Gulzada Mashatayeva

Gulzada Mashatayeva

Auto-generated profile, based on publicly available information

Gulzada Mashatayeva


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 February 2024 in Neft i Gaz
Verified
Journal Article
Closed access
BAB.S. Akhymbayeva
B.S. Akhymbayeva
SUSatbayev University
Satbayev University
SKS.Z. Kabdulov
S.Z. Kabdulov
BMB.K. Mauletbekova
B.K. Mauletbekova
TKT.A. Kuandykov
T.A. Kuandykov
KUKazakh-British Technical University
Kazakh-British Technical University
This article is devoted to the study of the process of crack formation, which are actively manifested during rotational impact drilling. The studies conducted during the writing of the article show that simultaneously with the destruction of the bottom of the well, another process occurs – the formation of many cracks in the angular (peripheral) zones of the bottom and on the walls of the well, going to a depth of 5-10 mm. These cracks remain in the form of a dense network in the walls of wells and in the core (during its selection), and the depth of the cracks increases with increasing impact energy. An attempt was made to explain the mechanism of cracking in the core during impact-rotational drilling from the standpoint of the theory of off-center impact. However, the study of cracking occurred when drilling wells on blocks of rocks. With the rotary-impact method of drilling deep horizontal wells, the types and distribution of loads in the near-well array will be different. This article presents technologies that increase the volume of production in depleted fields. During the calculations, the dependences of the impact force of the transmitted seal (rock) depending on its compliance are given. In addition, a graph of the dependence of changes in the impact force of the striker on the anvil on the impact time with different malleability of the anvil is constructed. The process of forming a horizontal well, which is drilled with a continuous face in a shock-rotational way using hydraulic impact machines, is considered. To study the process model, the results of solving the problem of stress distribution around the trunk array of a vertical well were considered.

25 December 2020 in Kompleksnoe Ispolzovanie Mineralnogo Syra = Complex Use of Mineral Resources
Verified
Journal Article
Closed access
NBN.S. Buktukov
N.S. Buktukov
EGE.S. Gumennikov
E.S. Gumennikov
AАA.A. Аsanov
A.A. Аsanov
GMG.A. Mashataeva
G.A. Mashataeva
The authors of this paper describe the face transport system that ensures the stripping of ore bodies using the underground development method with inclined narrow workings driven downward, including in conditions of increased water cut. The face transport system will allow the preparation of a new 500-thousand-ton mine with minimum general construction and mining construction works as well. The article contains an engineering study of the transition of the road heading to blastless continuous-flow methods of rock development using hydraulic impulse or mechanical shock machines, which are under development. For deep and ultra-deep developments starting from 250-300 m and deeper, a new technical solution is given for the construction of a downhole mine airlift with the lowest capital and operating costs and sufficiently high reliability and productivity. New technical solutions will ensure the radical transition of the technological concept of mining production from the drilling-and-blasting cyclic to blastless continuous-flow one.

26 August 2025 in International Journal of Innovative Research and Scientific Studies
Verified
Journal Article
Open access
BKBakytzhan Kaliyev
Bakytzhan Kaliyev
BMBeibit Myrzakhmetov
Beibit Myrzakhmetov
BABibinur Akhymbayeva
Bibinur Akhymbayeva
GMGulzada Mashatayeva
Gulzada Mashatayeva
BMBulbul Mauletbekova
Bulbul Mauletbekova
This article explores an innovative approach to the disposal of used water-based spent drilling fluids (SDF) utilized in the drilling of production wells at uranium deposits, with a case study based on the operations of SD «Inkai». A technological solution is proposed, centered on the use of a hydrodynamic disperser that enables efficient phase separation of drilling fluids, reduction of residual moisture in solid fractions, and the potential for reuse of the liquid phase. The geological and hydrogeological conditions of the deposit are examined in detail, along with the composition and properties of the drilling fluids, challenges associated with their accumulation and disposal, and the legal and regulatory framework of the Republic of Kazakhstan governing drilling waste management. The design of the proposed disperser is presented, the technological process is described, and its advantages over traditional disposal methods are substantiated. The article also analyzes the ecological, operational, and resource-saving aspects related to the implementation of the proposed technology within existing drilling systems.

30 June 2024 in Neft i Gaz
Verified
Journal Article
Closed access
SUSatbayev University
Satbayev University
BMB.A. Myrzakhmetov
B.A. Myrzakhmetov
ASA.V. Sladkowski
A.V. Sladkowski
STSILESIAN UNIVERSITY OF TECHNOLOGY
SILESIAN UNIVERSITY OF TECHNOLOGY
GMG.A. Mashatayeva
G.A. Mashatayeva
BMB.K. Mauletbekova
B.K. Mauletbekova
One of the unfavourable factors of downhole pumping equipment operation at the fields at the final stage of development is high content of mechanical impurities in the pumped fluid. Similar problems are observed in fields with friable, weakly cemented formations, the fracture products of which flow downhole, resulting in lower extraction rates, equipment damage and higher operating costs. In oil production practice various technological measures and technical means are used to reduce the negative impact of sand penetration - regulation and optimisation of pumping equipment operation mode to ensure a rational rate of fluid withdrawal, application of technical devices in the form of sand filters and sand anchors and others. However, these measures and recommendations, for the most part, work successfully in the modes of continuous operation of wells. With the growing number of oil fields at the final stage of development, the issue of sanding becomes more and more urgent, as due to low flow rate wells at such fields are often switched to the mode of periodic operation, which favours the formation of sand plugs in tubing above the pump due to sufficient time for sedimentation of mechanical impurities. This can lead to pump jamming or rod breakage during subsequent well pump start-up. The experience of using sand filters (frame, slotted and others) in the arrangement of downhole pumps has shown that it does not always effectively solve the problem of sand penetration due to clogging of their cells with mechanical impurities and increased hydraulic resistance. This negatively affects the pumping equipment operation due to the shift of characteristics into the zone of suboptimal modes with associated problems for the electric drive. This makes it necessary to carry out underground well workover with removal of deep well pumping equipment for replacement or washing of the filter in surface conditions, as due to their peculiarities in the well pump layout (the filter is located at the intake of the pumping section), washing in well conditions is not always possible. These problems require not only the creation of effective downhole devices to prevent sand ingress to the pump intake or devices to prevent sand plugs above it, but also acceptable in practice calculation methods for predicting the sedimentation time of mechanical impurities in tubing or determining the minimum required speed of upward oil flow for stable sand removal. These calculation methods would also allow to reasonably regulate the time of technological interruptions while waiting for the wells to start up in periodic operation modes or to predict the time of activation of sand control devices for discharging the sand accumulated above the pump. This is the subject of this article. As a result of calculation analysis it was established that the main factors affecting the sedimentation process of mechanical impurities in the well are the speed and mode of fluid movement, its viscosity, density and size of the impurities themselves. Moreover, the most sensitive for the calculation accuracy is to take into account the change of fluid viscosity as it moves along the tubing as a result of heat exchange and the change of dissolved gas content due to pressure drop. Although at this stage the proposed methodology does not take into account some factors that can make additional adjustments to the process of sand sedimentation, however, it allows to predict with acceptable accuracy the time of technological interruptions in the well operation to prevent the formation of sand plugs, or the rational mode of operation of pumping equipment, providing the necessary speed of upward flow in the pipe for sand removal.

15 February 2024 in Neft i Gaz
Verified
Journal Article
Closed access
BMB.A. Myrzakhmetov
B.A. Myrzakhmetov
SUSatbayev University
Satbayev University
ZNZh.B. Nurkas
Zh.B. Nurkas
GMG.A. Mashatayeva
G.A. Mashatayeva
BMB.к. Mauletbekova
B.к. Mauletbekova
GSG.S. Serali
G.S. Serali
In recent years, one of the trends in oil well production has been the continuous growth of interest in intelligent monitoring and control systems for mechanized well assets. This is attributed, on one hand, to the increasing number of oil fields worldwide reaching maturity and the development of new challenging reservoirs (in terms of viscosity, water cut, and sand production). On the other hand, it is driven by the necessity to enhance the economic efficiency of oil production, including cost reduction and minimizing losses. The emergence of «smart» oil production technologies, such as programmable drives for well pumps, also contributes significantly to addressing these issues. Their application allows for increased reliability and lifespan of pump equipment, reduced well downtime and failures, prevention of negative scenarios during oil production, and facilitates the visualization of parameters in a user-friendly manner. Despite the widespread use of digital technologies in the oil and gas industry, there is still significant potential for further digitization to expand operations for enhanced safety and productivity. This article presents the experience of creating and testing such a control station for screw pump units at an oil field.

30 October 2026 in Neft i Gaz
Verified
Journal Article
Closed access
BMB.K. Mauletbekova
B.K. Mauletbekova
BKB.Z. Kaliyev
B.Z. Kaliyev
BMB.A. Myrzakhmetov
B.A. Myrzakhmetov
GMG.A. Mashatayeva
G.A. Mashatayeva
GSG.S. Serali
G.S. Serali
The aim of this study is to develop a technology for the utilization and reuse of water-based spent drilling fluids from technological wells in the Republic of Kazakhstan using a hydrodynamic disperser, and to experimentally validate its effectiveness. The proposed technological solution enables efficient phase separation of drilling fluids, reduces the residual moisture content of the solid fraction, and allows the reuse of the liquid phase. The paper comprehensively examines the geological and hydrogeological conditions of technological wells, the composition and properties of drilling fluids, issues related to their accumulation and utilization, as well as the regulatory framework of the Republic of Kazakhstan governing drilling waste management. The design of the proposed hydrodynamic disperser and the technological process are described, and its advantages over conventional utilization methods are substantiated. In addition, the environmental, operational, and resource-efficiency aspects of implementing the proposed technology in existing drilling systems are analyzed.