Willian F. S. Maia

Willian F. S. Maia

Auto-generated profile, based on publicly available information

Willian F. S. Maia

VALE S.A., Nova Lima, Brazil

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2021 in IEEE Access
Verified
Journal Article
Open access
WMWillian Maia
Willian Maia
PEPetr Iakovlevitch Ekel
Petr Iakovlevitch Ekel
DVDouglas Vieira
Douglas Vieira
ECEduardo Antonio de Castro
Eduardo Antonio de Castro
MOMateus Alberto Dorna de Oliveira
Mateus Alberto Dorna de Oliveira
KSKenedy Marconi Geraldo dos Santos
Kenedy Marconi Geraldo dos Santos
The present work aimed at improving the quality of operational risk estimation for power substations and increasing the efficiency in its reduction using models and methods of multicriteria decision-making. The application of the proposed methodology allows one to assess, compare, prioritize, and/or order power substations from the point of view of operational risks and to rationally allocate available resources to reduce operational risks. It is presented a method of Systemic Risk Assessment (SRA) that integrates concepts of risk assessment and multicriteria decision-making techniques. The use of SRA permits one to take into account expert opinions to obtain the operational risk estimates. These estimates serve for allocating resources between substations within the framework of multicriteria models. The analysis is based on applying the Bellman-Zadeh approach to decision-making in a fuzzy environment to solve multicriteria problems and provide their harmonious solutions. The risk assessment results of the three power substations show that the power substation (PS)2 has the highest risk level (0.314), followed by PS1 (0.267), and PS3 (0.199), and the allocation of financial resources between the substations is the following: PS1: R $\$ $ 465,000.00, PS2: R $\$ $ 1,714,339.00 and PS3: R $\$ $ 820,661.00. The Case Study, demonstrates the possibility of reducing the subjectivity of the risk evaluation and the improvement of the quality of the decisions made in resource allocation.

18 June 2024 in International Journal of Environmental Science and Technology
Verified
Journal Article
Closed access
PDF file
MAMarcos Antonio Alves
Marcos Antonio Alves
BOB. A. S. Oliveira
B. A. S. Oliveira
DFDouglas Ferreira
Douglas Ferreira
Ana Paula Paes Dos SantosAna Paula Paes Dos Santos
Ana Paula Paes Dos Santos
WMW. F. S. Maia
W. F. S. Maia
OPO. Pinto
O. Pinto

20 July 2022
Verified
Book Chapter
Closed access
PDF file
DPDaniel J. C. Pereira
Daniel J. C. Pereira
KSKenedy Marconi Geraldo dos Santos
Kenedy Marconi Geraldo dos Santos
DCDouglas O. Campos
Douglas O. Campos
Polyane Alves SantosPolyane Alves Santos
Polyane Alves Santos
LRLucas S. Ribeiro
Lucas S. Ribeiro
WMWillian F. S. Maia
Willian F. S. Maia