Developing automated code compliance checking systems is becoming increasingly complex—to the extent of challenging the implementation of these systems. This paper addresses the need to develop an automated system that prioritises user accessibility. Accordingly, the study aims to develop a system through a semi-automated rule translation process and the utilisation of BIM models in native file format. A total of 256 fire safety clauses in Malaysian regulations were translated through logic-based approaches (classification technique, decomposition through semantic mark-up method, and interview method), which further assisted in identifying the necessary BIM properties. A visual programming language was then utilised to demonstrate the proof-of-concept prototype. The classification technique and semantic mark-up method were established and structured in this study by developing a framework and flowchart to provide specific guidelines for formalizing the clauses. The semi-automated translation process encouraged the participation of relevant regulatory experts and provided more user accessibility compared to existing studies. This study also offered more practicality for designers to employ the system by utilizing native BIM model data representation. High mean scores ranging from 4.09 to 4.96 were obtained for the validation process, which affirmed the feasibility of the BIM-based Automated System for Malaysian Code Compliance Checking (BIMSMACC) to assist designers.
Building information modelling (BIM) has been considered an effective and efficient tool among stakeholders of the construction sector as it delivers prominent results. Hence, this work aimed to determine the intangible benefits of BIM in construction projects. Various statistical analyses were performed to identify the most critical intangible benefits of BIM required for justification. To rank the intangible benefits of BIM, the relative importance index was adopted. Then, the rotated component matrix was conducted to correlate each intangible benefit to its estimated components. In the last phase of the research, interviews were conducted to validate and confirm the critical intangible benefits. Five critical intangible benefits were identified: better understanding of design, better information received and given, improved communication through visualization, reduce design error and improved accuracy of drawings. By knowing these five critical benefits, clients should prioritise these benefits in their justification of BIM implementation.