With the development of China railway high-speed, the total operation mile of the network is more than 30 thousand kilometers, and over 3600 high-speed Electric Motor Units are deployed, ranking China the world's largest high-speed rail network. Under the condition of high-speed railway network, it is increasingly urgent to plan the operation and maintenance schemes of EMUs among multiple depots. Dedicated to the optimization problem of EMU's operation and repair plan around network, this paper analyzed the repair resource sharing strategy between depots, took the running data of EMU networked operation mode as input, formulated an integer model which was subjected to the constraints of maximal off-line repair number limit of EMUs, maintenance regulation of Level-1/2, and repair resource sharing rules, and aimed at decreasing maintenance cycle waste mileage as the objective function. The ant colony optimization algorithm was applied to solve the model. Finally, by practical testing, it was validated that the model and algorithms could obtain favorable result of the organization process of EMUs.
Interactive image segmentation is able to extract the user-specified foreground objects from the whole image, which remains to be a challenging problem in image processing and computer vision. The traditional pixel-based interactive segmentation is time-consuming and neglects the neighbor information, which is hard to achieve efficient and accurate results. To address this problem, a novel region-based approach is proposed for interactive image segmentation. The algorithm contains three stages: initial segmentation by Simple Linear Iterative Clustering (SLIC) superpixels, region representation combining color features and texture features, region merging based on the region similarity. A new region similarity metric based on the Normalized Cross correlation is raised to guide the region merging process with the aid of user markers. Moreover, since the region merging is a critical step in the entire process, a novel one-stage region merging strategy is exploited to improve the efficiency and robustness of the algorithm. Experiments on various images from the Berkeley dataset is conducted, and the results demonstrate the high speed and effectiveness of the proposed interactive image segmentation method.
This paper presents a complete 200Gb/s PAM-4 transmitter (TX) in 28nm CMOS technology. The transmitter features a hybrid sub-sampling PLL (SSPLL) with a delta-sigma (ΔΣ) modulator, clock distribution network with flexible timing control, and data path with a hybrid 5-tap Feed-Forward Equalizer (FFE) and T-coil for bandwidth extension. The prototype chip achieves 4.69 pJ/bit efficiency, 54mV eye height, 0.27UI eye width, and 97% RLM under ~6dB channel loss at 50GHz.
Reasonably arranging the operation scheme of EMU maintenance line is the key link in the operation organization of EMU Depot. Considering the characteristics of the maintenance line utilization, on the premise that the time of EMU occupying the maintenance line is given, the optimization model of the maintenance line optimization scheme was established, with the compatibility of the maintenance line occupation as the constraint and the balanced utilization of the maintenance line as the optimization goal. Based on the genetic algorithm, the algorithm for solving the model was designed, and the model and algorithm were verified with the actual operation data of a EMU depot.
The total operation mileage of China High-Speed railway network is more than 30 thousand kilometers, and over 3600 High-Speed Electric Motor Unit (EMU) carry out the operation, making China the largest High-Speed railway network all over the world. It benefits a lot to improve the operation efficiency and reduce the maintenance cost of High-Speed railway by scientifically planning the daily operation and repair process of EMUs. Taking the specific EMU depot as the research object, this paper proposed a regression model which includes two steps to estimate the Level-1/2 maintenance plan of EMUs. In the first step, the influence factors of average daily running mileage of EMUs are analyzed, and a multiple regression model with the EMU routing, allocated number of EMUs to the depot, on-line rate, and average fault rate as the independent variables was built to forecast the average daily running mileage. Based on the average daily running mileage of each EMUs as input, the second step constructed an optimized model with the minimum maintenance cycle waste mileage as the objective function to equalize the maintenance expiration time between multiple EMUs. To solve the optimization model, particle swarm optimization was applied to obtain the best solution. Finally, this paper predicted the repair plan of EMUs of the depot instance in the year 2021.