26 January 2024 in IEEE Transactions on Applied Superconductivity
The SuperRail project consists in the development, manufacturing, installation and long-term operation of a high temperature superconducting (HTS) dc cable system for railway applications. The objectives of the project are to reinforce the power supply of the Montparnasse railway station in Paris, to increase the traffic and to participate to the reduction of CO 2 emission. The saturated underground in the center of Paris does not allow to create new right of ways and only the HTS cable technology allows to carry the required power to railway tracks using the few available 100 mm conduits left. The HTS cable system must answer to a load chart with a high level of requirements corresponding to the connection of a substation to a set of railways tracks in very constraints areas. In the case of SuperRail, two 60-meter long 1.5 kV–3.5 kA HTS dc cables made of second-generation (2G) conductors will be installed in parallel. They need to sustain a 67 kA–200 ms short-circuit current. The cryogenic system is specifically designed for this project. It is based on a Reverse Turbo-Brayton cycle producing cooling power of about 1700 W at 67 K. This system intends to ensure low maintenance during life cycle, high reliability and would be scalable for future application (not limited to railways). In parallel, prospective studies are being carried out to simulate superconducting cables in railway networks, and to find original solutions to replace the current leads. SuperRail is a landmark project, as it is the first time that a dc HTS cable system is installed on a commercially operated railway network. The technologies developed have the potential to be reproduced in similar cases existing in large cities.
7 February 2025 in IEEE Transactions on Applied Superconductivity
The SuperRail project, backed by the French government, will be the first installation of a high-temperature superconducting (HTS) cable system on a commercially operated railway electric grid. The project's goal is to develop, manufacture, install and operate a HTS DC cable system at the Montparnasse railways station in Paris. HTS technology provides here the only viable solution to increase the power supply from the railway traction substation to a group of railway tracks in such densely populated areas, strengthening and securing the railway grid, and helping to meet national low-carbon emission targets. Two 60 m long 1.5 kV-3.5 kA HTS DC cables made of 2G conductors will be installed in parallel. They are designed to meet stringent load requirements and to sustain a 67 kA-100 ms short-circuit current. Prior to the installation at Montparnasse, a 35-m HTS cable type test loop was installed and tested at the SNCF Railway Test Agency (SNCF-AEF). This loop includes two terminations, one joint, and a cooling system. This paper provides a detailed description of the type test loop and of the type test results, including thermal cycles, pressure tests, dielectric and lightning impulse tests, nominal current tests, system losses characterization, fault current test, and V-I characterization. The results confirm that the cable system met its design specifications, qualifying it for the SuperRail installation and for future railway projects.
5 February 2024 in IEEE Transactions on Applied Superconductivity
Achieving Net Zero requires a significant increase in electricity demand for transportation, heating, and industrial sectors. However, the increase in demand poses a challenge for heavily congested urban networks. High-Temperature Superconductor (HTS) 275 kV cables offer a credible technology solution that can uprate existing cable routes up to five times higher capacity density, utilizing existing 275 kV substations and removing the need to uprate circuits to 400 kV. This paper presents a detailed technical design and cost-benefit analysis for the cable installation. The technical analysis covers location selection, power system considerations, and standards alignment. A 12.9 km long 275 kV cable has been designed using cold dielectric and three separate phases. An equivalent circuit model was built using distance and differential protection methods to study the operation during different fault scenarios. A Standard mapping exercise has been performed to understand the gaps between the HTS and conventional cables by covering seven existing standards to identify the further tests to de-risk the technology. The economic analysis by considering the full lifecycle shows HTS is the economic for the chosen location with instances where substation equipment or land expansion costs are dominant.
1 June 2007 in 2007 IEEE Power Engineering Society General Meeting
The US Department of Energy is currently funding the design, development and demonstration of the first long length, transmission level voltage, cold dielectric, high temperature superconductor power cable. The cable is designed for permanent installation in the Long Island Power Authority (LIPA) grid and will be able to carry 574 MVA at a voltage of 138 KV. The project is led by American Superconductor and the team is comprised of Nexans, Air Liquide and LIPA. This paper will describe the goals of the project, an overview of the cable design, refrigeration system and site design. It will also include the statistics of the HTS wire manufactured for this project, the results of the qualification testing on a prototype 30 meter cable and the preparation work of the refrigerator system. The cable will be completed and put into service in the LIPA grid in 2007.
6 February 2024 in IEEE Transactions on Applied Superconductivity
The global shift towards zero carbon emissions has led to an increased demand for electricity, (e.g., For electrification of heat, transportation, etc.). High-temperature superconductor (HTS) cables offer a high-capacity and small-footprint solution compared to traditional cable technologies, making them ideal for densely populated areas. HTS cables, however, possess different electrical characteristics compared to conventional cables. This paper presents a specific case study of a 12.9 km long 275 kV HTS cable connecting Birkenhead Substation and Lister Drive Substation in the U.K. A dynamic electrical model incorporating the varying resistance of the HTS cable was constructed. The HTS cable model was integrated into an equivalent test network, representing conditions at the target site, to analyse its behaviour and impact on conventional power system protection performance via simulation case studies. The results indicate that differential protection operates reliably, while distance protection is impacted by the varying resistance. However, the proposed HTS cable design at the specified location presents a relatively small change in HTS cable resistance. The impact on distance protection was therefore minimal and can be addressed by considering HTS properties when determining distance protection settings. The study was conducted by considering manufacturer-supplied HTS parameters, network parameters reflective of an actual location in the U.K. grid, and protection requirements specified in the U.K. grid code. The study provides valuable insights into practicality and protection strategies for reliable HTS cable operation in a real-world transmission network. The findings can inform future HTS cable designs and installations globally, as well as provide a framework for further research in this area.
30 June 2009 in IEEE Transactions on Applied Superconductivity
Recent progresses in Bi2212 wires have proved its suitability for round wire developments and high field magnet development. High energy storage magnets can be foreseen leading to cable developments. In order to prepare such work CEA Saclay has developed in collaboration with the Nexans company a Bi 2212 wire having 18 sub-elements. The round wire has been twisted to study losses and twisting degradation. The results are presented here and compared to losses measurements made on already existing ribbons.