6 June 2008 in IEEE Transactions on Applied Superconductivity
The ITER coils are all designed using superconducting conductors with a high current carrying capability. Plasma operation and control requires fast variation of the currents in the pulsed coils inducing more than 10 kV during normal operation on the coil terminals. The power supplies are designed to limit the high voltages, but under short conditions, voltages may rise above 20 kV in certain coils. Moreover, the acceptance tests of the coils must be carried out at higher voltages, up to 28 kV for the CS coils. The electrical design philosophy of the coils includes recovery options in the event of electrical faults internal to the coils.
11 December 2013 in Nuclear Fusion
Construction of the ITER magnet systems has been started at the end of 2007 following the signature of the first procurement arrangements (PA) for the toroidal field (TF) conductors. Six ITER members are involved in the share of the ITER magnet components and, to date, eighteen PA between the ITER Organization and six domestic agencies have been signed. Substantial progress towards full-scale construction has been achieved with the placement of the first large manufacturing contracts, the production of several tens of tons of advanced Nb3Sn and NbTi strand, and the set-up of large cabling and jacketing facilities. The detailed design of the coils and support structures has also been finalized. The qualification of the fabrication processes for the TF coils and poloidal field (PF) coils has been initiated. The detailed design of the central solenoid (CS) coils is being developed. The design of the correction coils (CCs) with their support structures has been finalized, as well as for the TF gravity supports and clamps of the PF coils. The manufacture of prototypes of the feeder lines and current leads has been started, while ITER is in charge of the procurement of the required magnet instrumentation. This paper provides a progress report on the ITER magnet construction as per December 2010.
7 February 2022 in IEEE Transactions on Applied Superconductivity
Fusion for Energy (F4E), the European Domestic Agency for the International Thermonuclear Experimental Reactor (ITER), is responsible for the supply of 5 out of the 6 Poloidal Field (PF) Coils: PF2-PF6. One coil, PF1, is being manufactured by the Russian Federation Domestic Agency (RFDA). While the 10 m diameter PF6 was manufactured by the Institute of Plasma Physics Chinese Academy of Sciences (ASIPP) and tested in the cold test facility at Cadarache under a collaboration agreement with F4E; coils PF2-PF5 are currently being manufactured on site, close to the Tokamak building, their size ranging from 17 to 24 m diameter and weights from 200 to 400 T. This article describes the final acceptance tests performed on the coils PF5 and PF6, the testing setup, paying special attention to the tests performed before, after and during the cool-down at 80 K. The tests cover a wide range of aspects of the operation at cryogenic temperatures: ranging from the high voltage electrical insulation performance during the potential fault conditions during plasma operation, leak tightness under vacuum and pressure drop behavior of its hydraulic system during operation with forced flow helium. In addition, we will briefly introduce the results for the current center line (CCL) calculation obtained for PF5 and PF6.
23 July 2007 in IEEE Transactions on Applied Superconductivity
The Wendelstein 7-X (W7-X) coils and structures are part of the largest superconducting fusion device being constructed at present. They represent a technical challenge at industrial level due to the stringent design requirements and the need for proven techniques and manufacturing processes in accordance to the highest quality standards. The production of these components requires the management of large contracts with a series of sub-suppliers and the collaboration with other research institutes for qualification and full-scale tests. This paper gives an overview of the manufacturing status, as well as the main project management and technical challenges. The lessons learned in the large scale production of this kind of magnet systems will be presented as relevant experience for the realization of future fusion devices, such as ITER.