Ali K. Alhuraishawy

Ali K. Alhuraishawy

Auto-generated profile, based on publicly available information

Ali K. Alhuraishawy

Ministry of Oil, Baghdad, Iraq

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 November 2022 in SPE Production & Operations
Verified
Journal Article
Closed access
PDF file
MAMohammed Awad Ahmed
Mohammed Awad Ahmed
GAGhassan Abdul-Majeed
Ghassan Abdul-Majeed
AAAli K. Alhuraishawy
Ali K. Alhuraishawy
Summary: Asphaltene is a solid oil component with a wide range of molecular compositions and structures, making it one of oil’s most complicated components. The deposition and precipitation of asphaltene in several places along the oil production line, such as the wellbore, reservoir, flow lines, tubing, and the separation unit at the surface, of the most prevalent flow assurance challenges. Changes in pressure, composition, and temperature cause asphaltene to precipitate out of the oil continuum. Variations in operation condition are caused by various recovery processes (gas injection, natural depletion, and chemical injection) in addition to the creation and blending of various oils during transportation. This paper presents a complete review of asphaltene precipitation (AP) and deposition (AD), which in turn helps in understanding the governing mechanisms and thermodynamic behaviors in this field. This study consists of several stages: analyzing the current state of asphaltene research (asphaltene characteristics, chemical nature, molecular structure, asphaltene crude oil phase behavior, solubility factors, and other factors); describing the phases of asphaltene (from its stability through its deposition in the reservoir pores, facilities, wellbore path in addition to the reasons for their occurrence); clarifying the rheology and asphaltene flow behavior in the reservoir; and finally examining the advantages and disadvantages of most widely used strategies for determining onset AP. In addition, some measured Iraqi asphaltene data are demonstrated and analyzed. This work will contribute to better knowledge of asphaltene and will serve as a reference for future studies on how to properly investigate and simulate asphaltene.

1 August 2024 in Petroleum Chemistry
Verified
Journal Article
Closed access
PDF file
EAEmad Al-Khdheeawi
Emad Al-Khdheeawi
AAAli K. Alhuraishawy
Ali K. Alhuraishawy
DMDoaa Saleh Mahdi
Doaa Saleh Mahdi
YYYujie Yuan
Yujie Yuan
JMJumana M. Mulla
Jumana M. Mulla
AMAmmar A. Mola
Ammar A. Mola
Production logging tools (PLTs) are one type of cased hole logging, run during the production or injection stages of a well’s life, for obtaining fluid types and measuring fluid rates in the borehole for each perforation interval, and to better understand the well productivity or the well injectivity of the interest zones, also, to detect some well problems, such as cross-flow, tubing leak, casing leak. In this study, we interpreted production logging tools by Emeraude software from Kappa company to knowing which perforation interval represents the most contributing to the hydrocarbon production and to detect if there is a cross-flow problem or not, for well (X): vertical oil-producing well that belongs to (Y) oilfield, perforated with six perforation intervals, and the results were: the first two perforation intervals represent the less production interval, which accounts for 2.89 and 3.57% of the total downhole rate, and the water cut is about 27 and 32% on the surface respectively. Perforation intervals 3 and 4 do not contribute to the production. Perforation interval 5 represents the main production interval which accounts for 65.68 % of the total downhole rate, and this interval is the main water production interval with water cut about 36% on the surface, and the perforation interval 6 represents the secondary production interval which accounts for 27.86% of the total downhole rate, and the water cut is about 5% on the surface. In addition, there is no cross-flow problem, however, PLTs must be lowered in shut-in conditions to confirm this.

1 August 2024 in Petroleum Chemistry
Verified
Journal Article
Closed access
PDF file
JNJassim M. Al Said Naji
Jassim M. Al Said Naji
GAGhassan Abdul-Majeed
Ghassan Abdul-Majeed
AAAli K. Alhuraishawy
Ali K. Alhuraishawy
FKFadhil S. Kadhim
Fadhil S. Kadhim
GJGhazwan N. S. Jreou
Ghazwan N. S. Jreou
AMAli Al Mashat
Ali Al Mashat
Sand production is a global issue that arises in fields that produce from sandstone reservoirs. Integrated sand production management needs sequential steps for optimizing and controlling process. The present paper is dealt with prediction of reservoir ability to produce sand at the first period of production and determine whether or not sand production control mechanisms are necessary. The constructed model was for Iraqi X4 well that produced from the Asmari reservoir in southern Iraq. Pore pressure measurements, reports, core test results, and well logs were the data used to perform the model. The Asmari reservoir was categorized into six layers (A, B1, B2, B3, B4, and C) based on the previous evaluation process. The X4 well was actually completed by sand screens down to the bottom hole before the well was opened to production. The methodology of the present paper was divided into three parts: To begin, the 1D mechanical earth model (MEM) is built by determining the principal stresses, pore pressure, elastic rock properties, and strength rock properties. Second, the outputs of (1D MEM) were used to compute the critical drawdown pressure (CDDP). According to the computed CDDP, four depths (3055, 3082, 3107, and 3133 meters) have the ability to produce sand at varying depilation rates (0, 15, 25, and 35%). The actual perforation interval of the X4 well existed within the same sanding likelihood interval. Finally, a single depth analysis was carried out for a depth of 3046.16 m. The result of single depth analysis plot was showed that there is no need to used sand screen at first period of production and well X4 can be producing until the pore pressure depletes to 2850 psi and bottom hole pressure to 1100 psi. The most essential feature of the offered results is the economic side, as sanding prevention tools and operations are expensive, thus employing them must be done after consulting with experts.