College of Safety Science and Engineering, Xi’an University of Science and Technology, Xi’an 710054, P. R.China / Room 1501, College of Mechanical and Electrical Engineering, China University of Mining & Technology, No.58 Yan Ta Road , Xi’an, 710054, Shaa
Auto-generated profile, based on publicly available information
Shu-Gang Li
College of Safety Science and Engineering, Xi’an University of Science and Technology, Xi’an 710054, P. R.China / Room 1501, College of Mechanical and Electrical Engineering, China University of Mining & Technology, No.58 Yan Ta Road , Xi’an, 710054, Shaa
A drainage roadway was constructed in the fractured zone beside an air-return roadway of a mining site. However, drainage roadways serve only one working face and are discarded after mining, thus weakening sustainable mining practices. To improve the sustainability at mining sites, this paper proposes a new drainage roadway that can serve two adjacent working faces. A schematic layout of the proposed lateral high drainage roadway (LHDR) is presented. The LHDR can be used to extract pressurized gas from two neighboring mining zones. A theoretical study, numerical simulation, and field observations were performed to identify the mining-induced fractures and stress distribution. The layout of the LHDR and the optimal position of the extraction boreholes were derived considering the geological conditions in the Liyazhuang Coal Mine in China. A borehole and LHDR were installed at the specified mining site and the rock displacement of the LHDR and gas concentration at branch pipelines, boreholes of the LHDR, and upper part of the working face were monitored during mining. The performance of the LHDR was validated.
1 April 2018 in Tehnicki vjesnik - Technical Gazette
The main roof directly affects the stress environment and the control effect of the surrounding rock of gob-side entry driving. A mechanical model of the surrounding rock of gob-side entry driving was established to analyze the influence...