Alina Zahrytsenko

Alina Zahrytsenko

Auto-generated profile, based on publicly available information

Alina Zahrytsenko

Faculty of Water Management Engineering and Ecology, Dnipro University of Technology, Dnipro, Ukraine

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 June 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Oleg BazalukOleg Bazaluk
Oleg Bazaluk
ISIvan Sadovenko
Ivan Sadovenko
AZAlina Zahrytsenko
Alina Zahrytsenko
Pavlo SaikPavlo Saik
Pavlo Saik
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
Roman DychkovskyiRoman Dychkovskyi
Roman Dychkovskyi
The objective is to analyze the dynamics of the underground water of a mine field based on the study of the geofiltration process of the rock mass disturbed by mining to achieve safe extraction operations as well as subsurface territories at the stage of the mining enterprise closure. Numerical modeling, based on a finite difference method under the conditions of multifactority and definite uncertainty of processes of transformation of technogenic environment of a mine field, helps solve a problem concerning underground water dynamics forecasting. A hydrodynamic model of the M.I. Stashkov mine was developed while solving option series of epignosis problems in terms of the chronology of mine field stoping. The abovementioned made it possible to identify regularities of the history of filtration, the capacity parameters of rock mass and the expansion of areas of heightened hydraulic conductivity as well as to evaluate qualitatively the water balance components of a carbonic watered formation and an overlying one. The stage of mining closure helped obtain the forecasting hydrodynamic solutions. The efficiency of measures, concerning reduction of water ingress into mine workings and the mitigation of surface ecological effects of mine flooding was evaluated quantitatively. It was determined that implementation of the water control procedures makes it possible to perform a 10–38% decrease in water ingress. In this context, they may be applied both independently and simultaneously. In terms of mine closure and flooding, a period of complete underground water recovery takes three years; in the process, surface zones of potential waterlogging and swamping are developed within the floodplain of Samara River, located at the territory of Western Donbas (Ukraine). The scientific novelty is to define regularities of hydraulic conductivity transformation of the rock mass of a mine field starting from the mine working roof fall, up to its compaction during the mine operation period. To do that, nonstationary identification problems were solved, using numerical modeling. The abovementioned makes it possible to improve the reliability of hydrodynamic prognoses and develop technological schemes to control water at the state of the mine closure.

2 January 2024 in International Journal of Environmental Studies
Verified
Journal Article
Closed access
HHHennadii Hapich
Hennadii Hapich
AZAlina Zahrytsenko
Alina Zahrytsenko
С Андрей Судаков
Андрей Судаков
APArtem Pavlychenko
Artem Pavlychenko
SYSergiy Yurchenko
Sergiy Yurchenko
ICIryna Chushkina
Iryna Chushkina

1 January 2020 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
ISIvan Sadovenko
Ivan Sadovenko
OUOleg Ulytsky
Oleg Ulytsky
АZАlina Zahrytsenko
Аlina Zahrytsenko
KBKateryna Boiko
Kateryna Boiko

21 April 2016 in Mining of Mineral Deposits
Verified
Journal Article
Open access
NUNational Mining University
National Mining University
ISI Sadovenko
I Sadovenko
AZA Zagrytsenko
A Zagrytsenko
OPO Podvigina
O Podvigina
NDN Dereviagina
N Dereviagina

9 November 2023 in Таврійський науковий вісник. Серія: Технічні науки
Verified
Journal Article
Open access
PDF file
ВТВ. І. Тимощук
В. І. Тимощук
АЗА. М. Загриценко
А. М. Загриценко
ЄШЄ. А. Шерстюк
Є. А. Шерстюк
ІЧІ. В. Чушкіна
І. В. Чушкіна
НДН. І. Деревягіна
Н. І. Деревягіна
Дослідження виконані в зв’язку з оцінкою умов проектованого будівництва хвостового господарства Іршанського ГЗК та його впливу на гідродинамічний і гідрогеохімічний режими водоносних горизонтів на прилеглій території. Об’єкт досліджень – геофільтраційні та геоміграційні процеси в ґрунтовому масиві та огороджувальних спорудах на ділянці проектованого будівництва хвостосховища Іршанського ГЗК. Мета роботи – прогнозна оцінка змін гідродинамічного і гідрогеохімічного режимів ділянки будівництва хвостосховища в умовах його експлуатації. В роботі виконано аналіз і узагальнення даних про геолого-гідрогеологічні та геолого-технічні умови досліджуваної території та ділянки хвостосховища Іршанського ГЗК, розроблено чисельні геофільтраційну та геоміграційну моделі території з використанням програмного забезпечення Modflow. Виконано прогнозну оцінку змін гідродинамічного та гідрогеохімічного режимів на ділянці огороджувальних споруд хвостосховища в умовах його експлуатації. Прогнозна оцінка змін гідродинамічного режиму в умовах проектованого будівництва та подальшої експлуатації хвостосховища із заповненням його до відмітки 190,0 м при висоті огороджувальних дамб 10,5 м свідчить про очікуваний суттєвий, до 2,0 м і більше, підйом рівнів підземних вод безпосередньо навколо хвостосховища, і, як наслідок, підтоплення і затоплення прилеглих до хвостосховища територій на відстані від 500 до 1000 м. Очікувані зміни в гідрогеохімічному стані прилеглої території характеризуються розвитком ореолів підземних вод з підвищеними мінералізацією і вмістом сульфат-іону 2− SO4 k x y k h x xx    ∂ ∂ +      ∂ ∂ ∂ ∂ ( )    ∂ ∂ = ∂ ∂ ij i k D t x C θ θ , з просуванням їх контурів в напрямку річкової мережі переважно в межах тріщинуватої зони кристалічних порід. При цьому сукупний вміст розчинених речовин і сульфат-іону на контурі річок Добринка, Тростяниця та правого притоку річки Ріхта в абсолютному вираженні не перевищують значень 500,0 і 300,0 мг/л відповідно.