used as feedback to the fieldwork, the irregular slope surface morphology makes it difficult to objectively locate the risk zones of hazard maps on the real slopes, and the problem of straightforward on-site visualization of rockfall susceptibility remains a research gap. This paper presents some of the pioneering studies on the augmented reality (AR) mapping of geospatial information from cyberspace within 2D screens to the physical world for on-site visualization, which directly recognizes the rock mass and superimposes corresponding rock discontinuities and rockfall susceptibility onto the real slopes. A novel method of edge-based tracking of the rock mass target for mobile AR is proposed, where the model edges extracted from unmanned aerial vehicle (UAV) structure-from-motion (SfM) 3D reconstructions are aligned with the corresponding actual rock mass to estimate the camera pose accurately. Specifically, the visually prominent edges of dominant structural planes were first explored and discovered to be a robust visual feature of rock mass for AR tracking. The novel approaches of visual-geometric synthetic image (VGSI) and prominent structural plane (Pro-SP) were developed to extract structural planes with identified prominent edges as 3D template models which could provide a pose estimation reference. An experiment verified that the proposed Pro-SP template model could effectively improve the edge tracking performance and quality, and this approach was relatively robust to the changes of sunlight conditions. A case study was carried out on a typical roadcut cliff in the Mentougou District of Beijing, China. The results validate the scalability of the proposed mobile AR strategy, which is applicable and suitable for cliff-scale fieldwork. The results also demonstrate the feasibility, efficiency, and significance of the geoinformation AR mapping methodology for on-site zoning and locating of potential rockfalls, and providing relevant guidance for subsequent detailed site investigation.
1 October 2004 in Journal of Construction Engineering and Management
System simulation has proved to be an effective tool for planning and improving the performance of a construction process in many successful case studies. However, with the aid of a three dimensional (3D) visualization system, simulation technology will be engaged to its farthest-reaching potential. This paper presents a geographic information system (GIS)-based visual simulation method, in which system simulation techniques are integrated with visualization techniques. The GIS-based visual simulation system (GVSS) was developed by the authors. The GVSS is a simulation tool offering powerful planning, visualizing, and querying capabilities that facilitate the detection of logic errors in simulation models. The software also helps to understand the comprehensively complex modeled construction process, and is capable of organizing vast amounts of spatial and nonspatial data involved in simulation. A hydroelectric project, which will take place on the Yellow River in the northwest of China, is used as an exa...
1 September 2017 in Computer-Aided Civil and Infrastructure Engineering
Comprehensive and effective risk analysis is significant for studying construction simulation of diversion tunnel. Existing tunnel risk simulation approaches mainly analyze ordinary risk factors, and cannot quantitatively study risk events considering their causes. Additionally, in other tunnel probabilistic risk analysis methods, although some studies have made full probabilistic estimates of tunnel schedule, risk factors are unable to be studied considering cyclic construction characteristics and occurrence probability of risk events cannot be determined quantitatively. To address the issues, a probabilistic risk analysis approach of diversion tunnel construction simulation is proposed. Based on hierarchical simulation model, risk factors can be analyzed at operation level of tunnel construction. Moreover, Bayesian network is embedded into simulation program to quantitatively calculate probability of risk events in each simulation cycle, considering geology, design, construction, and management conditions and their mutual dependence.