Ziyang Li

Ziyang Li

Auto-generated profile, based on publicly available information

Ziyang Li

State Key Laboratory of Water Disaster Prevention, Nanjing Hydraulic Research Institute, Nanjing 210029, China

Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2019 in Biotechnology & Biotechnological Equipment
Verified
Journal Article
Open access
ZLZiyang Li
Ziyang Li
JHJixiang Huo
Jixiang Huo
JBJeremy D. Bricker
Jeremy D. Bricker
Focusing on the sediment in Suyahu Reservoir (a typical plain reservoir in Henan Province, China), concentrations of eutrophication-causing substances (TOC, TN and TP) and heavy metal contamination (Zn, Pb, Cd, Cu, Cr, Ni, As and Hg) were measured. Spatial distribution of these contaminants and the resulting potential ecological risk were investigated in detail. The results indicated that the eutrophication-causing substances were concentrated in the reservoir sediment, with high concentrations in the south and low concentrations in the north due to hydrodynamics. The reservoir sediments were polluted and had an eutrophication problem due to the high average organic index. Heavy metals were deposited at the bottom near the centre of the reservoir. The comprehensive potential ecological risk index was Moderate, whereas Cd and Hg contributed 78.8% to the total risk-index values, and were the main factors of heavy mental pollution. Therefore, it was necessary to prevent and treat polluted sediments to prevent secondary pollution.

14 May 2020 in International Journal of Distributed Sensor Networks
Verified
Journal Article
Open access
PDF file
HLHanman Li
Hanman Li
ZLZiyang Li
Ziyang Li
FMFuheng Ma
Fuheng Ma
CLChengdong Liu
Chengdong Liu
The availability of massive amount of dam safety monitoring data can make it difficult to analyze and characterize dam behavior. This article describes the use of the Cloud model to transform quantitative monitoring data into qualitative information. Each monitoring point returning dam safety data is regarded as a cloud drop, and parameters such as the expectation, entropy, and hyper-entropy of the monitoring data are obtained through a backward cloud generator to represent the operational state of the dam. The monitoring points are then treated as vectors, and the cloud similarity is calculated using the cosine value of the angle between them. The cloud similarity coefficient is then determined to characterize the similarity of dam behavior. Experimental analysis shows that the process of identifying cloud parameters has a good effect on the discovery of abnormal monitoring values regarding dam safety and demonstrates the feasibility of characterizing the dam behavior. Clustering analysis is applied to the similarity coefficients to further achieve the hierarchical management of dam monitoring points.

17 April 2012
Verified
Conference Paper
Closed access
ZLZi-Yang Li
Zi-Yang Li
FMFuheng Ma
Fuheng Ma
HYHui Yuan
Hui Yuan
CLCheng-Dong Liu
Cheng-Dong Liu
Taking measured data of some reservoir rainfall Caused by typical Typhoon and environment variables of typical typhoon as a sample, the nonlinear analysis method is adopted to analyze the relationship between environmental factors of typhoon (including wind speed, wind power, wind circle radius of 7 level and 10 level, central pressure, the distance between typhoon center and the reservoir area, etc.) and reservoir rainfall. Then the form of mathematical representation of typhoon environmental factors and their effects are reduced and optimized. On this basis, the nonlinear analysis model of reservoir rainfall caused by typhoon is made up. Example analysis showed that the model reflects the nonlinear relationship between typhoon environment and reservoir rainfall caused by typhoon to certain extent, and has good fitting results.

28 August 2024 in Remote Sensing
Verified
Journal Article
Open access
PDF file
BCBingsun Chen
Bingsun Chen
YBYi Bao
Yi Bao
YSYanjiao Song
Yanjiao Song
ZLZiyang Li
Ziyang Li
ZWZhe Wang
Zhe Wang
Linyi LiLinyi Li
Linyi Li
As crucial water conservancy projects, ship locks play a key role in flood control, shipping, water resource allocation, and promoting regional economic development, making them an indispensable part of the modern water transportation system. Utilizing satellite remote sensing for lock extraction can significantly reduce manual workload and costs, assist in the daily dynamic maintenance of lock hubs, and provide more comprehensive data support for the construction and management of water transport infrastructure. In this context, this paper proposes a new method for ship lock object extraction. Leveraging fuzzy theory and prior knowledge of locks, the extraction of lock objects is achieved from Gaofen-1 (GF-1) high-resolution remote sensing images. The experimental results demonstrate that the proposed algorithm can effectively extract small lock objects in remote sensing images, achieving an average extraction accuracy of 80.9% in the study area.

1 October 2026 in Remote Sensing
Verified
Journal Article
Open access
PDF file
Ruya XiaoRuya Xiao
Ruya Xiao
WXWang Xun
Wang Xun
HYHang Yang
Hang Yang
JQJinqiu Qi
Jinqiu Qi
HWHeng Wang
Heng Wang
XHXiufeng He
Xiufeng He
Reservoir sedimentation reduces operational performance, while large-scale dredging and capacity expansion redistribute earth materials and alter engineering conditions at aging plain reservoirs. This study integrates Sentinel-1 time-series Interferometric Synthetic Aperture Radar (InSAR), multitemporal optical imagery, and ICESat-2 and Sentinel-3A altimetry to characterize the engineering transformation and associated deformation at Suyahu Reservoir, China. Optical imagery documented land-based excavation, cofferdam construction, and subsequent reinundation. Under comparable instantaneous water levels, the mapped water surface area increased from approximately 72.06 km2 in April 2020 to 87.45 km2 in April 2025, an increase consistent with changes in reservoir-bed topography and shoreline morphology. Satellite altimetry showed that the mean water level decreased from about 52.62 m before construction to 52.15 m during the main construction period, while the mean annual observed range narrowed from 1.33 to 0.68 m before increasing again from mid-2023 onward. InSAR revealed spatially heterogeneous negative line-of-sight velocities reaching approximately −40 mm/a along localized embankment sections and −50 mm/a along the monitored margins of the artificial islands. Lagged cross-correlation analysis identified no statistically significant correlations between water level variations and the monitored embankment displacement. The spatial correspondence between deformation and project-modified areas supports a plausible first-order interpretation based on local excavation, fill placement, and construction histories.