In anticipation of an Electron Cyclotron Resonance Heating system upgrade for the stellarator Wendelstein 7-X, a 1.5 MW - 140 GHz continuous-wave gyrotron is under development. In order to provide a first experimental verification of the scientific RF and electron beam optics design of the gyrotron with ms pulses, the Karlsruhe Intitule of Technology has developed a short-pulse pre-prototype gyrotron. In this work, we present details regarding the construction of the pre-prototype as well as measurements from the first experimental campaign delivering up to 1.6 MW in short pulses.
17 January 2023 in IEEE Transactions on Electron Devices
The multistage depressed collector (MDC) is essential to significantly increase the overall efficiency of the gyrotron. To date, a short pulse (SP) MDC prototype system has been manufactured and is currently under test. The long-term goal that makes the most sense is to use MDCs on 2-MW fusion gyrotrons in continuous wave (CW) operation. To achieve this, a CW MDC system based on the same physical principle as the SP system is designed and analyzed for the first time. The highlights of this design are the sweeping systems to keep the thermal loading within an acceptable limit when the MDC is operated in CW. In the present analysis, the expected performance and size of the new CW MDC design are compared with that of the SP MDC prototype and with the corresponding single-stage depressed collectors (SDCs) as a reference. In addition, the effects of thermal expansion in CW operation are analyzed and discussed.
In this work, we present the achievements obtained during the commissioning phase of the newly developed 140-GHz continuous-wave tube TH1507U at the gyrotron test stand of the electron-cyclotron resonance heating facility of the Wendelstein 7-X stellarator. The gyrotron is based on the successful 1-MW class industrial TH1507 gyrotron, which operates in the TE 28,8 mode, and has been optimized for operation in the higher-order TE 28,10 mode. The 1-ms short-pulse tests confirmed the nominal output power of 1.5 MW. In a long-pulse operating regime, an output power of 1.3 MW with total efficiency 45.9% was demonstrated at pulse lengths of 3 minutes. Different regimes where the beam current is above 50 A demonstrated a saturation of output power at 1.3 MW, that can be explained by the presence of parasitic modes. A parasite-free operation with an output power of 1.2 MW was achieved with pulses up to 580 s in length. The pulse length was limited due to the existing capabilities of the cooling system at the test stand, and is foreseen to be extended in the future.
1 January 2024 in Review of Scientific Instruments
In this paper, we present the design and commissioning results of the upgraded collective Thomson scattering diagnostic at the Wendelstein 7-X stellarator. The diagnostic has a new radiometer designed to operate between the second and third harmonics of the electron cyclotron emission from the plasma at 171–177 GHz, where the emission background has a minimum and is of order 10–100 eV. It allows us to receive the scattered electromagnetic field with a significantly improved signal-to-noise ratio and extends the set of possible scattering geometries compared to the case of the original instrument operated at 140 GHz. The elements of the diagnostic are a narrowband notch filter and a frequency stabilized probing gyrotron that will allow measuring scattered radiation spectra very close to the probing frequency. Here, we characterize the microwave components applied to the radiometer and demonstrate the performance of the complete system that was achieved during the latest experimental campaign, OP2.1.