Hylton Olivieri

Hylton Olivieri

Auto-generated profile, based on publicly available information

Hylton Olivieri

Department of Civil Engineering, Aalto University School of Engineering, Espoo, Finland

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2019 in Automation in Construction
Verified
Journal Article
Open access
JZJIANYU ZHAO
JIANYU ZHAO
Olli SeppänenOlli Seppänen
Olli Seppänen
APAntti Peltokorpi
Antti Peltokorpi
BBBehnam Badihi
Behnam Badihi
HOHylton Olivieri
Hylton Olivieri

19 July 2017 in Construction Management and Economics
Verified
Journal Article
Open access
APAntti Peltokorpi
Antti Peltokorpi
HOHylton Olivieri
Hylton Olivieri
AGAriovaldo Denis Granja
Ariovaldo Denis Granja
Olli SeppänenOlli Seppänen
Olli Seppänen
Modularization has recently attracted considerable interest among academics and practitioners. In the construction industry, several modular solutions have been introduced and examined; however, hardly any study comprehensively classifies the different modularization strategies according to their possibility to achieve various objectives of building investments. This research aims to develop a framework for identifying and classifying modularization strategies in construction according to their suitability to achieve the specific outcomes intended for a building or its subsystem. Using the literature on product modularity, product platforms and production strategies as a basis, this study has developed a theoretical framework that proposes connections between the main objectives of a building investment and the dimensions of modularization strategies. The framework is elaborated by testing the propositions, based on an empirical analysis of nine real-life case studies. The findings reveal that modularization can be a suitable approach to develop an innovative design solution; improve a project’s quality, cost and schedule performance; and enable flexibility in building use and maintenance. However, suggestions for achieving these objectives vary from project organization-driven to collaborative, integrated or supplier-driven modularization strategies. Developers, owners, contractors and module suppliers can use the framework when positioning and developing their roles in the construction supply chain.

15 January 2018 in Construction Management and Economics
Verified
Journal Article
Open access
HOHylton Olivieri
Hylton Olivieri
Olli SeppänenOlli Seppänen
Olli Seppänen
AGAriovaldo Denis Granja
Ariovaldo Denis Granja
Critical Path Method (CPM), a planning and controlling technique, is widely used in the construction industry. However, CPM is criticized for its lack of workflow and inability to schedule continuous resource usage. Location-Based Management System (LBMS) fill these gaps and has been implemented in many construction projects. We propose that LBMS will improve schedules and project performance, addressing CPM’s main shortcomings. This study is composed of three case studies. CPM schedules were analyzed and were improved using LBMS tools. The resulting schedules show improved workflows, crew balancing, resource usage and had fewer interruptions, without affecting project duration. Furthermore, LBMS schedules were optimized with only a few scheduling operations and fewer planning elements. The computational benefit of LBMS increases with the number of locations and tasks in a schedule. Project managers will benefit from a simpler scheduling process and better resource flow.

1 May 2019 in Buildings
Verified
Journal Article
Open access
PDF file
PUPetteri Uusitalo
Petteri Uusitalo
Olli SeppänenOlli Seppänen
Olli Seppänen
ELEelon Mikael Lappalainen
Eelon Mikael Lappalainen
APAntti Peltokorpi
Antti Peltokorpi
HOHylton Olivieri
Hylton Olivieri
Few construction companies apply the available lean tools and processes in an integrated manner when managing design. Additionally, lean design management tools and processes each have their own strengths and optimal phases in which they should be applied. Earlier approaches in lean design management have not explicitly included the level of detail of building information model (BIM) models in connection with planning methods. For example, the Last Planner System (LPS) uses collaborative social methods to obtain task dependencies and commitments from project stakeholders, but it does not provide any guidance regarding what those tasks should be in a BIM-based process. With regard to production, this guidance is provided by combining location-based methods, such as a location-based management system or takt planning, to LPS. In a similar manner, by combining information from various sources, this paper defines a location-based design management process using the concept of level of detail that can be integrated with LPS. The level of detail definition must be based on the requirements of the end-user in each stage of the construction project. The process was cocreated and validated in focus group meetings with design and construction companies and further evaluated and assessed by applying it in a case project.

2 August 2019 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
PUPetteri Uusitalo
Petteri Uusitalo
Olli SeppänenOlli Seppänen
Olli Seppänen
APAntti Peltokorpi
Antti Peltokorpi
HOHylton Olivieri
Hylton Olivieri
Purpose: Although prior studies have noted the importance of trust for project performance, research remains scant on describing the role of trust when using lean design management (LDM) in projects. The purpose of this paper is to explore the connection between LDM and interpersonal trust in solving construction projects’ design management problems. Design/methodology/approach: A qualitative study was conducted that included 29 trust- and LDM-themed semi-structured interviews in the USA (California), Brazil and Finland; 11 focus group discussions were also organized to validate the interview findings. Findings: The study reveals how LDM contributes to solving design management problems through two distinct but interconnected mechanisms: improved information flow; and improved trust among project team members. A conceptual framework was crafted to illustrate the mechanisms in building trust by means of the social domain of LDM concepts. Research limitations/implications: The conceptual framework requires testing through an international survey or through multiple case studies. Practical implications: The results indicate that design management would benefit from trustful environments and that trust may be the catalyst for actors’ engagement with LDM. Managers in charge of design within projects can use the conceptual framework when selecting the appropriate LDM tools, which should include both the social and technical domains. Originality/value: The study emphasizes the importance of the social domain of LDM concepts. Previous studies have focussed on information flow aspects of LDM but have overlooked the value of interpersonal trust in solving design management problems.

9 July 2017
Verified
Conference Paper
Open access
PDF file
PUPetteri Uusitalo
Petteri Uusitalo
HOHylton Olivieri
Hylton Olivieri
Olli SeppänenOlli Seppänen
Olli Seppänen
EPErgo Pikas
Ergo Pikas
APAntti Peltokorpi
Antti Peltokorpi
ܱ½¬±®¿´ ͬ«¼»²¬ô ß¿´¬± ˲•ª»®•¬ §ô Ü»°¿®¬³»²¬ ±º Ý•ª•´ Û²¹•²»»®•²¹å οµ»²¬¿ ¶¿²¿«µ•± ì ßô ÐòÑò Þ±¨ ïîïððô ðððéê ß¿´¬±ô °»¬¬»®•ò««•¬¿´±à¿¿´¬±òº• î б¬¼±½¬±®¿´ λ»¿®½¸»®ô ß¿´¬± ˲•ª»®•¬ §ô Ü»°¿®¬³»²¬ ±º Ý•ª•´ Û²¹•²»»®•²¹ô ¸ §´¬±²ò±´•ª•»®•à¿¿´¬±òº• í Ю±º»±® ±º Ю¿½¬•½»ô ß¿´¬± ˲•ª»®•¬ §ô Ü»°¿®¬³»²¬ ±º Ý•ª•´ Û²¹•²»»®•²¹ô ±´´•ò»°°¿²»²à¿¿´¬±òº• ì ܱ½¬±®¿´ ͬ«¼»²¬ô Ý•ª•´ Û²¹•²»»®•²¹ Ü»°¬òô ß¿´¬± ˲•ª»®•¬ §ô Ì¿´´•²² ˲•ª»®•¬ § ±º Ì»½¸²±´±¹ § »®¹±ò°•µ¿à¿¿´¬±òº• ë ß•¬¿²¬ Ю±º»±®ô ß¿´¬± ˲•ª»®•¬ §ô Ü»°¿®¬³»²¬ ±º Ý•ª•´ Û²¹•²»»®•²¹ô ¿²¬¬•ò°»´¬±µ±®°•à¿¿´¬±òº•