The power prediction error of uncertain renewable energy sources (URESs) affects the power balance of a power grid. In the power systems with high proportion renewable power sources (PSHPRPSs), automatic generation control (AGC) cannot accommodate the day-ahead power prediction error. The dispatching control system (DCS) of PSHPRPSs adds real-time dispatching links to modify the day-ahead dispatching plan so that the grid power error is within the range of AGC accommodation. This paper proposes a critical time scale (CTS) selection algorithm based on time aggregation characteristics for real-time dispatching of PSHPRPSs and calculates the annual CTS of real-time dispatching of power grids. The uncertainty function is used to describe the relationship between the prediction error of the URESs and the prediction lead time. The total uncertainty function is calculated based on the time aggregation characteristics and is used to select the annual CTS of real-time dispatching. The proposed algorithm quantitatively describes the relationship between the CTS and the operation proportion of URESs and also AGC accommodation capacity. The calculated annual CTS not only ensures the power balance of the power grid, but also avoids the daily change of the CTS. Using the data of URESs in the Irish power grid, the feasibility of the proposed method was verified. The research results of this paper are helpful to accommodate the day-ahead power prediction error of URESs and maintain the safe operation of power grid.
An efficient method for capacitor placement and network reconfiguration is presented in this paper to reduce energy loss in distribution networks over intervals of time. The concept of system state characterization and its relevant algorithm are introduced in order to develop a general, analytical method for solving network reconfiguration and capacitor placement problems and determining the conditions for energy loss minimization. Consequently, the computational effort required in solving such large-scale dynamic optimization problems is decreased greatly by converting the original problems into some simpler static optimization problems with appropriate linearization and stepwise correction idea. Based on sensitivity analysis, loop-analysis and superimpose theorem, the problem formulations are set in a realistic and robust framework so that the method is applicable to various electrical networks with complete or incomplete measurement allocations. A case study of IEEE 33-bus system demonstrates the rationality and validity of strategies proposed in this paper, and the results illustrate that this approach has a substantial reduction in computational expense while maintaining a high level of accuracy.