Liam N. Schenk

Liam N. Schenk

Auto-generated profile, based on publicly available information

Liam N. Schenk

U.S. Geological Survey, 63095 Deschutes Market Road, Bend, OR, USA

Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2021 in Journal of Environmental Management
Verified
Journal Article
Closed access
LSLiam Schenk
Liam Schenk
HBHeather Bragg
Heather Bragg

1 January 2012
Verified
Report
Open access
DED. Blake Eldridge
D. Blake Eldridge
SESara L. Caldwell Eldridge
Sara L. Caldwell Eldridge
LSLiam N. Schenk
Liam N. Schenk
DTDwight Q. Tanner
Dwight Q. Tanner
TWTamara Wood
Tamara Wood


1 January 2016
Verified
Report
Closed access
PDF file
LSLiam N. Schenk
Liam N. Schenk
CAChauncey W. Anderson
Chauncey W. Anderson
PDPaul Diaz
Paul Diaz
MSMarc A. Stewart
Marc A. Stewart
Suspended-sediment and total phosphorus loads were computed for two sites in the Upper Klamath Basin on the Wood and Williamson Rivers, the two main tributaries to Upper Klamath Lake. High temporal resolution turbidity and acoustic backscatter data were used to develop surrogate regression models to compute instantaneous concentrations and loads on these rivers. Regression models for the Williamson River site showed strong correlations of turbidity with total phosphorus and suspended-sediment concentrations (adjusted coefficients of determination [Adj R2]=0.73 and 0.95, respectively). Regression models for the Wood River site had relatively poor, although statistically significant, relations of turbidity with total phosphorus, and turbidity and acoustic backscatter with suspended sediment concentration, with high prediction uncertainty. Total phosphorus loads for the partial 2014 water year (excluding October and November 2013) were 39 and 28 metric tons for the Williamson and Wood Rivers, respectively. These values are within the low range of phosphorus loads computed...

1 January 2024
Verified
Report
Open access
PDF file
MKMackenzie K. Keith
Mackenzie K. Keith
JWJ. Rose Wallick
J. Rose Wallick
LSLiam N. Schenk
Liam N. Schenk
LGLaurel E. Stratton Garvin
Laurel E. Stratton Garvin
GGGabriel W. Gordon
Gabriel W. Gordon
HBHeather M. Bragg
Heather M. Bragg
Chapter A. IntroductionFall Creek Dam impounds Fall Creek Lake, a 10-kilometer-long reservoir in western Oregon and is operated by the U.S. Army Corps of Engineers (USACE) primarily for flood-risk management (or flood control) in late autumn through early spring months, as well as for water quality, irrigation, recreation, and habitat in late spring through early autumn. Since 2011 (water year [WY] 2012), Fall Creek Lake has been temporarily drawn down each year to facilitate downstream passage of juvenile spring Chinook salmon (Oncorhynchus tshawytscha) through the 55-meter (m) high dam. This annual dam operation is temporary, typically lasting about 1–2 weeks from WY 2012 through 2020 (drawdown operations in WY 2022–24 have increased to more than 6 weeks). Drawdown of the reservoir results in lake levels being lowered to the elevation near the historical, pre-dam streambed. The annual streambed drawdowns of WY 2012–18 have improved fish passage and led the USACE to formally adopt streambed drawdowns as part of annual operations at Fall Creek Dam. However, temporarily lowering the lake to streambed creates free-flowing conditions in the reservoir that result in the erosion and episodic export of predominantly sand and finer-grained sediments (less than 2 millimeters [mm]) to the lower gravel-bed reaches of Fall Creek and the Middle Fork Willamette River. The introduction of large volumes of sand and finer-grain sediment into the dam-regulated reaches downstream from Fall Creek Dam prompted questions about the geomorphic responses to annual streambed drawdowns within Fall Creek Lake and downstream reaches along Fall Creek and the Middle Fork Willamette River. The U.S. Geological Survey (USGS) in partnership with USACE initiated a comprehensive geomorphic and sediment transport investigation to assess the coupled processes of reservoir erosion, sediment evacuation from Fall Creek Lake, and patterns of sediment transport and deposition in reaches downstream from the Fall Creek Dam that have resulted from annual streambed drawdowns.The purpose of this report is to systematically describe the processes of sediment erosion, transport, and deposition at Fall Creek Lake and geomorphic interactions between reaches upstream and downstream from Fall Creek Dam that relate to dam operations. Specifically, this report focuses on evaluating geomorphic responses to streambed drawdowns from WY 2012 through 2018 and placing drawdown-induced geomorphic responses within the broader context of physiographic and historical conditions and dam operations of Fall Creek and Middle Fork Willamette Rivers. Key objectives for this study were to characterize changes in reservoir morphology and substrate at Fall Creek Lake, describe the character and temporal pattern of sediment transport downstream from Fall Creek Dam, characterize geomorphic changes in channel reaches downstream from the Fall Creek Dam, and relate these data to the annual streambed drawdowns of WY 2012–18. This study uses multiple independent monitoring and measurement approaches to assess site, reach, and river-scale geomorphic responses to drawdowns to inform dam and reservoir management. Patterns and processes of reservoir evolution were assessed with geomorphic mapping and volumetric analyses of topography through comparison of multiple digital surface models (DSMs). Just downstream from Fall Creek Dam, analyses of sediment export from the reservoir focused on suspended sediment but also incorporated bedload analyses to assess sediment sizes. Geomorphic assessments downstream from the dam used reach-scale and site-scale approaches to document changes in channel morphology and substrate, including site measurements of sand and finer-grained sediment deposition and in-channel bed-material, volumetric change analyses from comparison of digital elevation models (DEMs), and repeat geomorphic mapping. Findings from this study inform river management and dam operations by providing an understanding of (1) coupled upstream-downstream geomorphic responses to the Fall Creek Lake streambed drawdowns, (2) geomorphic responses of Fall Creek Lake streambed drawdowns in comparison to drawdowns at other large dams, (3) controls on reservoir erosion and downstream geomorphic responses, and (4) implications for future hydrogeomorphic changes that may result from continued drawdowns and monitoring activities to assess those changes.Chapter B. Reservoir Morphology and Evolution Related to Dam Operations at Fall Creek LakeTo understand the volume and distribution of sediment accumulation in Fall Creek Lake since dam closure in 1965, decadal-scale sedimentation patterns (spanning approximately 1965–2016) are evaluated using a combination of storage curve analyses and geomorphic mapping. Short-term (drawdown event-scale) patterns of erosion, sedimentation, and sediment export downstream are evaluated using a combination of geomorphic mapping and change detection analyses that quantify the distribution and total volume of sediment erosion and deposition within Fall Creek Lake.Geomorphic mapping of reservoir topography and analyses of historical datasets reveals four categories of landforms and sediment processes within Fall Creek Lake related to lake level operations:lacustrine sedimentation expressed in the reservoir floor,fluvial erosion and deposition within historical stream channels during streambed drawdowns,channel-like features created by erosion within the reservoir floor during streambed drawdowns, anderosion on reservoir hillslopes.Where the reservoir floor is mapped for this study as pelagic (deep water), deposition up to 3 meters (m) thick by lacustrine processes and burial of pre-dam topography with deposits thinning toward the edges of the valley floor and upstream areas of reservoir are observed. Despite over 50 years of sediment accumulation since dam construction, the main stream channels of Fall and Winberry Creeks...

1 January 2018
Verified
Report
Open access
PDF file
LSLiam N. Schenk
Liam N. Schenk
MSMarc A. Stewart
Marc A. Stewart
SESara L. Caldwell Eldridge
Sara L. Caldwell Eldridge
The U.S. Geological Survey and Bureau of Reclamation collected water-quality data from March 2012 to March 2015 at twelve locations in the Lost River and Klamath River Basins, Oregon, in an effort to characterize water quality and compute a nutrient budget for the Bureau of Reclamation Klamath Reclamation Project. Total phosphorus (TP), total nitrogen (TN), 5-day biochemical oxygen demand (BOD5), and 5-day carbonaceous biochemical oxygen demand (CBOD5) loads indicated higher loads at the upper boundary on the southern end of Upper Klamath Lake upstream of the Bureau of Reclamation A Canal diversion compared to the lower boundary on the Klamath River downstream of Keno Dam. Accounting for the diversion of loads down A Canal, BOD5 and CBOD5 loads decreased between these two sites during irrigation season, indicating that the Klamath Reclamation Project is not a large source of oxygen-demanding material and that much of the oxygen demand at study site FMT, the northern boundary of the study area, has been expressed by the time the same water passes through site KRK, at the southern boundary of the study area. An evaluation of the nutrient balance along the Klamath River flowpath from sites FMT to KRK indicated that, during irrigation season in the 3 years of the study period (March 2012–March 2015), more loads of TP, TN, BOD5, and CBOD5 were being diverted from the Klamath River than were being added to the Klamath River from the combination of Klamath Straits Drain, regulated point sources along the Klamath River, and internal loading from the bottom sediments in the river. By contrast, during non-irrigation seasons, more loads were added to the Klamath River than were diverted through Ady and North Canals, and this difference primarily was due to additional loads to the river from the Lost River Diversion Channel. The smallest loads were computed for the farthest upstream sites in the Lost River Basin, suggesting that the upper Lost River Basin does not contribute substantial loads of TP, TN, BOD5, and CBOD5 to the Klamath Reclamation Project. TP, TN, BOD5, and CBOD5 loads estimated during the study period likely were smaller than long-term average conditions because of persistent drought conditions in the Upper Klamath Basin. The study results, therefore, fail to characterize loads from the Klamath Reclamation Project to the Klamath River that could be present in typical years, and suggest the need for load assessments during average or above-average streamflow years.