19 March 2024 in Structural Concrete
The moment redistribution in a continuous prestressed concrete beam occurs as a result of a change in the rigidity of a beam and formation of plastic hinges when approaching the failure. Rotation capacity is required to allow for moment redistribution. Four continuous two‐span concrete beams prestressed with unbonded tendons were built and loaded up to failure at the laboratory of Civil Engineering in Tampere University. The test beams had different reinforcement ratios in the support area when the degree of prestressing and amount of tension reinforcement in the midspans were kept constant. All test beams were loaded by bending, but one test beam had torsion load in addition to bending. The degree of bending moment redistribution was defined by using nonlinear analysis and equations from the European standard and ACI318, as well as the test results. Moment redistribution clearly occurred on all test beams, and the beams had a high level of deformability.
1 June 2021 in Nordic Concrete Research
Predicting the stress increase of an unbonded tendon in a post-tensioned continuous concrete beam at ultimate capacity is more difficult than when bonded tendons are used. The failure mechanisms of the continuous beam are also different to that of the simple-span beam. The loading type, ductility of the support area and moment redistribution influence the behaviour of the continuous structures. In this research, the simplified nonlinear analysis was used for predicting the unbonded tendon stress increase at ultimate capacity in continuous two-span beams. The model is based on the moment-curvature relationships of the reinforced concrete cross-sections under different compressive forces and deformations of the continuous beam under loading. The results have been compared with the experimental results of recent studies found in the literature. In addition, 92 unbonded post-tensioned two-span beams with different reinforcements have been examined by using the model and compared to the results obtained from empirical equations from the literature. The results from the nonlinear analysis correspond well to the results from the other models up to the reinforcement ratio of 0.35. The calculated values of the maximum moment capacity at the centre support were close to the results from the test beams.
21 January 2025 in Structural Concrete
31 July 2023 in Structural Concrete
1 June 2025 in Nordic Concrete Research
The ratio of bending stiffnesses at different critical points in the continuous prestressed concrete beam exerts an influence on the redistribution of internal forces, generally moment from support to field. The increasing load will result in the formation of a large number of cracks in the maximum moment regions. This, in turn, leads to a reduction of the flexural stiffness of the member and finally the formation of plastic hinges. Four continuous two-span concrete beams prestressed with unbonded tendons were constructed and loaded up to failure at the laboratory of Civil Engineering in Tampere University. This article focuses on the examination of the flexural stiffness of the test beams during the loading tests. The average bending stiffness of the test beams, as determined through the measured deflections, was clearly less than the elastic value E cm I g , even at the low loading levels. The calculated rotation values in the centre support exhibited a good correlation with experimental results. However, these values remained below the observed values because, in the plastic hinge regions, the stiffness underwent a more rapid decrease. The total plastic rotation obtained from test results was approximately three times the plastic rotation capacity calculated using the Eurocode.