Linda E. Merrin

Linda E. Merrin

Auto-generated profile, based on publicly available information

Linda E. Merrin

Commonwealth Scientific and Industrial Research Organisation, Australia

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 June 2013 in Wetlands
Verified
Journal Article
Closed access
PDF file
Yun ChenYun Chen
Yun Chen
Chang HuangChang Huang
Chang Huang
CTCatherine Ticehurst
Catherine Ticehurst
LMLinda Merrin
Linda Merrin
PTPeter Thew
Peter Thew

23 December 2013 in Ecohydrology
Verified
Journal Article
Closed access
PDF file
Yun ChenYun Chen
Yun Chen
BWBing Wang
Bing Wang
CPCarmel A. Pollino
Carmel A. Pollino
SCSusan M. Cuddy
Susan M. Cuddy
LMLinda E. Merrin
Linda E. Merrin
Chang HuangChang Huang
Chang Huang

27 May 2020 in Ecohydrology
Verified
Journal Article
Closed access
PDF file
DNDaryl L. Nielsen
Daryl L. Nielsen
LMLinda E. Merrin
Linda E. Merrin
CPCarmel A. Pollino
Carmel A. Pollino
FKFazlul Karim
Fazlul Karim
DSDanial Stratford
Danial Stratford
JOJackie O'Sullivan
Jackie O'Sullivan

30 April 2020 in Water
Verified
Journal Article
Open access
PDF file
FKFazlul Karim
Fazlul Karim
SMSteve Marvanek
Steve Marvanek
LMLinda E. Merrin
Linda E. Merrin
DNDaryl Nielsen
Daryl Nielsen
JHJustin Hughes
Justin Hughes
CPCarmel A. Pollino
Carmel A. Pollino
Hydrological connectivity between rivers and wetlands is considered one of the key critical factors for the integrity of floodplain landscapes. This study is a comprehensive modelling exercise on quantifying flood-induced wetland connectivity and the potential impacts of climate and water storage in an unregulated river basin in northern Australia. Flood inundation was simulated using a two-dimensional hydrodynamic model and the connectivities between wetlands and rivers were calculated using geoprocessing tools in ArcGIS. Wetlands in the floodplain were identified using waterbody maps derived from satellite imagery. A broadly representative sample of 20 wetlands were selected from 158 wetlands in the Mitchell basin considering location, size and spatial distribution. Five flood events ranging from 1 in 2 to 1 in 100 years were investigated to evaluate how connectivity changes with flood magnitude. Connectivities were assessed for the current condition as well as for two scenarios of future climate (Cwet and Cdry) and one scenario of dam storage. Results showed that a 1 in 100 years event inundated about 5450 km2 of land compared to 1160 km2 for a 1 in 2 years event. Average connectivity of wetlands in the Mitchell basin varies from 1 to 5 days for the floods of 1 in 2 to 1 in 26 years. As expected, a large flood produces longer duration of connectivity relative to a small flood. Results also showed that reduction in mean connectivity under a dryer climate (up to 1.8 days) is higher than the possibility of increase under a wet climate (up to 1 day). The impacts of a water storage, in the headwater catchment, are highly pronounced in terms of inundation and wetland connectivity (e.g., mean connectivity reduced by 1.7 days). The relative change in connectivity is higher for a small flood compared to that of a large event. These results demonstrate that there is a possibility of both increase and decease in connectivity under future climate. However, any water storage will negatively impact the connectivity between floodplain waterbodies and thus reduce the material exchange resulting in a reduction in primary and secondary productions in rivers and wetlands.

30 December 2019 in Hydrogeology Journal
Verified
Journal Article
Closed access
PDF file
Sreeknth JanardhananSreeknth Janardhanan
Sreeknth Janardhanan
RCRussell Crosbie
Russell Crosbie
TPTrevor Pickett
Trevor Pickett
TCTao Cui
Tao Cui
LPLuk J M Peeters
Luk J M Peeters
AHAlexander Herr
Alexander Herr

17 November 2020 in Water
Verified
Journal Article
Open access
PDF file
KJKlaus Jöhnk
Klaus Jöhnk
KGKerryne Graham
Kerryne Graham
Ashmita SenguptaAshmita Sengupta
Ashmita Sengupta
Yun ChenYun Chen
Yun Chen
SASanthosh Aryal
Santhosh Aryal
PDPeter Durr
Peter Durr
The common carp (Cyprinus carpio) is an invasive species in the rivers and waterways of southeastern Australia, and it has been implicated in the serious decline of many native fish species. Over the past 50 years, various control options have been explored, and to date, these have been ineffective or cost-prohibitive. Most recently, cyprinid herpesvirus 3 (CyHV-3) has been proposed as a biocontrol agent because of its high specificity and mortality rate. However, the virus is known to be only effective in a permissive water temperature range of approximately 16–28 °C. To define when this occurs, we undertook a hydrological reconstruction of five diverse river catchments (>130,000 km2) of southeastern Australia over three decades. This confirmed, in the studied areas, that while water temperatures are permissive from spring through to autumn, the time of year that this starts and ends is highly variable, interannually, and with strong latitudinal and altitudinal gradients between and within catchments. The results show that the virus should be effective with respect to water temperature throughout the water temperature range that carp occur in most of southeastern Australia. However, detailed water temperature estimation would still be required to determine the exact week of the start of release in any given catchment. Referring to observations in wild carp populations, we point out the limitation of developing a “release strategy” based solely on water temperature modelling and the need to incorporate fish biology and ecology into this planning.