1 January 2010 in Journal of Construction Engineering and Management
Academic research in applied disciplines such as construction engineering and management (CEM) has the dual mission of simultaneously contributing to the solution of practical problems and creating theoretical and conceptual knowledge. To do so, appropriate research approaches are needed. However, extant literature in the field has paid little attention to this issue and research methods used have been almost entirely either quantitative surveys or case studies. In this paper, action research (AR) is proposed as an answer to this knowledge gap. AR aims at building and testing theory within the context of solving an immediate practical problem in a real setting. The paper describes the underlying philosophy and application procedure of AR and highlights its strengths and weaknesses. Then, the applicability of the method to CEM is illustrated through a case study of improving access to information to support planning and decision making in a construction owner organization through designing and implementing...
10 July 2010 in Automation in Construction
1 July 2009 in Journal of Construction Engineering and Management
Highway construction often causes an additional road user cost (RUC) to motorists due to traffic flow interruption and congestion in work zones. Consequently, facility owners, such as the Florida Department of Transportation (FDOT), are often interested in using alternative contracting methods such as A+B contracting to expedite construction. Although many of these contracting methods rely on the RUC to determine incentives or disincentives, no standard method for RUC calculation is available to FDOT district engineers. In addition, existing methods are neither practical nor user-friendly for determining incentives or disincentives. This study intends to develop a RUC calculation procedure for the FDOT that focuses on using data that are easily accessible to FDOT district engineers, such as drawings and maintenance of traffic plans. The procedure is developed based on traffic analysis methods published in the Highway Capacity Manual, previous studies on user benefit analysis and work zones, and empirical ...
1 September 1997 in Construction Management and Economics
The factor-element impact model is a normative, theory-based contingency model. It is concerned with identifying the factors that affect the success of total quality management (TQM) initiatives in construction projects. This model is based upon organizational theory, utilizing an interactionist view of organizational design. If TQM is to succeed, construction project teams should be formed with its implementation in mind. The most important factors influencing the success of particular project team configurations are project characteristics. Organizational characteristics of participating firms are also significant. The contingency model developed in this paper involves an iterative approach of designing construction project teams to minimize negative effects on TQM. Guidelines are offered on how to apply the model, and two scenarios are presented to illustrate its application.
1 October 2003 in Leadership and Management in Engineering
This paper presents a case study of the construction of the Jamuna Bridge, the 11th longest bridge in the world. The bridge crosses the Jamuna River (the main channel of the Brahmaputra River in Bangladesh) from Bhuapur on the east bank to Sirajganj on the west, linking the eastern and northwestern parts of Bangladesh. In addition to two carriageways with two lanes each for road transport, the bridge also carries a dual-gauge (meter-gauge and broad-gauge) rail track, a 750-mm-diameter natural gas pipeline, and a 230-kV electrical transmission line across the river. Built at a cost of about $950 million, the Jamuna Bridge is one of the most expensive infrastructure facilities in the Third World. This project posed various challenges to the government of Bangladesh and the international agencies involved. Technical, financial, social, and political challenges had to be overcome, yet despite the complexity and inherent difficulty of this megaproject it is considered a success story. The factors that contributed to the successful construction of the Jamuna Bridge in Bangladesh are chronicled in this paper.