Chavanont Khosakitchalert

Chavanont Khosakitchalert

Auto-generated profile, based on publicly available information

Chavanont Khosakitchalert

Chulalongkorn University

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2019 in Automation in Construction
Verified
Journal Article
Closed access
CKChavanont Khosakitchalert
Chavanont Khosakitchalert
NYNobuyoshi Yabuki
Nobuyoshi Yabuki
Tomohiro FukudaTomohiro Fukuda
Tomohiro Fukuda

26 February 2020 in Automation in Construction
Verified
Journal Article
Closed access
CKChavanont Khosakitchalert
Chavanont Khosakitchalert
NYNobuyoshi Yabuki
Nobuyoshi Yabuki
Tomohiro FukudaTomohiro Fukuda
Tomohiro Fukuda

28 November 2024 in Ain Shams Engineering Journal
Verified
Journal Article
Open access
TSTaki Eddine Seghier
Taki Eddine Seghier
CKChavanont Khosakitchalert
Chavanont Khosakitchalert
Ziwen LiuZiwen Liu
Ziwen Liu
COChukwuka Christian Ohueri
Chukwuka Christian Ohueri
YLYaik-Wah Lim
Yaik-Wah Lim
AZAhmad Fahmi Bin Zainazlan
Ahmad Fahmi Bin Zainazlan

22 July 2018 in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
Verified
Conference Paper
Closed access
CKChavanont Khosakitchalert
Chavanont Khosakitchalert
NYNobuyoshi Yabuki
Nobuyoshi Yabuki
Tomohiro FukudaTomohiro Fukuda
Tomohiro Fukuda
I.A.A.R.C. - International Association for Automation and Robotics in Construction Civil Engineering

18 December 2020 in Journal of Information Technology in Construction
Verified
Journal Article
Open access
PDF file
CKChavanont Khosakitchalert
Chavanont Khosakitchalert
NYNobuyoshi Yabuki
Nobuyoshi Yabuki
Tomohiro FukudaTomohiro Fukuda
Tomohiro Fukuda
Quantity takeoff based on building information modeling (BIM) is more reliable, accurate, and rapid than the traditional quantity takeoff approach. However, the quality of BIM models affects the quality of BIM-based quantity takeoff. Our research focuses on drywalls, which consist of wall framings and wall panels. If BIM models from the design phases do not contain wall framing models, contractors or sub-contractors cannot perform quantity takeoff for purchasing materials. Developing wall framing models under a tight schedule in the construction phase is time-consuming, cost-intensive, and error-prone. The increased geometries in a BIM model also slow down the software performance. Therefore, in this research, an automatic method is proposed for calculating quantities of wall framings from drywalls in a BIM model. Building elements that overlap with the drywalls are subtracted from the drywall surfaces before calculation. The quantities of wall framings are then embedded into the properties of drywall in the BIM model and hence they can be extracted directly from the BIM model. A prototype system is developed and the proposed method is validated in an actual construction project. The results of the case study showed that the prototype system took 282 s to deliver accurate quantities of wall framings with deviations of 0.11 to 0.30% when compared to a baseline, and the file size of the BIM model after applying the proposed method was increased very slightly from 47.0 MB to 47.1 MB. This research contributes to developing an approach for quantity takeoff of wall framings that are not present in a BIM model. Accurate quantities of wall framings can be obtained while the time and cost of developing wall framings for quantity takeoff can be saved. The proposed method does not increase the geometries in the BIM model; therefore, the file size of the model does not increase greatly, which stabilizes the software performance.