25 January 2018 in IEEE Transactions on Applied Superconductivity
Previous studies indicated that the use of high-temperature superconductors (HTS) in the highest field allows achieving the required magnetic flux in the central solenoid (CS) of the European DEMO at a reduced outer diameter, which would enable a reduced overall size and cost of DEMO. The proposed winding pack (WP) design of the CS1 module is based on 10 layer-wound sub-coils using HTS, react & wind Nb$_{3}$Sn and NbTi conductors in the high, medium and low field sections, respectively. The design utilizes a stainless steel and a superconductor grading leading to different overall current densities in each of the 10 sub-coils. Both, the hoop stress and the vertical loads are taken into consideration for determination of the required stainless steel cross-section in the winding pack. The stainless steel grading has been found to have an even more pronounced effect on the overall sub-coil current densities than the superconductor grading. A preliminary estimation of the space required for the pre-compression structure is also reported.
29 March 2010 in IEEE Transactions on Applied Superconductivity
One year of operation and test activity of the SULTAN test facility at CRPP-Villigen, from October 2008 to October 2009 is reviewed. The main improvements of the facility include a new control system for the cryo-plant and a new electric motor for the helium compressor. The range of operation for the SULTAN samples has been improved in terms of cyclic loading rate. The test campaigns from October 2008 to October 2009 include eight ITER TF conductor samples, two JT60SA samples and a number of other developmental samples. The highlights of the test campaign and the statistical data about cool-downs, warm-ups and test duration are reported. For the eight ITER TF samples, more detail is given about the joint development, the standard test program and the data reduction for the assessment of the results. Eventually, an outlook in the next operation period is also discussed.
5 June 2009 in IEEE Transactions on Applied Superconductivity
Many full size conductors for the ITER TF coils have been tested at the SULTAN test facility in Switzerland for conductor qualification. JAEA tested two samples and two kinds of Nb3Sn strands were evaluated through the tests. Now another sample named JATF3 has been tested, which uses two other kinds of Nb3Sn strands. The strands satisfy the critical current density Jc requirement, but results of the conductor test were lower than our expectation. After the test, JAEA has been investigating the reason by X-ray CT scan and destructive inspection, and has found a possible reason.
22 February 2019 in IEEE Transactions on Applied Superconductivity
In 2013, the EUROfusion organization launched the pre-conceptual design studies of the fusion DEMO tokamak. Sev-eral options of superconducting magnet design are investigated within the scope of the project. The magnets based on $\rm Nb_{3}Sn$ , namely the Toroidal Field (TF) and Central Solenoid (CS) coils, can be made either using the Wind and React technology, as in ITER, or React and Wind (RW) technology with potentially significant cost-saving benefits. Within the R and D program of the Swiss Plasma Center, the first full-size DEMO TF RW conductor prototype, RW1, was manufactured and tested in 2015-2016. The second, im-proved prototype, RW2, was built and tested in 2017-2018. The ex-perimental results collected over several test campaigns performed on four assemblies of RW2 rated for 63 kA at 12.23 T are present-ed. The current sharing temperature $T_{cs}$ of the latest RW2 assem-bly in DEMO operating conditions reached 7.16 K after 1000 elec-tromagnetic cycles and four thermal cycles. This $T_{cs}$ corresponds to the effective strain $\epsilon_{\rm eff} = -0.27 %$ , significantly exceeding the design requirement of $T_{cs}\geq 6.7 {\rm K}$ . If RW2 have been used in ITER TF coils, the $T_{cs}$ at 68 kA and 10.9 T would be 7.42 K, i.e. approximate-ly 1 K higher than most of the ITER TF samples, and that with on-ly 55 % of $\rm Nb_{3}Sn$ used in ITER TF conductor. The tests of RW2 proved that the cost-saving potential of the React and Wind technolo-gy is enormous.
4 March 2021 in IEEE Transactions on Applied Superconductivity
High Temperature Superconductors (HTS) are promising materials for future fusion magnets. One of HTS conductors' main issues is the quench protection: the quench develops much slower than in LTS, delaying the quench detection by voltage monitoring and causing a massive temperature increase before detection. The Swiss Plasma Center (SPC), with the support of EUROFusion, has upgraded the SULTAN facility to test large current conductors during the whole quench evolution. The 100 kA superconducting transformer has been replaced by an 18 kA direct power supply, which allows sustaining the operating current in the sample during a quench. Five HTS conductors have been manufactured at SPC: they are sub-size of the HTS high-current cables designed by the group for an HTS high current high field cable proposed for EU-DEMO Central Solenoid (CS) hybrid magnet. Every conductor has a specific feature. The aim is to compare the quench behavior of the five conductors “parametrically”. The commissioning of the upgraded facility and the preliminary results of the measurements are presented in this work.
4 December 2017 in IEEE Transactions on Applied Superconductivity
The React&Wind (RW) method for the large Nb 3 Sn magnets of the EUROfusion DEMO device was proposed in 2013 by the Swiss Plasma Center. A first short-length prototype conductor for the toroidal field (TF) coils, named RW1, was tested in the EDIPO test facility during 2015-2016 up to 82 kA at 13 T, with an effective strain matching the expected thermal strain of ≈-0.30%. After the baseline of the DEMO device was updated in 2015, the new requirements led to an updated conductor design, for 63 kA at 12.2 T. The manufacturing experience of the first prototype, named RW1, is exploited in a second short-length prototype conductor, named RW2, assembled and tested in 2017: The conductor aspect ratio is reduced, and the segregated copper wires are replaced by a solid block of mixed matrix stabilizer. Although designed for the TF coils, with dc operation, the moderate ac loss of the flat cable makes the RW2 a good candidate also for the central solenoid conductor. The Nb 3 Sn strand for RW2 is supplied by WST (PRC), and the flat cable is made at TRATOS (Italy). The rationale of the design, the conductor manufacture, the sample assembly, and the test results in SULTAN are reported.