Fucheng Wu

Fucheng Wu

Auto-generated profile, based on publicly available information

Fucheng Wu

Guangzhou Guangjian Construction Engineering Testing Center Co., Ltd, Guangzhou 510405, China

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2022 in Journal of Performance of Constructed Facilities
Verified
Journal Article
Closed access
PDF file
KZKexin Zhang
Kexin Zhang
TQTianyu Qi
Tianyu Qi
DLDachao Li
Dachao Li
XLxinfeng Liu
xinfeng Liu
XXXingwei Xue
Xingwei Xue
FWFayue Wu
Fayue Wu
This paper introduces a method of strengthening prestressed concrete continuous box-girder bridges with prestressed steel strands. Construction process monitoring, field load tests before and after reinforcement, and health monitoring after reinforcement were performed to verify the effectiveness of the external prestressed steel strand reinforcement method. During the construction monitoring process, the measured values of each tensioning step are basically consistent with the theoretical values, but the measured values are slightly less than the theoretical values. The results of the field load tests show that the bending strength and stiffness of the strengthened girder have been improved. During health monitoring, the strain value and deflection value data for some parts across the specified section were collected. According to the data, the strain and deflection values fluctuated within the specified limit, and the bridge was always in a safe state.

22 September 2025 in Archives of Civil Engineering
Verified
Journal Article
Closed access
PDF file
GXGuangqing Xiao
Guangqing Xiao
XCXilong Chen
Xilong Chen
LXLihai Xu
Lihai Xu
FWFucheng Wu
Fucheng Wu
LZLiang Zeng
Liang Zeng
Shaohua HeShaohua He
Shaohua He
In current design codes, the standardized anchorage stress of prestressed tendons in concrete girders is uniform, which presents a notable challenge in accurately assessing the effective anchorage stress of girders with varying span lengths. This study investigates the impact of prestressed tendons’ span length and tensioning sequences on effective anchorage stress in small-box girders (20 m, 25 m, 30 m) and 40 m T-shaped girders. Comprehensive theoretical approaches for computing the effective anchorage stress of the tendons, accounting for stress losses due to conduit friction, anchor deformation, rebar relaxation, concrete, and joint compression, are presented. The calculated results for prestressed concrete (PC) girders with typical span lengths and cross-sections demonstrate that girder length and tensioning sequence influence the effective anchorage stress of prestressed tendons. The currently recommended standardized effective anchorage stress of 1280 MPa in existing codes, derived solely from a designated length and anchorage retraction, proves inadequate for PC girders of varying lengths. Based on theoretical and numerical findings, refined effective anchorage stress of 1237 MPa, 1244 MPa, and 1251 MPa are proposed for small-box girders with span lengths of 20 m, 25 m, and 30 m, respectively, while the recommended effective anchorage stress for a T-shaped PC girder with a length of 40 m is 1251 MPa. Adoption of the evaluation method effective anchorage stress yields an improved prestressed quality passing rate ranging from 4.0% to 10.9%, thereby effectively reducing the necessity for unnecessary supplementary tensioning or excessive tensioning during on-site construction to meet project requirements.