Lei Yu

Lei Yu

Auto-generated profile, based on publicly available information

Lei Yu

School of Electronic and Electrical Engineering, Minnan University of Science and Technology, Quanzhou 362700, China

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
23 March 2026 in Processes
Verified
Journal Article
Open access
PDF file
LYLei Yu
Lei Yu
LALingling An
Lingling An
XLXiaomei Lin
Xiaomei Lin
Kai-Hung LuKai-Hung Lu
Kai-Hung Lu
HZHongqing Zheng
Hongqing Zheng
As modern power markets integrate more renewable generation, day-ahead energy clearing remains the central procurement step, while flexibility products are procured to ensure that the cleared energy schedule can be operated securely. This paper proposes a closed-loop framework linking the Power Exchange (PX) and the Independent System Operator (ISO) to bridge energy-market settlement and network-feasible operation. The PX performs staged day-ahead clearing with energy settled first, followed by aAutomatic generation control (AGC) and spinning reserve (SR) procured from the residual headroom of committed (energy-awarded) units. The ISO then validates the cleared schedule using an equivalent current injection (ECI)-based screening. This paper uses a single-period (single-hour) IEEE 30-bus case setting; multi-period scheduling and intertemporal constraints are not modeled. When congestion is detected, power-flow tracing identifies the main contributors and guides a minimal-change redispatch. The ISO-feasible dispatch is then sent back to the PX for re-clearing, aligning prices and welfare with an executable operating point. The resulting nonconvex clearing problems with valve-point effects and prohibited operating zones are solved by Artificial Protozoa Optimizer with Social Learning (APO–SL) and evaluated against representative metaheuristic baselines. IEEE 30-bus studies show that off-peak and average-load cases pass ISO screening directly, whereas the peak case tightens reserve headroom (SR capped at 39.08 MW) and triggers congestion. After ISO feedback and energy re-clearing, line loadings return within limits. The ISO-feasible dispatch changes the marginal accepted offer and lifts the MCP (3.73 → 4.38 $/MWh). The welfare value reported here follows the paper’s settlement-based definition (purchase total minus accepted offer cost), and it increases accordingly (113.77 → 190.17 $/h).

1 October 2018 in Medicine
Verified
Journal Article
Open access
CWChunming Wang
Chunming Wang
RLRiqiang Liu
Riqiang Liu
FHFeifei Huang
Feifei Huang
HWHaiming Wei
Haiming Wei
LYLei Yu
Lei Yu
Rationale: Malignant mixed Müllerian tumor (MMMT) of extragenital organs is rare, especially in male. To our knowledge, this is the first reported case of primary MMMT at the mediastinum in male. Patient concerns: A 54-year-old male was admitted to the hospital due to repeated stimulating dry cough for 2 years. His systemic examination was unremarkable. Laboratory workup revealed that all blood indicators were within normal limits. But subsequent computerized tomography (CT) scans of chest showed an abnormal soft tissue density in the area of its left, measuring approximately 4 cm in anterior-posterior dimension and 7 cm in maximum transverse dimension. Diagnoses and Interventions: The pathogenesis of these tumors remains controversial. The diagnosis is combined with biopsy and immunohistochemical staining. So, the patient underwent radical surgical resection and pathologic examination of the excised specimen was consistent with the diagnosis of MMMT. After surgery, he was treated by sequential chemoradiotherapy. Outcomes: The patient died from tumor recurrence 16 months later. Lessons: MMMT is a rare, highly aggressive tumor associated with interesting embryological origin, a definite diagnosis of which is only confirmed on pathological assessment. Due to its high degree of malignancy and high rate of recurrence, complete macroscopic excision of the tumor is recommended as soon as possible.

1 September 2026 in Electronics
Verified
Journal Article
Open access
PDF file
LYLei Yu
Lei Yu
YCYongjin Chen
Yongjin Chen
QXQiaoyun Xu
Qiaoyun Xu
Kai-Hung LuKai-Hung Lu
Kai-Hung Lu
LALingling An
Lingling An
XLXiaomei Lin
Xiaomei Lin
Power-electronic converter control is a key issue in the weak-grid integration of doubly fed induction generator (DFIG)-based offshore wind farms. In conventional fixed-reference DFIG control, the rotor-side power command is usually treated as a tracking target, although its suitability may change with the present point of common coupling (PCC) voltage and phase-angle condition. This paper proposes a weak-grid dynamic sensitivity-based model reference governor (WG-DSMRG) for DFIG offshore wind-farm converter control. The governor is inserted upstream of the RSC power-reference path, while the conventional RSC/GSC current controllers, phase-locked loop (PLL), coordinate transformations, and modulation structure are retained. The short-horizon relation between wind-farm power variation and PCC voltage-angle response is estimated from measured electrical signals. The RSC power command is then corrected through weak-grid scheduling and converter-capability projection. A 60-MW offshore DFIG wind farm connected to a weak AC grid is tested under an upstream voltage sag and a PCC single-line-to-ground fault. In the tested cases, the PCC reactive-power peak decreases from about 3.5 Mvar to 2.5 Mvar, and the DC-link voltage peak is reduced under both disturbances. The evaluated PCC voltage and current THD values are also lower with the proposed controller. These results show that reference-layer correction can improve weak-grid integration and power quality without replacing the established DFIG converter-control platform.

8 July 2026 in Processes
Verified
Journal Article
Open access
PDF file
Kai-Hung LuKai-Hung Lu
Kai-Hung Lu
WQWenjun Qian
Wenjun Qian
JWJiajue Wu
Jiajue Wu
LYLei Yu
Lei Yu
LALingling An
Lingling An
XLXiaomei Lin
Xiaomei Lin
Low-carbon OPF studies usually include carbon cost or emission limits in generation-side dispatch, while carbon-accounting studies often evaluate emissions after dispatch. The link between transmission-side flow control and carbon settlement has received less attention. In particular, it remains unclear how UPFC-driven changes in branch flows and losses should affect allowance balance, trading volume, and settlement cost in preventive OPF. This paper therefore proposes a transmission-state-dependent carbon-trading settlement method for UPFC-assisted preventive OPF. Different from post-dispatch carbon accounting, the proposed method calculates carbon-trading quantities from the same network-feasible dispatch solution that determines UPFC-regulated flows, network losses, thermal generation, and contingency feasibility. The model is written in equivalent current injection form. A social-learning artificial bee colony algorithm with feasibility repair is used to solve the constrained problem, with infeasible trial solutions repaired according to power-balance, operating-limit, and carbon-trading constraints. The Taipower 345 kV transmission system is used for testing. Under the annual average daily load condition, line losses are reduced from 27,126.55 MWh to 21,281.92 MWh, while carbon emissions decrease from 300,988.72 tCO2 to 279,527.70 tCO2, corresponding to reductions of 21.55% and 7.13%. The generator-side profit remains positive at TWD 11,000,763. The combined UPFC-PCOPF case also satisfies the screened post-contingency line-loading and voltage constraints. The full-year cases show a similar reduction pattern. These results suggest that carbon-trading settlement is not a fixed post-dispatch accounting item. In UPFC-assisted dispatch, it is linked to transmission losses and thermal generation.