By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low-beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some of the criteria and were disassembled. Lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this article, we present a summary of: 1) the fabrication and test data for all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance.
1 January 2018 in IEEE Transactions on Applied Superconductivity
The Central Solenoid (CS) is the backbone of the ITER magnet system. It consists of six independent coils held together by a vertical pre-compression structure that must react tensile loads and provide sufficient preload to maintain coil-to-coil contact during all stages of plasma operation. Material selection and specifications applicable to the structural components of the pre-compression structure are particularly demanding. These include large forgings manufactured from a high strength austenitic stainless steel (FXM-19) with a stringent specification in terms of microstructure and maximum allowed magnetic permeability. Stringent requirements are also imposed on all welded joints. In particular, the attachment welds of the cooling pipes to the structure are subject to challenging restrictions in terms of weld imperfections and geometry. They must induce limited distortion of the components and are submitted to inspections carried out in accordance with the most severe acceptance levels of applicable standards. The results of extensive characterizations based on non-destructive and destructive evaluation of samples from different components and welds are reported in this paper, particularly focusing on the quality achieved at the microstructural and macrostructural level. The influence of the microstructure on the properties and on the inspectability of the material by non-destructive examinations is discussed.
12 April 2024 in Physical Review Accelerators and Beams
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN’s Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments. The SPS has been in operation since 1976, and it has been upgraded over the years. For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams without sustaining damage that would affect its function. The latest upgrades of the SPS led to the requirement for its beam dump to absorb proton beams with a momentum spectrum from 14 to and an average beam power of up to . This paper presents the technical details of a new design of the SPS beam dump that was installed in one of the long straight sections of the SPS during the 2019–2020 shutdown of CERN’s accelerator complex within the framework of the Large Hadron Collider Injectors Upgrade Project. This new beam dump has been in the operation since May 2021, and it is foreseen that it will operate with a lifetime of 20 years. The key challenges in the design of the beam dump were linked to the high levels of thermal energy to be dissipated—to avoid overheating and damage to the beam dump itself—and high induced levels of radiation, which have implications for personnel access to monitor the beam dump and repair any problems occurring during operation. The design process, therefore, included extensive thermomechanical finite-element simulations of the beam-dump core and its cooling system’s response to normal operation and worst-case scenarios for beam dumping. To ensure high thermal conductivity between the beam-dump core and its water-cooling system, hot isostatic pressing techniques were used in its manufacturing process. A comprehensive set of instrumentation was installed in the beam dump to monitor it during operation and to cross-check the numerical models with operational feedback. The beam dump and its infrastructure design were also optimized to ensure it can be maintained, repaired, or replaced while minimizing the radiation doses received by personnel.
1 November 2004 in Journal of Materials Processing Technology
The High Luminosity Large Hadron Collider (HL-LHC) is a major upgrade to the existing Large Hadron Collider (LHC) at CERN, aimed at increasing the integrated luminosity of the collider by a factor of ten [1]. A key component of the HL-LHC are the superconducting Nb3Sn quadrupole magnets, known as MQXF, whose purpose is to focus the particle beam [3]. In order to ensure the proper operation and structural reliability of the MQXF quadrupoles, it is essential to qualify the welds of their cold mass, used as a He container of the magnets. This paper describes the process of qualification of the welds involved in the closure of the cold mass, including the testing and inspection methods used to evaluate their strength and soundness. The results of the qualification process are used to ensure that the MQXF quadrupoles cold masses can withstand the high-stress operating conditions of the HL-LHC and operate as expected at cryogenic temperature. The qualification process has been used to implement a novel approach for quality control of the production parts using Phased Array Ultrasonic Testing (PAUT). This advanced testing method uses phased array ultrasonic probes to scan the welds and generate a detail 3D image of their internal structure. This allows for a more accurate and efficient inspection of the welds, compared to traditional ultrasonic testing methods. Overall, the welding qualification process for the cold mass of the MQXF quadrupoles is a crucial step in ensuring the safe and reliable operation of the HL-LHC.
31 January 2026 in Journal of Materials Research and Technology