A. K. Adamenkov

A. K. Adamenkov

Auto-generated profile, based on publicly available information

A. K. Adamenkov

Rostov Nuclear Power Plant

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 September 2021 in Global Nuclear Safety
Verified
Journal Article
Closed access
AAA. K. Adamenkov
A. K. Adamenkov
IVI. N. Veselova
I. N. Veselova
As part of the experimental assessment of the stress-strain state of the NPP pipeline elements using devices based on the magnetic anisotropic method, changes in the wall thickness of the local section of the pipeline sample and the difference in the main mechanical stresses are obtained and evaluated. The analysis of changes in the data characterizing the stress-strain state, such as: the main mechanical stresses, the first partial derivative of the main mechanical stresses with respect to the annular generator of the sample, the modulus of the gradient of the main mechanical stresses, indicates the presence of three zones characterizing different of the studied area of the full-scale sample of the pipeline during the experiment as the local zone is thinned.

11 February 2026 in Global Nuclear Safety
Verified
Journal Article
Closed access
AAA. K. Adamenkov
A. K. Adamenkov
IVI. N. Veselova
I. N. Veselova
VSV. Y. Shpitser
V. Y. Shpitser
This article presents information on assessment of erosion and corrosion deterioration development of pipeline components using the magnetic anisotropy measurement method. The purpose of the research is fixing of locally stressed areas which are typical for local wall thinning in zones with probable erosion and corrosion deterioration and determination of magnetic anisotropy parameters as well as formation of measurement results database.

1 December 2020 in Global Nuclear Safety
Verified
Journal Article
Closed access
AAA. K. Adamenkov
A. K. Adamenkov
IVI. N. Veselova
I. N. Veselova
As part of the experimental assessment of the stress-strain state of pipeline elements at the NPP using devices based on the magnetoanisotropic method, the criteria for the parameters of the main mechanical stress difference characterizing the increased probability of erosion and corrosion wear were obtained. It is determined that the high level of the main mechanical stress difference values in combination with the results of processing measurements on the parameters of the first derivative and the gradient of the main mechanical stress difference, depending on the scanning step in the grid nodes, are additional criteria for detecting a potentially dangerous area of erosion and corrosion wear.

1 October 2026 in Global Nuclear Safety
Verified
Journal Article
Open access
PDF file
AAA. K. Adamenkov
A. K. Adamenkov
IVI. V. Veselova
I. V. Veselova
ADA. E. Dembitsky
A. E. Dembitsky
ААА. К. Адаменков
А. К. Адаменков
ИВИ. Н. Веселова
И. Н. Веселова
АДА. Е. Дембицкий
А. Е. Дембицкий
The article discusses the stages of development and implementation of a process control system at nuclear power plants (NPPs) based on Model Predictive Control (MPC) predictive analytics models. The authors propose a comprehensive approach that integrates Industrial Internet of Things (IIoT) technologies, digital twins, predictive diagnostics, and intelligent operator support within the framework of the digital transformation of the nuclear industry. Particular attention is paid to the sequential execution of stages: equipping equipment with smart sensors, developing digital twins, implementing predictive analytics based on machine learning methods (specifically, MSET), and integrating MPC models to optimize real-time control. Case studies of applying this approach to specific power block systems (essential service water supply, reactor coolant pump oil supply, and power output) are considered. The final stage presents the development of an Operator Information Support System (OISS) that provides forecast visualization, decision explanation, and cognitive load reduction. In conclusion, it is emphasized that the implementation of MPC models contributes to increasing the safety, reliability, and economic efficiency of NPPs. The application of end-to-end predictive models based on machine learning methods allows the nuclear industry to systematically transition from reactive maintenance strategies to proactive management. Practical operational references of similar information support systems at the Novovoronezh NPP-2 power units clearly confirm the viability of this approach, demonstrating a reduction in the number of false trips of technological protections by more than twenty percent. Thus, linking predictive analytics with the MPC loop establishes a reliable mathematical foundation for verifying the design lifetime and justifying the safety of NPP elements in the long term.

1 March 2021 in Global Nuclear Safety
Verified
Journal Article
Closed access
AAA. K. Adamenkov
A. K. Adamenkov
MMM. I. Malakhov
M. I. Malakhov
VOV. D. Ozhereliev
V. D. Ozhereliev
VSVitaly Surin
Vitaly Surin
The electrophysical system of non-destructive testing is tested on the NPP operating process equipment. The welded joints of the process pipeline located in the turbine hall are selected as the object of control. The results of the study confirm that the base metal of the welded joints is in a plastically deformed state. A comparison of the results of testing welded joints by scanning contact potentiometry and magnetic anisotropy methods is presented.

21 December 2023 in Global Nuclear Safety
Verified
Journal Article
Open access
PDF file
AAA. K. Adamenkov
A. K. Adamenkov
IVI. N. Veselova
I. N. Veselova
The paper presents the results of further research in the field of assessing the development of erosion and corrosion wear (ECW) of pipeline elements using a magnetic and anisotropic method to monitor the stress-strain state of ferromagnetic material. The conducted studies show that the recorded parameters of the magnetic anisotropic method, such as the principal mechanical stress difference, make it possible to unambiguously establish a quantitative correspondence to the level of stresses operating in the controlled zone. The possibility of determining the correspondence of the level of effective stresses to the value of the principal mechanical stress difference recorded by the StressVision scanner during the inspection of the structure is proven. The paper shows that in order to organize monitoring of the development of ECW using the magnetic anisotropic method it is necessary to monitor periodically changes in the principal mechanical stress difference and its dispersion and when fixing cut-off points, prescribe additional examinations with other more labor-intensive methods. The possibility of organizing monitoring of ECW equipment development based on the use of a pipeline resource forecasting mechanism in accordance with the provisions of regulatory documentation is confirmed.