Abhinav Saxena

Abhinav Saxena

Auto-generated profile, based on publicly available information

Abhinav Saxena

GE-Research, Niskayuna, New York

Research Focus & Metrics

Academic Career Length

24Years (2003-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 April 2024 in Nuclear Technology
Verified
Journal Article
Open access
AIArk Ifeanyi
Ark Ifeanyi
DSDaniel Dos Santos
Daniel Dos Santos
ASAbhinav Saxena
Abhinav Saxena
JCJamie Baalis Coble
Jamie Baalis Coble

1 January 2007
Verified
Conference Paper
Closed access
LTLiang Tang
Liang Tang
ASAbhinav Saxena
Abhinav Saxena
MOMarcos E. Orchard
Marcos E. Orchard
GKGregory J. Kacprzynski
Gregory J. Kacprzynski
GVGeorge Vachtsevanos
George Vachtsevanos
APAnn Patterson-Hine
Ann Patterson-Hine
Automated contingency management (ACM), or the ability to confidently and autonomously adapt to fault and/or contingency conditions with the goal of still achieving mission objectives, can be considered the ultimate technological goal of a health management system. To establish confidence on the ACM system, objective performance evaluations should be executed. The need for verification and validation (V&V) techniques for ACM has also been specifically identified by DOD agencies and within the NASA community recently. This paper presents a general process and related techniques for developing and validating ACM systems for advanced propulsion systems. A novel ACM modeling paradigm, optimization-based ACM strategies, V&V approaches and performance metrics are developed. While some well-established formal methods such as model checking techniques are applicable to some sub-problems, this research has been more focused on innovative informal methods that attempt to address ACM performance requirements, optimality, robustness, etc. A pressure fed, monopropellant propulsion system for a small space flight vehicle is utilized as initial proof-of-concept implementation for the proposed techniques and preliminary simulation results are presented.

1 January 2003
Verified
Book Chapter
Closed access
ASA. Saxena
A. Saxena

1 December 2013 in International Journal of Prognostics and Health Management
Verified
Journal Article
Open access
PDF file
DHDavid He
David He
EBEric Bechhoefer
Eric Bechhoefer
ASAbhinav Saxena
Abhinav Saxena
WIND POWER generating capacity was 239 GW at the end of 2011, with a further 46 GW of installed capacity to be operational by the end of 2012. While only providing 2.8% of the energy produced in the United States, it is anticipated that by 2030, almost 20% of the total electrical energy will come from wind. This widespread deployment of industrial wind projects will require a more proactive maintenance strategy in order to be more cost competitive with traditional energy systems, such as natural gas or coal. This will be particularly true for offshore wind projects, where availability of the site for maintenance can be restricted for extended periods of time due to weather conditions. Prognostics and Health Management (PHM) of these assets can improve operational availability while reducing the cost of unscheduled maintenance.