M. Ichikawa

M. Ichikawa

Auto-generated profile, based on publicly available information

M. Ichikawa

Fusion Energy Directorate, National Institutes for Quantum Science and Technology , Naka, Ibaraki 311-0193, Japan

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 December 2017 in IEEE Transactions on Plasma Science
Verified
Journal Article
Closed access
NPNicola Pilan
Nicola Pilan
AKA. Kojima
A. Kojima
RNR. Nishikiori
R. Nishikiori
MIM. Ichikawa
M. Ichikawa
JHJ. Hiratsuka
J. Hiratsuka
MKM. Kashiwagi
M. Kashiwagi
In the framework of the program for the construction of 1 MeV-16 MW negative neutral beam injector (NNBI) for ITER, a research and development activity on voltage holding in vacuum has been initiated since 2009, aimed at supporting the design, construction, and development of the NNBI accelerator. For this purpose, the voltage holding prediction model (VHPM) previously developed has been updated. In the VHPM, the effect of the anodic electric field and the cathodic electric field on the probability of breakdown is evaluated by means of two exponents: α and y. On the basis of the experimental results from different test stands and of detailed 3-D numerical simulation of the corresponding electric-field configurations, the predictions of the VHPM numerical code have been benchmarked. New exponents, α and y, have been proposed to obtain a more precise location of the weak point of the system and a better prediction of the maximum withstanding dc voltage in high vacuum.

1 May 2022 in Review of Scientific Instruments
Verified
Journal Article
Closed access
MKM. Kashiwagi
M. Kashiwagi
MKM. Kisaki
M. Kisaki
GSG. Q. Saquilayan
G. Q. Saquilayan
AKA. Kojima
A. Kojima
JHJ. Hiratsuka
J. Hiratsuka
HTH. Tobari
H. Tobari
A beam optics study using the ITER-relevant high intense negative ion beams, such as 1 MeV, 200 A/m2, has been performed experimentally and analytically using a multi-aperture and five-stage accelerator. Initially, multi-beamlets generated from this accelerator were deflected in various directions due to the magnetic field and space charge repulsion between beams and showed various divergences. These had limited the pulse length and the beam energy. Compensation methods of the beamlet deflections have worked effectively and contributed to achieving the ITER requirement, the divergence angle of <7 mrad, and the deflection angle of <1 mrad for 1 MeV beam. The beam pulse has been gradually extended from 1 to 100 s and is now going to a longer pulse based on these results. One of the remaining issues is to understand and suppress peripheral components of the beam, namely, the halo, and to reduce the local heat loads observed around the aperture edge. This halo component has been successfully distinguished from the beam core by using a newly developed beam emittance measurement system for high intense beams. By combining this measured beam emittance and the beam simulation, it was clarified for the first time that the halo components are generated in an area of 1 mm width from the aperture edge.

29 April 2022 in IEEE Transactions on Plasma Science
Verified
Journal Article
Closed access
GCGiuseppe Chitarin
Giuseppe Chitarin
AKA. Kojima
A. Kojima
MBM. Boldrin
M. Boldrin
ALA. Luchetta
A. Luchetta
DMD. Marcuzzi
D. Marcuzzi
MKM. Kashiwagi
M. Kashiwagi
The electrical insulation of the Megavolt ITER Injector and Concept Advancement (MITICA) beam source (BS) at 1 MV in vacuum is a challenging issue, which could not be fully addressed so far on the basis of experimental results and of theoretical models available in literature. A specific high-voltage (HV) test campaign is being prepared to validate and optimize the voltage holding capability of the BS insulation under realistic conditions, using full-size mockup electrodes reproducing in detail the geometry of the BS and accelerator. The proposed test strategy will address both the single-gap and the multistage insulation, so as to obtain a verification of voltage holding at 1 MV before the installation of the real components. This approach is intended to reduce the risk related to the HV insulation at 1 MV and, if necessary, to allow the development of effective corrections. In this article, the test motivations and requirements are defined, and the electrode implementation and diagnostic setup are described. Finally, the test configurations and the experimental procedure are discussed.