23 May 2022 in Fusion Engineering and Design
1 March 2021 in Fusion Engineering and Design
30 April 2019 in Nuclear Fusion
14 April 2021 in IEEE Electron Device Letters
In anticipation of an Electron Cyclotron Resonance Heating system upgrade for the stellarator Wendelstein 7-X, a 1.5 MW - 140 GHz continuous-wave gyrotron is under development. In order to provide a first experimental verification of the scientific RF and electron beam optics design of the gyrotron with ms pulses, the Karlsruhe Intitule of Technology has developed a short-pulse pre-prototype gyrotron. In this work, we present details regarding the construction of the pre-prototype as well as measurements from the first experimental campaign delivering up to 1.6 MW in short pulses.
27 October 2020 in IEEE Transactions on Electron Devices
High-power gyrotrons may suffer from parasitic oscillations that are excited in the electron-beam compression zone. Different damping structures are proposed in the literature that reduce the possibility of parasitic excitation by increasing the starting currents of the modes. In this work, we focus on a dielectric-loaded ,(stacked) beam tunnel. Based on our previous theoretical studies, we make targeted modifications to the beam tunnel in order to classify the parasitic signals and localize the areas where they are excited. After two successive modifications, the beam tunnel exhibits improved behavior with higher starting currents of the parasitic modes. ,The experiments are performed by using a modular 170-GHz, 1-MW short-pulse gyrotron, which due to its flanged construction gives the possibility to modify the beam tunnel without affecting the rest of the tube.
14 August 2024 in Nuclear Fusion
The European DEMO (EU-DEMO) reactor studies within EUROfusion aim to develop a fusion power plant concept. The large tokamak device needs an auxiliary heating power which, at the present stage, is provided by the Electron Cyclotron (EC) heating system with up to 130 MW foreseen to reach different regions of plasma for heating, suppression of instabilities and the possibility to support ramp-up and ramp-down phases. The present conceptual design of the system is based on 2 MW coaxial-cavity gyrotron sources, a transmission line (TL) using both circular corrugated waveguides and quasi-optical evacuated multi-beam TLs, and mirror antennas located in the Equatorial Port. In order to create a modular system, the sources are grouped in ‘clusters’, whose powers are combined in the quasi-optical TL, up to the tokamak building, where they are split and routed as single waveguides. In the launcher, they are combined together again on the launching mirrors, to save space for the apertures in the Breeding Blanket. The present EC heating system has a certain flexibility to adapt to changing design guidelines. The development status of the system is presented.