27 December 2023 in IEEE Transactions on Applied Superconductivity
The superconducting tokamak fusion test device, JT-60SA, was constructed as the Satellite Tokamak project in the Broader Approach Program between Japan and EU. During the JT-60SA integrated commissioning tests of the Nb-Ti equilibrium magnetic field coil EF1 high voltage (∼5 kV) test, the EF1 power supply current surged suddenly and was stopped by the overcurrent interlock of the power supply. At the same time, the vacuum in the cryostat deteriorated, and the pressure in the magnet cooling loops increased. After the system warmed up, visual inspection revealed that discharges occurred between ground and both positive and negative terminal joints of EF1. Several holes, melted by the electrical short and identified as the source of the helium leak into the cryostat, were found in the cylindrical metal part of the joint. The data recorded at the time of the event were analyzed with a conclusion that the discharge first occurred between the positive terminal joint and its support bracket at ground potential and immediately afterward between the neighboring negative terminal joint and its support bracket. These two arcs created a short-circuited loop through which the coil discharged for about 1.4 s. The energy during the short circuit is estimated to be about 60 kJ.
9 November 2017 in IEEE Transactions on Applied Superconductivity
The JT-60SA experimental device will be the world's largest superconducting tokamak when it is assembled in 2019 in Naka, Japan (R = 3 m, a = 1.2 m). It is being constructed jointly by institutions in the EU and Japan under the Broader Approach agreement. Manufacturing of the six NbTi equilibrium field (EF) coils, which have a diameter of up to 12 m, has been completed. So far, 13 of the 18 NbTi toroidal field (TF) coils, each 7-m high and 4.5-m wide, have also been manufactured and tested at 4 K in a dedicated test facility in France. The first three of four Nb3Sn central solenoid (CS) modules have been completed, as have all of the copper in-vessel error field correction coils. Installation of the TF magnet, around the previously welded 340° tokamak vacuum vessel and its thermal shield, started at the end of 2016 and is currently underway. The TF magnet will in turn support the EF and CS coils.
4 February 2021 in IEEE Transactions on Applied Superconductivity
The construction of a magnet system for the tokamak device of JT-60 super-advanced (JT-60SA) was completed in March 2020. The manufacturing of CS had been finished in March 2019. The circularity of 4.0 mm is a requirement for CS manufacturing from the point of view of plasma control. The high accurate manufacturing method and jigs had been developed, and the circularity of CS achieves 1.44 mm, which meets the requirement of 4.0 mm. The clearance between the CS and the TF coils is very small, only 14 mm in design. In case the CS touches the TF coils and is subjected to load during operation, the CS can be damaged. Thus the surface dimensions of the CS and the TF coils have been measured before the installation of CS to confirm if the clearance is sufficient large to avoid the CS crashing into the TF coils. The CS was successfully installed to the tokamak center without any damages in December 2019 as the final step of the magnet assembly of JT-60SA. In this paper, the manufacturing results and the installation of the CS are described.
15 April 2019 in IEEE Transactions on Applied Superconductivity
The final design of coil terminal boxes (CTBs) and superconducting feeders for the superconducting magnets of JT-60 super advanced (JT-60SA), which is the tokamak device being built in Japan, have been fixed. Because of the limited space in the torus building, five CTBs are distributed around the main cryostat. The CTBs have long horizontal ducts to place the high temperature superconductor current leads in a low magnetic field area. It is required for feeders that both flexibility for deformation of 30 mm, and stiffness for acceleration due to an earthquake of 3.92 m/s 2 (+self-weight of 9.8 m/s 2 ) vertically and 5.88 m/s 2 horizontally have to be guaranteed. The design of feeder shape and support structure have been optimized and confirmed by finite-element analysis to satisfy the above requirements. As for the feeder joint, compact tools are required because of the small working space in the horizontal duct of CTBs. Joint resistances were measured to verify the connection tools and procedure. Test results show that the joint resistance meets the requirement of 5 nΩ. In this paper, the final design of CTBs and in-cryostat current feeders for JT-60SA are described and the results of validation tests and analysis are also reported.
1 January 2004 in Circulation Journal
Japan's largest platform for academic e-journals: J-STAGE is a full text database for reviewed academic papers published by Japanese societies
1 February 2004 in Fusion Engineering and Design