Based on the deep foundation pit engineering of a subway station working well in Jinan, this paper uses the finite element software MIDAS GTS/NX to simulate the various construction stages of the deep foundation pit excavation. Through the analysis of field monitoring data, it is concluded that with the increase of foundation pit excavation depth, the horizontal displacement of the underground diaphragm wall and the surrounding surface settlement displacement are increasing. The maximum horizontal displacement of a deep layer is 12.8 mm during cushion construction; the surface subsidence displacement reaches the maximum at the edge distance of about 4 m away from the foundation pit. The simulation results are compared with the actual monitoring data, and the deformation law is basically consistent with the field monitoring. This paper discusses the influence of diaphragm wall thickness on foundation pit deformation: when the wall thickness is less than 1.0 m, the deformation of the diaphragm wall changes greatly, which has a great influence on the safety of the foundation pit.
Multi-functional grid connected inverter (MFGCI) has the ability to solve various power quality problems in the distribution network while fulfilling the power tracking task simultaneously, but this ability is often limited by its compensation capacity that can be used for power quality management. Based on the control structure of MFGCI, this paper provides the current compensation order and grid connection tracking current order without PLL. A multi-objective collaborative optimization method based on variable weight hybrid decision evaluation is proposed to better adapt to the fluctuations in power quality indicators caused by uncertainty in new energy and nonlinear load integration. A multi-objective function is constructed to achieve the best power quality compensation effect and the minimum required compensation capacity, an optimization algorithm based on the multi-objective artificial hummingbird algorithm (MOAHA) update mechanism is employed to solve the optimal capacity allocation coefficient for compensating various power quality problems. The correctness and effectiveness of the proposed method are verified through simulations in various scenarios.