Olli Asp

Mr. Olli Asp


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 December 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
TPtuomo poutanen
tuomo poutanen
TLTim Länsivaara
Tim Länsivaara
SPSampsa Pursiainen
Sampsa Pursiainen
JMJari Mäkinen
Jari Mäkinen
OAOlli Asp
Olli Asp
This study concerns the safety factor and the reliability calculation for structural codes. The Eurocodes are used as a reference. Safety factor calculation is a demanding task which necessitates using an appropriate root-solving algorithm with a sufficient numerical accuracy. This article introduces a simple algorithm to calculate the safety factors directly, as previously there has been no means to control the accuracy. Presently, the safety factors are defined indirectly through the reliability index. The basic safety factor calculation is presented here in six different equations with the same outcome but differences regarding the numerical calculation, which provides a method to check the accuracy and select a proper equation for the root solver. The safety factor calculation for the permanent and the variable load in the Eurocodes is based on the independent, i.e., random, load combination and single load pairs. The current approach of safety factor calculation applied in the Eurocodes is disclosed here. Simple analytical equations based on the convolution equation are presented. Those can be used instead of the computer programs applied currently.

10 April 2021 in Structural Concrete
Verified
Journal Article
Open access
PDF file
OAOlli Asp
Olli Asp
JTJoonas Tulonen
Joonas Tulonen
LKLauri Kuusisto
Lauri Kuusisto
ALAnssi Laaksonen
Anssi Laaksonen
Grouted tendons are commonly used in construction of bridges and other post‐tensioned structures. The quality of grouting is essential to provide the durability and robustness of the structure. In this paper, the bond and re‐anchoring of post‐tensioned tendons in grout in case of tendon failure is assessed. A set of tests were conducted to simulate the failure of a post‐tensioned tendon in the beam. The results were compared with the theory of prestressing strand anchoring in concrete. In the tests, the re‐anchoring and bond lengths were measured in case of complete grout and incomplete grout with void. In the case of incomplete grout, the increase in re‐anchoring length is observed. In the case of overlapping re‐anchoring and bond length, the bond length and tendon slip increase significantly. A limited re‐anchoring length of tendon in incomplete grout increases the robustness of the structure, as the broken tendon can maintain its effectiveness outside of the failure region. The existing calculation model shows a good match with test results, and therefore it is suitable for the analysis of structures with broken tendons.

19 March 2024 in Structural Concrete
Verified
Journal Article
Open access
TNTarja Nakari
Tarja Nakari
JTJoonas Tulonen
Joonas Tulonen
OAOlli Asp
Olli Asp
UKUlla Kytölä
Ulla Kytölä
ALAnssi Laaksonen
Anssi Laaksonen
The moment redistribution in a continuous prestressed concrete beam occurs as a result of a change in the rigidity of a beam and formation of plastic hinges when approaching the failure. Rotation capacity is required to allow for moment redistribution. Four continuous two‐span concrete beams prestressed with unbonded tendons were built and loaded up to failure at the laboratory of Civil Engineering in Tampere University. The test beams had different reinforcement ratios in the support area when the degree of prestressing and amount of tension reinforcement in the midspans were kept constant. All test beams were loaded by bending, but one test beam had torsion load in addition to bending. The degree of bending moment redistribution was defined by using nonlinear analysis and equations from the European standard and ACI318, as well as the test results. Moment redistribution clearly occurred on all test beams, and the beams had a high level of deformability.

26 September 2023 in The Baltic Journal of Road and Bridge Engineering
Verified
Journal Article
Open access
PDF file
OAOlli Asp
Olli Asp
ALAnssi Laaksonen
Anssi Laaksonen
The national calibration of Eurocode load model 1 (LM1) for road bridges was made by a calibration of the load effects of LM1 against the corresponding load effects of a former load model used in Finland. Due to the increased gross vehicle weights in legislation, a national calibration of LM1 was necessary and the stochastic simulation was needed. The aim of this study is to generate a traffic model together with a predictive model for simulation purposes by using and combining long-time monitoring data measured on a road network in different surveys. In this paper, the performance of the predictive model of increases in axle loads and gross vehicle weights is evaluated against short-term bridge weight in motion (BWIM) measurements. The results achieved with a simulation can be used to gain more information of statistical parameters and the evolution of load effects caused on bridges by road traffic in Finland. The simulation model presented in this study served as a basis for updated national calibration of load model LM1. The follow-up comparison between predictive model and traffic monitoring shows the suitability of the estimation of the evolution of traffic loads and also necessity of the raise of LM1.

22 June 2021 in Structural Concrete
Verified
Journal Article
Open access
PDF file
UKUlla Kytölä
Ulla Kytölä
OAOlli Asp
Olli Asp
ALAnssi Laaksonen
Anssi Laaksonen
The objective of the current study is to investigate and evaluate the flexural behavior of the continuity connection of precast prestressed concrete beams in negative bending when the tendons are located at the compression side. The experimental program included four T-shaped composite cantilever beams which were loaded up to failure. The main variable of the tests was the amount of prestress force of the connected precast beams. The reinforcement ratio of continuity connection was high. The ultimate flexural capacities and moment-curvature relations were calculated theoretically. A comparison was then carried out between both the experimental and theoretical results. These experiments revealed that prestress force did not influence the ultimate hogging moment capacity of the continuity connection, but it had an effect on its soffit's compression cracking and spalling of the concrete cover before failure. This study also indicated that confinement of the concrete had a massive influence on the connection's behavior, and it increased both its negative moment capacity and ductility.

2 March 2026 in Structural Concrete
Verified
Journal Article
Open access
OAOlli Asp
Olli Asp
JTJoonas Tulonen
Joonas Tulonen
ALAnssi Laaksonen
Anssi Laaksonen
Grouted tendons are a common solution for long‐span bridge structures. The grout provides bond and corrosion protection for prestressing steel. However, if the grouting is defective, corrosion of the prestressing steel may initiate and eventually lead to tendon failure. The consequences and noticeability of tendon failure depend on the structure's design, with some structures experiencing more sudden failure than others. Existing methodologies allow the assessment of robustness at the cross‐section level. However, tendon failure occurring on the top surface of bridge beams is often difficult to detect in practice. In hyperstatic beams, the yielding of a single cross‐section is less substantial in comparison to its ability to form a plastic hinge, thereby contributing to load redistribution along the beam. In this study, four two‐span hyperstatic beams with different reinforcing ratios are loaded to failure. This study assesses the member‐level robustness and pre‐failure behavior of PTC beams in the event of tendon failure. A non‐linear calculation model has been developed to simulate the effects of tendon failure at the middle support. The model can be used to analyze the safety and robustness of post‐tensioned concrete bridges with suspected tendon failure.