Dongping Cao

Dongping Cao

Auto-generated profile, based on publicly available information

Dongping Cao

Tongji Univ

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2019 in International Journal of Project Management
Verified
Journal Article
Closed access
MOMehran Oraee
Mehran Oraee
M. Reza HosseiniM. Reza Hosseini
M. Reza Hosseini
DEDavid J. Edwards
David J. Edwards
Heng LiHeng Li
Heng Li
EPEleni Papadonikolaki
Eleni Papadonikolaki
DCDongping Cao
Dongping Cao

1 January 2015 in Automation in Construction
Verified
Journal Article
Closed access
DCDongping Cao
Dongping Cao
GWGuangbin Wang
Guangbin Wang
Heng LiHeng Li
Heng Li
MSMartin Skitmore
Martin Skitmore
THTing Huang
Ting Huang
WZWeiyu Zhang
Weiyu Zhang

1 December 2014 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
DCDongping Cao
Dongping Cao
Heng LiHeng Li
Heng Li
GWGuangbin Wang
Guangbin Wang
Drawing on institutional theory, this study examines how three types of isomorphic pressures (i.e., coercive, mimetic, and normative pressures) impact building information modeling (BIM) adoption activities in construction projects. The effects of these pressures are empirically tested with survey data collected from 92 construction projects in China. The results from partial least squares analyses indicate that coercive and mimetic pressures both significantly influence the extent of project-level BIM adoption. However, this study does not find support for a significant influence of normative pressures. The results further indicate that client/owner support plays a crucial but varied mediating role in the influences of these different isomorphic pressures. This study reinforces the need to regard project BIM adoption as a complexly socialized activity that is not only motivated by participants' rational needs to proactively address internal process problems, but also driven by external isomorphic pressures related to the acquisition of institutional legitimacy. The findings also provide insights into how different types of institutional forces can be better manipulated to facilitate the diffusion of BIM in the construction industry.Department of Building and Real Estat

1 May 2018 in Journal of Computing in Civil Engineering
Verified
Journal Article
Closed access
XLXiaochun Luo
Xiaochun Luo
Heng LiHeng Li
Heng Li
DCDongping Cao
Dongping Cao
Fei DaiFei Dai
Fei Dai
JSJoonOh Seo
JoonOh Seo
SangHyun LeeSangHyun Lee
SangHyun Lee
Timely and overall knowledge of the states and resource allocation of diverse activities on construction sites is critical to resource leveling, progress tracking, and productivity analysis. Despite its importance, this task is still performed manually. Previous studies have taken a significant step forward in introducing computer vision technologies, although they have been oriented toward limited classes of objects or limited types of activities. Furthermore, they especially focus on single activity recognition, where an image contains only the execution of an activity by one or a few objects. This paper introduces a two-step method for recognizing diverse construction activities in still site images. It detects 22 classes of construction-related objects using convolutional neural networks. With objects detected, semantic relevance representing the likelihood of the cooperation or coexistence between two objects in a construction activity, spatial relevance representing the two-dimensional pixel proximity in the image coordinates, and activity patterns are defined to recognize 17 types of construction activities. The advantage of the proposed method is its potential to recognize diverse concurrent construction activities in a fully automatic way. Therefore, it is possible to save managers’ valuable time in manual data collection and concentrate their attention on solving problems that necessarily demand their expertise.

1 May 2017 in International Journal of Project Management
Verified
Journal Article
Closed access
DCDongping Cao
Dongping Cao
Heng LiHeng Li
Heng Li
GWGuangbin Wang
Guangbin Wang
THTing Huang
Ting Huang

1 October 2018 in Automation in Construction
Verified
Journal Article
Closed access
XLXiaochun Luo
Xiaochun Luo
Heng LiHeng Li
Heng Li
DCDongping Cao
Dongping Cao
Yantao YUYantao YU
Yantao YU
Xincong YangXincong Yang
Xincong Yang
THTing Huang
Ting Huang