1 August 2019 in Journal of Performance of Constructed Facilities
Relatively few studies have been conducted to examine the effects of static pile driving on existing tunnels, and there is a lack of guidance and case studies that can be used as references. This article presents a case study of the tunnel of the Wuxi Metro Line 2 in China that was performed to investigate the mechanism by which static pile driving affects an existing metro tunnel structure. The study provides a theoretical basis for the design of construction schemes for static-driven piles. The effects of pile driving–induced soil compaction and excess pore-water pressure (EPWP) are studied through numerical calculations and are then combined using the superposition principle. In addition, the numerical results are compared with field measured data. The following results are obtained. First, static pile driving results in horizontal compression and vertical extension of the existing tunnel. The horizontal convergence of the tunnel segment near the center of the pile group is . The opening of the circumferential joints is 1.15 mm, which leads to the risk of water leaks. Second, the EPWP-induced horizontal and vertical extension of the tunnel segment are approximately 50% and 33%, respectively, of the deformation caused by soil compaction before the dissipation of the EPWP and decrease to 25% and 20%, respectively, after the dissipation of the EPWP. Third, the combined effects of static pile driving–induced soil compaction and EPWP calculated based on the superposition principle are consistent with the field observations. This study provides a new procedure for static pile-driving simulations, reveals the influence of static pile driving on the deformation of an existing tunnel, and can be used to guide the design and formulation of construction schemes for static piles.
18 December 2020 in Geofluids
Cracks and other diseases may occur in the long-term operation of highway tunnels and reduce the structural load-carrying capacity. Strengthening using carbon fiber reinforced polymer (CFRP) sheets and other materials could extend the service time of the tunnels. However, the process of strengthening tunnels is remarkably different from the process of strengthening aboveground structures because of the secondary load. In order to understand the development of stress and deformation of strengthened tunnels under secondary load, a 1 : 10 scaled model was tested to simulate the tunnel strengthened with CFRP under different damage states. The test results show that CFRP strengthening improved the stiffness of the structure and inhibited the propagation of the existing cracks. The peeling of the CFRP sheets made the strengthened structure quickly lose its load-carrying capacity, causing the instability of the structure. The failure loads of the structures strengthened at different damage states were essentially the same, with an average value of 184% of the original failure load. Nevertheless, the early strengthening helped control the structural deformation. The test results also demonstrate that the bonding strength between the CFRP and the lining is essential for strengthening effectiveness. This study provides a theoretical basis for similar engineering reinforcement designs.
1 January 2020 in Advances in Civil Engineering
Based on the structural damage of the shield tunnel caused by a soil mound on the ground surface in a section of subway in Tianjin, China, the deformation and the cracking process of the segment under soil mound loading were simulated. The variations of segment, bolt, and rebar stresses with the height of the mound were analyzed. The results show that, for the stagger‐jointed assembled shield tunnel that crosses the marine sedimentary silt with a burial depth of 10 m, as the mound loading increases, the damage is concentrated in the vault and hance. When the mound loading is 16.0 kPa, the segment is damaged; the crack depth and bolt axial force of the vault increase rapidly when the mound loading reaches 38.6 kPa. The analysis results are basically consistent with monitoring data. Based on the above analysis, the control standard of mound loading should be 38.6 kPa. The results of this study can provide data reference for control and structural protection of soil mound loading for similar subway tunnels.