Research Focus & Metrics

Academic Career Length

28Years (1999-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2011 in Biomass and Bioenergy
Verified
Journal Article
Closed access
TYTakuyuki Yoshioka
Takuyuki Yoshioka
RSRin Sakurai
Rin Sakurai
Kazuhiro ArugaKazuhiro Aruga
Kazuhiro Aruga
HSHideo Sakai
Hideo Sakai
HKHiroshi Kobayashi
Hiroshi Kobayashi
KIKoki Inoue
Koki Inoue

3 May 2018 in Journal of Forest Research
Verified
Journal Article
Closed access
SBSimon Berg
Simon Berg
MYMika Yoshida
Mika Yoshida
RSRin Sakurai
Rin Sakurai
HSHideo Sakai
Hideo Sakai
The harvesting costs in Japan need to be reduced to increase the wood supply. Detailed information about machine productivity facilitates the identification of the most cost-effective machines. Therefore, an IWAFUJI GS-65LJV grapple (GS65), two IWAFUJI GS-90LJV grapples (GS90), an IHI F801 forwarder (F801) and a Morooka MST800VDL forwarder (MST800) were studied at a thinning (site 1). A GS90, a KETO 150 Eco processor (KETO150) and a Morooka MST1500VDL forwarder (MST1500) were also studied in a clear-cutting (site 2). The difference between the GS65’s and the GS90’s unloading time at site 1 was insignificant. The GS65’s loading time was significantly faster than the GS90’s loading time at site 1, but the conditions were different. It is, therefore, likely that the GS65 is preferable to use as it is less expensive. The loaded assortment decided whether the GS90 or the KETO150 was more productive at site 2. The GS90 is preferable to use as it is less expensive. The F801 was faster than the MST800 and MST1500 and is, therefore, more productive except on short forwarding distances as it is slightly more time-consuming to load. Larger Japanese forwarders and grapple loaders like the GS65, GS90, F801, MST800 and MST1500 seemed to be more productive than smaller forwarders and grapple loaders.

13 August 2018 in International Journal of Forest Engineering
Verified
Journal Article
Closed access
MYMika Yoshida
Mika Yoshida
RSRin Sakurai
Rin Sakurai
HSHideo Sakai
Hideo Sakai
Frequent heavy rainfall is suspected to cause failures on spur roads especially those constructed by earthworks . It is essential to construct robust, cost-efficient and well-maintained road networks to react to uncertain events. Laser imaging detection and ranging technology (LiDAR) can measure the topography. By constructing spur roads based on the watercourse map estimated from the digital elevation model taken by LiDAR, the change of watercourses could be followed by using LiDAR after construction and spur road failures were surveyed to evaluate the road planning process. The route was selected to avoid watercourses using stable points such as natural bench. The roads crossing the watercourses were protected from surface runoff by dispersal drainage systems. The route and dispersal drainage systems effectively prevented runoff from soil erosion from a cut slope. The height of the cut slope and the stability of the natural slope were key for routing and selecting drainage systems. Spur roads with functional dispersal drainage systems at appropriate places are expected to improve the ability of water conservation in mountainous forests, which could contribute to keeping them as the “green infrastructure” and adapting to climate change.

15 November 2017 in Forests
Verified
Journal Article
Open access
PDF file
TYTakuyuki Yoshioka
Takuyuki Yoshioka
RSRin Sakurai
Rin Sakurai
SKShohei Kameyama
Shohei Kameyama
KIKoki Inoue
Koki Inoue
BHBruce Hartsough
Bruce Hartsough
The processing of woody biomass waste piles for use as fuel instead of burning them was investigated. At each landing of slash pile location, a 132 kW grapple excavator was used to transfer the waste piles into a 522 kW horizontal grinder. Economies of scale could be expected when grinding a larger pile, although the efficiency of the loading operation might be diminished. Here, three piles were ground and the operations were time-studied: Small (20 m long × 15 m wide × 4 m high), Medium (30 × 24 × 4 m), and Large (35 × 30 × 4 m) piles. Grinding the Medium pile was found to be the most productive at 30.65 bone dry tons per productive machine hour without delay (BDT/PMH0), thereby suggesting that there might be an optimum size of slash pile for a grinding operation. Modeling of the excavator and grinder operations was also examined, and the constructed simulation model was observed to well-replicate the actual operations. Based on the modeling, the productivity of grinding at a landing area of 710 m2 of slash pile location was estimated to be 31.24 BDT/PMH0, which was the most productive rate.

1 November 1999 in Journal of Forest Research
Verified
Journal Article
Closed access
PDF file
MIMasahiro Iwaoka
Masahiro Iwaoka
Kazuhiro ArugaKazuhiro Aruga
Kazuhiro Aruga
RSRin Sakurai
Rin Sakurai
KCKoo Hyun Cho
Koo Hyun Cho
HSHideo Sakai
Hideo Sakai
HKHiroshi Kobayashi
Hiroshi Kobayashi
Medium to large size harvester heads mounted on large machines are popular in Japan. These machines encounter some problems during thinning operations,e.g. damage to residual stand and the compaction of soil. The performance of these large harvesters was compared with that of smaller ones operating simultaneously in the same line thinning operation of the same stand. The results of a time study showed that mean cycle times for the smaller and larger harvesters were not significantly different. This means that the work efficiency of the smaller harvester can be at the same level as the larger harvester on sites similar to those of this study. The mean values “Feed” element of the cycle time, however, were significantly different. Although this time difference appears to provide an advantage to the larger harvester, simulation results show that the advantage is not great enough to significantly shorten the total cycle times. That is to say, the work efficiency remains essentially the same even if the feeding performance of the small size harvester becomes as high as that of larger ones. The small harvester performs adequately in thinning operations, and is not inferior to the larger ones. This result indicates that there is economic potential for small base machines that can be mounted with small harvester heads, resulting in less damage to residual trees and site soils during thinning operation.

12 October 2017 in Preprints.org
Verified
Preprint
Open access
PDF file
TYTakuyuki Yoshioka
Takuyuki Yoshioka
RSRin Sakurai
Rin Sakurai
SKShohei Kameyama
Shohei Kameyama
KIKoki Inoue
Koki Inoue
BHBruce Hartsough
Bruce Hartsough
The processing of woody biomass waste piles for use as fuel instead of burning them was investigated. At each landing slash pile location, a 132 kW grapple excavator was used to transfer the waste piles into a 522 kW horizontal grinder. Economies of scale could be expected when grinding a larger pile, although the efficiency of the loading operation might be diminished. Here, three piles were ground and the operations were time-studied: Small (20 m long × 15 m wide × 4 m high), Medium (30 × 24 × 4 m), and Large (35 × 30 × 4 m) piles. Grinding the Medium pile was found to be the most productive at 30.65 bone dry tons per productive machine hour without delay (BDT/PMH0), thereby suggesting that there might be an optimum size of slash pile for a grinding operation. We also examined modeling of the excavator and grinder operations, and we observed that the constructed simulation model well-replicated the actual operations. Based on the modeling, we estimated that the productivity of grinding at a landing area of 710 m2 of slash pile location was 31.24 BDT/PMH0, which was the most productive rate.