Ioannis Chelis

Ioannis Chelis

Auto-generated profile, based on publicly available information

Ioannis Chelis

Department of Physics, National and Kapodistrian University of Athens, Athens, Greece

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
23 May 2022 in Fusion Engineering and Design
Verified
Journal Article
Open access
MTM.Q. Tran
M.Q. Tran
PAP. Agostinetti
P. Agostinetti
Gaetano AielloGaetano Aiello
Gaetano Aiello
KAK. Avramidis
K. Avramidis
BBB. Baiocchi
B. Baiocchi
WZW. Zhang
W. Zhang

1 March 2021 in Fusion Engineering and Design
Verified
Journal Article
Closed access
KAKonstantinos A. Avramidis
Konstantinos A. Avramidis
ZIZisis C. Ioannidis
Zisis C. Ioannidis
Gaetano AielloGaetano Aiello
Gaetano Aiello
PBPatrick Bénin
Patrick Bénin
ICIoannis Chelis
Ioannis Chelis
roberto citarellaroberto citarella
roberto citarella

30 April 2019 in Nuclear Fusion
Verified
Journal Article
Closed access
PDF file
KAKonstantinos A. Avramidis
Konstantinos A. Avramidis
GAGaetano Aiello
Gaetano Aiello
SAStefano Alberti
Stefano Alberti
PBPhilipp Thomas Brücker
Philipp Thomas Brücker
ABAlex Bruschi
Alex Bruschi
MTMinh Quang Tran
Minh Quang Tran

14 April 2021 in IEEE Electron Device Letters
Verified
Journal Article
Closed access
ZIZisis C. Ioannidis
Zisis C. Ioannidis
KAKonstantinos A. Avramidis
Konstantinos A. Avramidis
TRTomasz Rzesnicki
Tomasz Rzesnicki
ICIoannis Chelis
Ioannis Chelis
GGGerd Gantenbein
Gerd Gantenbein
JJJohn Jelonnek
John Jelonnek
In anticipation of an Electron Cyclotron Resonance Heating system upgrade for the stellarator Wendelstein 7-X, a 1.5 MW - 140 GHz continuous-wave gyrotron is under development. In order to provide a first experimental verification of the scientific RF and electron beam optics design of the gyrotron with ms pulses, the Karlsruhe Intitule of Technology has developed a short-pulse pre-prototype gyrotron. In this work, we present details regarding the construction of the pre-prototype as well as measurements from the first experimental campaign delivering up to 1.6 MW in short pulses.

27 October 2020 in IEEE Transactions on Electron Devices
Verified
Journal Article
Closed access
ZIZisis C. Ioannidis
Zisis C. Ioannidis
ICIoannis Chelis
Ioannis Chelis
GGGerd Gantenbein
Gerd Gantenbein
TRTomasz Rzesnicki
Tomasz Rzesnicki
JJJohn Jelonnek
John Jelonnek
High-power gyrotrons may suffer from parasitic oscillations that are excited in the electron-beam compression zone. Different damping structures are proposed in the literature that reduce the possibility of parasitic excitation by increasing the starting currents of the modes. In this work, we focus on a dielectric-loaded ,(stacked) beam tunnel. Based on our previous theoretical studies, we make targeted modifications to the beam tunnel in order to classify the parasitic signals and localize the areas where they are excited. After two successive modifications, the beam tunnel exhibits improved behavior with higher starting currents of the parasitic modes. ,The experiments are performed by using a modular 170-GHz, 1-MW short-pulse gyrotron, which due to its flanged construction gives the possibility to modify the beam tunnel without affecting the rest of the tube.

14 August 2024 in Nuclear Fusion
Verified
Journal Article
Open access
ABAlessandro Bruschi
Alessandro Bruschi
JHJean-Philippe Hogge
Jean-Philippe Hogge
JJJohn Jelonnek
John Jelonnek
DSDirk Strauss
Dirk Strauss
CWChuanren Wu
Chuanren Wu
AXAnastasia Xydou
Anastasia Xydou
The European DEMO (EU-DEMO) reactor studies within EUROfusion aim to develop a fusion power plant concept. The large tokamak device needs an auxiliary heating power which, at the present stage, is provided by the Electron Cyclotron (EC) heating system with up to 130 MW foreseen to reach different regions of plasma for heating, suppression of instabilities and the possibility to support ramp-up and ramp-down phases. The present conceptual design of the system is based on 2 MW coaxial-cavity gyrotron sources, a transmission line (TL) using both circular corrugated waveguides and quasi-optical evacuated multi-beam TLs, and mirror antennas located in the Equatorial Port. In order to create a modular system, the sources are grouped in ‘clusters’, whose powers are combined in the quasi-optical TL, up to the tokamak building, where they are split and routed as single waveguides. In the launcher, they are combined together again on the launching mirrors, to save space for the apertures in the Breeding Blanket. The present EC heating system has a certain flexibility to adapt to changing design guidelines. The development status of the system is presented.