In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam. Graphical Abstract
14 July 2013 in Journal of Radioanalytical and Nuclear Chemistry
A new horizontal shift bump electromagnet for the J-PARC 3-GeV RCS injection bump system was designed and fabricated. The bump magnet is a pulse magnet that repeatedly excites a trapezoidal waveform of about 1.5 ms duration at 25 Hz. And it is possible to change of the rising and falling time of the pulse waveform with the maximum current of 16 kA and the voltage of 12 kV between 150 and 500 microseconds according to the optimum beam generation condition. In order to design such magnets of such specifications, three-dimensional dynamic magnetic field analysis capable of evaluating eddy currents is required. Using one electromagnet model, comparison of static magnetic field analysis with dynamic magnetic field analysis, and two-dimensional calculations with three-dimensional ones were studied. In addition, we also confirmed the difference between the analysis and measurements as well as the difference of the magnetic field measurement method between the search coil and the Hall probe. We could then have established a pulse electromagnet design method.
20 June 2025 in Physical Review Accelerators and Beams
At the 3-GeV rapid cycling synchrotron (RCS) of the Japan Proton Accelerator Research Complex, we have minimized the beam loss at high-intensity beam operation up to the designed beam power of 1 MW. This was accomplished through systematic numerical simulations and experimental studies conducted over 2 years from 2020 and 2022. We first focused on mitigating uncontrolled beam losses originating from the foil scattering of the circulating beam, which results in high residual radiation levels, particularly in the injection area. These uncontrolled beam losses were well mitigated by reducing the stripper foil size and optimizing the injection beam size. Subsequently, we attempted to minimize the space charge effects and the associated beam losses at 1 MW by implementing several measures, such as refining both longitudinal and transverse injection paintings, correcting betatron resonances, and optimizing betatron tunes at injection. Consequently, we reduced beam losses throughout the RCS, including the collimator area, by 80% as compared to those observed at 1-MW trial operation in 2020. The residual beam loss at 1 MW is now estimated to be well below 10 − 3 , which is primarily attributed to residual foil scattering-induced beam losses. Notably, beam losses in areas other than the collimator section are uncontrolled and required to be well minimized to ensure stable operation and regular accelerator maintenance. We have considerably reduced the machine activation, achieving a 1-order-of-magnitude decrease at the collimator compared to that in 2020. This improvement has enabled the RCS to maintain more than 98% availability for user operation recently. The simulation and measurement results, demonstrating good agreement, provide a detailed understanding of the beam loss mechanism at each step and guide the implementation of effective optimizations.
31 May 2023 in Physical Review Accelerators and Beams
At the Rapid Cycling Synchrotron (RCS) in Japan Proton Accelerator Research Complex (J-PARC), theoretical predictions have indicated that the kicker impedance would excite the beam instability. A 1-MW beam with large emittance can be delivered to the Material and Life Science Experimental Facility through suppression of the beam instabilities by choosing the appropriate machine parameters. However, we require other high-intensity and high-quality smaller emittance beams (than the 1-MW beam) for the main ring. Hence, we proposed a scheme for suppressing the kicker impedance by using prototype diodes and resistors, thereby demonstrating the effect on the kicker impedance reduction. However, the J-PARC RCS must be operated with a repetition rate of 25 Hz, which urged us to consider special diodes that are tolerant to heating. After developments, we have demonstrated that the special diodes with resistors can suppress the beam instability by reducing the kicker impedance. Enhanced durability of the prototype diodes and resistors for the 25-Hz operation was also realized. Moreover, the new diodes and the resistors have a negligible effect on the extracted beam from the RCS. From a simulation point of view, the scheme can be employed for at least 5-MW beam operation within the stipulated specifications.