The Poza de la Sal diapir is a closed circular depression with Cretaceous Mesozoic materials, formed by gypsum, Keuper clays, and a large extension of salt in the center with intercalations of ophite. The low seismic activity of the area, the reduced permeability and porosity of the salt caverns, and the proximity to the Páramo de Poza wind park, make it a suitable place for the construction of a facility for underground storage of green hydrogen obtained from surplus wind power. The design of a cavern for hydrogen storage at a depth of 1000 m takes into account the differences in stresses, temperatures, and confining pressures involved in the salt deformation process. During the 8 months of the injection phase, 23.0 GWh can be stored in the form of hydrogen obtained from the wind energy surplus, to be used later in the extraction phase. The injection and extraction ratio must be developed under the conditions of geomechanical safety of the cavity, so as to minimize the risks to the environment and people, by conditioning the gas pressure inside the cavity to remain within a given range.
17 August 2024 in International Journal of Hydrogen Energy
In the framework of CO2 capture and geological storage, risk analysis plays an important role, because it is an essential requirement of knowledge to make up a local, national and supranational definition and planning of carbon injection strategies. This is because each project is at risk of failure. Even from the early stages, it should take into consideration the possible causes of this risk and propose corrective methods along the process, i.e., managing risk. Proper risk management reduces the negative consequences arising from the project. The main method of reduction or neutralizing of risk is mainly the identification, measurement and evaluation of it, together with the development of decision rules. This report presents a methodology developed for risk analysis and the results of its application. The risk assessment requires determination of the random variables that will influence the functioning of the system. It is very difficult to set-up a probability distribution of a random variable in the classical sense (objective probability) when a particular event rarely occurred or even it has an incomplete development. In this situation, we have to determine the subjective probability, especially at an early stage of projects, when we have not enough information about the system. This subjective probability is constructed from assessment of expert judgement to estimate the possibility of certain random events could happen depending on geological features of the area of application. The proposed methodology is based on the application of Bayesian probabilistic networks to estimate the probability of risk of leakage. These probabilistic networks can define graphically the relations of dependence between the variables and joint probability function through a local factorization of probability functions.
2 February 2022 in Science of The Total Environment