Numerous existing formulas predicted the ultimate interfacial bond strength in concrete-filled steel tubes (CFST) between steel tubes and concrete core without investigating the whole response under push-out load. In this research, four models are proposed to predict the interfacial behavior in CFST including the post-peak branch under the push-out loading test based on 157 circular specimens and 105 squared specimens from the literature. Two models (one for circular and one for squared CFST) are developed and calibrated using artificial neural network (ANN) and two models (one for circular and one for squared CFST) are developed based on multivariable regression analysis, analysis of variance (ANOVA). The shape of the specimen (circular or squared), diameter of the tube, thickness of the tube, concrete compressive strength, age at the time of testing, and length of the specimen are the main factors considered. These models are then compared to other existing formulas to verify their capability to better predict the ultimate interfacial bond strength. It is found that the ANN model gives better results for most of the considered data. It is also found that ANN models can predict the overall bond-slip response for the considered dataset. In order to simulate the response of any CFST column using finite element (FE) method, it is vital to have sufficient input data on the overall bond-slip behavior between the interior face of the steel tube and the exterior surface of the concrete core including the post-peak branch. Accordingly, the suggested ANN model is used to generate the required input data related to the cohesive behavior and damage along the interface in ABAQUS model to simulate the response of two circular and two squared CFST columns under concentric compressive load. The results are in good agreement with experimental outcomes. The cohesive criterion and damage interface that are used based on ANN models in FE are found to be sufficient and can be adopted to model CFST columns.
1 February 2016 in Construction and Building Materials
A promising substitute for regular concrete is geopolymer concrete. Engineering mechanical parameters of geopolymer concrete, including compressive strength, are frequently measured in the laboratory or in-situ via experimental destructive tests, which calls for a significant quantity of raw materials, a longer time to prepare the samples, and expensive machinery. Thus, to evaluate compressive strength, non-destructive testing is preferred. Therefore, the objective of this research is to develop an artificial neural network model based on the results of destructive and non-destructive tests to assess the compressive strength of geopolymer concrete without needing further destructive tests. According to the artificial neural network analysis developed in this study, the compressive strength of geopolymer concrete can be predicted rather accurately by combining the results of the non-destructive with R2 of 0.9286.
7 February 2023 in Case Studies in Construction Materials
Sustainable buildings contribute significantly to achieving sustainable development and provide many benefits. However, sustainable building construction projects are riskier than traditional construction projects. Thus, this research aimed to identify and assess the risks in sustainable construction projects in Jordan based on their probabilities of occurrence and impacts on time and cost. For this purpose, a literature review and structured interviews were performed to identify the risks. Additionally, questionnaire surveys were conducted, and the relative relevance index and analytic hierarchy process were utilized to assess the probabilities and impacts of these risks on time and cost. After that, a focus group discussion was conducted. According to the the risks’ probability and impacts on time and cost, the top-scoring risks include changes to the original design, budgeting inaccuracies owing to a lack of experience with sustainable building projects, additional costs incurred as a result of the use of sustainable building construction materials and equipment, inadequate or inaccurate sustainable design information, insufficient funds from clients, inadequate project planning for a sustainable building project, a tight project schedule for a sustainable building project, and insufficient identification of sustainable construction’s scope. This research contributes to the body of knowledge and practice by providing a novel integrated method for assessing risks in sustainable building construction projects in Jordan.