A modified single‐phase hybrid cascaded H bridge multilevel inverter with a minimum number of power electronic devices and isolated DC sources is presented in this study. It consists of two inverters (upper and lower) coupled in cascade. The lower inverter is capable of developing a multilevel output and switches at low frequency and another inverter develops two‐level output and switches at high frequency. In the proposed inverter, every additional power electronic switch in the lower inverter increases the level by four. This study also introduces a generalised hybrid modulation switching strategy, which gives arithmetical and logical expressions for switching the additional device for any required increase in levels. The voltage rating of the devices, conduction and switching loss of the proposed inverter are compared with the similarly setup topologies. The generalised hybrid modulation algorithm is simulated in MATLAB/Simulink and implemented in a SPATRAN 3A DSP board. Simulation and experimental results are presented for different loading conditions.
Reactive power compensation is a main problem in the control of electric power system. Reactive power from the source increases the transmission losses and reduces the power transmission ability of the transmission lines. In addition, reactive power must not be transmitted throughout the transmission line to a longer distance. Consequently, flexible ac transmission systems devices such as static compensator unified power‐flow controller (UPFC) and static volt‐ampere compensator are used to ease these harms. UPFC is the mainly adaptable and composite power electronic equipment that has emerged as the vital equipment for the control and optimisation of power flow in electrical power transmission system. In this study, a d–q model‐based UPFC is developed with proportional‐integral (PI) and PID controller. The above controllers are simulated using MATLAB and their performance is analysed. Outcome of the analysis shows the superiority of PID control over the PI control method. Also this study presents comparative evaluation (both controllers) of dynamic response when initial and final load disturbances.
This paper presents a novel single phase cascaded multilevel inverter for renewable energy applications. The proposed inverter consists of two H Bridge inverter connected in cascade. The top H Bridge inverter is a conventional H bridge inverter and is capable of developing three level output whereas the bottom H bridge inverter is a novel inverter which is capable of developing multilevel output. The proposed inverter is driven from a novel hybrid modulation technique, which eliminates the problem of capacitor voltage balancing issues. The proposed novel hybrid modulation technique switches the top inverter switches at high frequency and the bottom inverter switches at low frequency. The proposed inverter can be fed from any renewable energy source. In this paper, the top inverter is fed from PV arrays where as the bottom inverter is fed from wind turbine. The proposed inverter has many advantages such as; it has minimum number of power electronic devices, minimum conduction and switching losses, improved efficiency and minimum voltage stress on the devices. The proposed inverter fed from renewable energy sources is simulated in MATLAB/SIMULINK environment. To validate the simulation results a laboratory prototype is also built. The entire hardware setup is controlled by using FPGA-SPATRAN 3A DSP board.
3 March 2015 in Journal of Experimental & Theoretical Artificial Intelligence
This paper presents Multi-objective Optimal Placement of Phasor measurement units (MOPP) to improve the performance of power system monitoring and control. It is proposed for achieving complete observability with a minimal number of phasor measurement units (PMUs) and maximising the voltage stability level of the system, simultaneously. As the above mentioned objectives are conflicting in nature, a fuzzified binary artificial bee colony algorithm is considered to solve the MOPP problem to offer a good tradeoff solution between the competing objectives. Here, fuzzy membership for each objective function is designed and proposed to decide the best solution of MOPP problem. Initially, weak buses are identified using the fast voltage stability index calculation for their close and reliable monitoring. This is done in order to prevent the outage of these buses. The conventional rule is used to minimise the number of PMUs and a new rule is proposed to maximise both the observability and voltage stability levels of the system. The efficiency of the artificial bee colony method is validated on IEEE 14, 30 and 57 bus test systems and it is verified by comparing the performance of proposed method with earlier works.
1 January 2014 in Advances in Electrical and Computer Engineering
This paper presents a Multi- objective Optimal Placement of Phasor Measurement Units (MOPP) method in large electric transmission systems. It is proposed for minimizing the number of Phasor Measurement Units (PMUs) for complete system observability and maximizing the measurement redundancy of the system, simultaneously. The measurement redundancy means that number of times a bus is able to monitor more than once by PMUs set. A higher level of measurement redundancy can maximize the total system observability and it is desirable for a reliable power system state estimation. Therefore, simultaneous optimization of the two conflicting objectives are performed using a binary coded Artificial Bee Colony (ABC) algorithm. The complete observability of the power system is first prepared and then, single line loss contingency condition is considered to the main model. The efficiency of the proposed method is validated on IEEE 14, 30, 57 and 118 bus test systems. The valuable approach of ABC algorithm is demonstrated in finding the optimal number of PMUs and their locations by comparing the performance with earlier works