Chapter A. IntroductionFall Creek Dam impounds Fall Creek Lake, a 10-kilometer-long reservoir in western Oregon and is operated by the U.S. Army Corps of Engineers (USACE) primarily for flood-risk management (or flood control) in late autumn through early spring months, as well as for water quality, irrigation, recreation, and habitat in late spring through early autumn. Since 2011 (water year [WY] 2012), Fall Creek Lake has been temporarily drawn down each year to facilitate downstream passage of juvenile spring Chinook salmon (Oncorhynchus tshawytscha) through the 55-meter (m) high dam. This annual dam operation is temporary, typically lasting about 1–2 weeks from WY 2012 through 2020 (drawdown operations in WY 2022–24 have increased to more than 6 weeks). Drawdown of the reservoir results in lake levels being lowered to the elevation near the historical, pre-dam streambed. The annual streambed drawdowns of WY 2012–18 have improved fish passage and led the USACE to formally adopt streambed drawdowns as part of annual operations at Fall Creek Dam. However, temporarily lowering the lake to streambed creates free-flowing conditions in the reservoir that result in the erosion and episodic export of predominantly sand and finer-grained sediments (less than 2 millimeters [mm]) to the lower gravel-bed reaches of Fall Creek and the Middle Fork Willamette River. The introduction of large volumes of sand and finer-grain sediment into the dam-regulated reaches downstream from Fall Creek Dam prompted questions about the geomorphic responses to annual streambed drawdowns within Fall Creek Lake and downstream reaches along Fall Creek and the Middle Fork Willamette River. The U.S. Geological Survey (USGS) in partnership with USACE initiated a comprehensive geomorphic and sediment transport investigation to assess the coupled processes of reservoir erosion, sediment evacuation from Fall Creek Lake, and patterns of sediment transport and deposition in reaches downstream from the Fall Creek Dam that have resulted from annual streambed drawdowns.The purpose of this report is to systematically describe the processes of sediment erosion, transport, and deposition at Fall Creek Lake and geomorphic interactions between reaches upstream and downstream from Fall Creek Dam that relate to dam operations. Specifically, this report focuses on evaluating geomorphic responses to streambed drawdowns from WY 2012 through 2018 and placing drawdown-induced geomorphic responses within the broader context of physiographic and historical conditions and dam operations of Fall Creek and Middle Fork Willamette Rivers. Key objectives for this study were to characterize changes in reservoir morphology and substrate at Fall Creek Lake, describe the character and temporal pattern of sediment transport downstream from Fall Creek Dam, characterize geomorphic changes in channel reaches downstream from the Fall Creek Dam, and relate these data to the annual streambed drawdowns of WY 2012–18. This study uses multiple independent monitoring and measurement approaches to assess site, reach, and river-scale geomorphic responses to drawdowns to inform dam and reservoir management. Patterns and processes of reservoir evolution were assessed with geomorphic mapping and volumetric analyses of topography through comparison of multiple digital surface models (DSMs). Just downstream from Fall Creek Dam, analyses of sediment export from the reservoir focused on suspended sediment but also incorporated bedload analyses to assess sediment sizes. Geomorphic assessments downstream from the dam used reach-scale and site-scale approaches to document changes in channel morphology and substrate, including site measurements of sand and finer-grained sediment deposition and in-channel bed-material, volumetric change analyses from comparison of digital elevation models (DEMs), and repeat geomorphic mapping. Findings from this study inform river management and dam operations by providing an understanding of (1) coupled upstream-downstream geomorphic responses to the Fall Creek Lake streambed drawdowns, (2) geomorphic responses of Fall Creek Lake streambed drawdowns in comparison to drawdowns at other large dams, (3) controls on reservoir erosion and downstream geomorphic responses, and (4) implications for future hydrogeomorphic changes that may result from continued drawdowns and monitoring activities to assess those changes.Chapter B. Reservoir Morphology and Evolution Related to Dam Operations at Fall Creek LakeTo understand the volume and distribution of sediment accumulation in Fall Creek Lake since dam closure in 1965, decadal-scale sedimentation patterns (spanning approximately 1965–2016) are evaluated using a combination of storage curve analyses and geomorphic mapping. Short-term (drawdown event-scale) patterns of erosion, sedimentation, and sediment export downstream are evaluated using a combination of geomorphic mapping and change detection analyses that quantify the distribution and total volume of sediment erosion and deposition within Fall Creek Lake.Geomorphic mapping of reservoir topography and analyses of historical datasets reveals four categories of landforms and sediment processes within Fall Creek Lake related to lake level operations:lacustrine sedimentation expressed in the reservoir floor,fluvial erosion and deposition within historical stream channels during streambed drawdowns,channel-like features created by erosion within the reservoir floor during streambed drawdowns, anderosion on reservoir hillslopes.Where the reservoir floor is mapped for this study as pelagic (deep water), deposition up to 3 meters (m) thick by lacustrine processes and burial of pre-dam topography with deposits thinning toward the edges of the valley floor and upstream areas of reservoir are observed. Despite over 50 years of sediment accumulation since dam construction, the main stream channels of Fall and Winberry Creeks...