The continuously increasing renewable distributed generation (DG) penetration rate significantly reduces environmental pollution and power generation cost and satisfies society’s rapid growth in electricity demand. Nevertheless, high penetration of renewable DGs, such as wind power and photovoltaics (PV), might deteriorate the system’s efficiency and reliability due to its intermittent and stochastic natures. Introducing battery energy storage systems (BESSs) to the distribution system provides a practical method to compensate for the above deficiency since it can deliver and absorb power when needed. Hence, it is important to determine the optimal allocation of BESS to achieve maximum assistance in the grid. This study proposes an optimal BESS allocation methodology to improve reliability and economics in unbalanced distribution systems. The optimal BESS allocation problem is solved by simultaneously minimizing the cost of energy interruption, expected energy not supplied, power loss, line loading, voltage deviation, and BESS cost. The proposed technique is implemented and analyzed on a high renewable DG penetrated unbalanced IEEE-33 bus network using DIgSILENT PowerFactory software (version 2020 SP2A). An enhanced grey wolf optimization (EGWO) algorithm is developed to optimize BESS location and size according to the selected objective function. The simulation results show that the proposed optimal BESS optimization technique significantly improves the economics and reliability in unbalanced distribution systems and the EGWO outperforms the gray wolf optimization (GWO) and particle swarm optimization (PSO) algorithms.
Man in his lifetime, uses energy in one form or the other. Energy demand continues to grow, year after year. In the present scenario power becomes major need for human life. But the extensive usage of energy has resulted in an energy crisis, and there is a need to develop methods of optimal utilization, which will not only ease the crisis but also preserve the environment from the negative impacts of global climate change. Energy conservation is the cheapest new source of energy. It is an attractive technology for optimal use of available sources. This research shows the possibility of tapping the wasted energy in the road speed breaker. The wasted energy can be converted to the electrical energy by roller mechanism through several energy conversion processes. In this research, the obtained electrical energy is in KW range which is sufficient to lighten the street lights and traffic signal. As the number of vehicle is increasing day by day, the designed system will be effective to solve the power crisis of Bangladesh to some extent.
Modern era is looking at the sustainable energy for a permanent solution to the future power demand all over the world whereas the countries of the third world like Bangladesh is still failure to meet the present basic power demand. St. Martin Island is one of those places which are still out of national grid in Bangladesh. It is the most beautiful tourist island in the Bay of Bengal, which is in the most southern part and 17 km far away from the main land of Bangladesh. Grid connected electric system is quite impossible even in future because of costs and geographic location. Present electricity demand is partially fulfilled by stand-alone diesel generators only for four hours per day with large amount of CO2 emission. This paper is documented to give a solution of the power crisis of St. Martin Island with optimizing hybrid power generation scheme concentrating on sustainable energy. Using HOMER analysis, an optimum configuration is established among a set of systems to supply electricity to about 1400 families, 150 shops, 100 hotels and various organizations. The load calculation for the whole island has an outcome of a demand of energy about 4000kWh per day with a peak load of 504kW. This system incorporates a combination of 600kW decentralized Solar PV, 3 wind turbines of 1.8kW each, 2000 batteries of 800Ah each, 300kW biogas generator and 15kW diesel generator to fulfill the whole power demand of St. Martin Island. This configuration gives lowest cost of energy (COE) as BDT 15.04/ kWh (US$ 0.2/kWh) with a renewable fraction of 99.3%. It reduces CO2 emission significantly. This hybrid system may be an effective solution to the present electricity demand of St. Martin Island without hampering the environment. Besides, it may be an ideal example of a renewable hub because of its high renewable fraction.
1 March 2016 in Journal of Renewable and Sustainable Energy
Growing demand of energy consumption, subsequent increase in energy generation costs, and increased greenhouse gas (GHG) emissions, as well as global warming from the conventional energy sources, encourages interest worldwide to bring a higher percentage of renewable energy sources such as biogas into the energy mix to build a climate friendly environment for the future. Moreover, due to high investment and maintenance costs, governments are not providing enough support for grid extension and delivering electricity to remote locations or rural areas, in particular, in under-developing countries like Bangladesh. Therefore, this paper presents an Energy Neutral Home System (ENHS) that can meet all its energy requirements from low-cost, locally available, nonpolluting biogas generated from animal waste, in particular, chicken and cow manure. The proposed ENHS has been developed for rural community, typically an area of 200 families, and will not only provide cooking gas and sustainable and affordable power supply to the community with low emissions, but will also facilitate high quality fertilizer for agricultural purposes. In-depth analysis clearly demonstrates that the proposed ENHS not only offers electricity and cooking gas to the community with the lowest costs, but also reduces the energy crisis and GHG emissions and can play an active role in developing socio-economic infrastructure of rural communities in Bangladesh in many ways.