1 January 2019 in IEEE Transactions on Sustainable Energy
This paper proposes a double-time-scale coordinated voltage control scheme for distribution networks with distributed generators (DGs) based on the Model Predictive Control (MPC) to regulate the voltage across the network in different time scales by optimally coordinating multiple voltage regulation devices. In the upper-level control (ULC), a slow-time-scale control scheme is designed to correct the long-term voltage deviations while minimizing the number of actions of the on-load tap changer (OLTC), step voltage regulators (SVRs) and capacitor banks (CBs). The MPC problem is formulated as a mixed-integer quadratic programming (MIQP). A tailored exaction solution method based on the Branch-and-Bound (B&B) algorithm embedded with an Alternating Direction Method of Multipliers (ADMM)-based QP solver is proposed to efficiently solve the MIQP without loss of optimality. In the lower-level control (LLC), the active and reactive powers of DGs are optimally coordinated to handle the fast-time-scale voltage fluctuations as well as capture more renewable energy. An efficient analytical sensitivity calculation method is used to online update the voltage sensitivity coefficients. The effectiveness of the proposed control scheme along with the exact solution method is verified on a modified real 20kV distribution system.
7 February 2019 in IEEE Transactions on Sustainable Energy
19 July 2019 in IEEE Transactions on Sustainable Energy
A hierarchical active power control (HAPC) scheme based on alternating direction method of multipliers (ADMM) is proposed for doubly fed induction generator (DFIG) wind farms with distributed energy storage systems (ESSs). The wind farm controllers optimizes the active power references for DFIG wind turbines (WTs) and ESSs inside the wind farm, and the aim is to minimize fatigue loads by minimizing variations of thrust force and shaft torque of WTs while tracking the dispatch command from the transmission system operator (TSO). Moreover, ESSs management is considered. The hierarchical solution method based on ADMM with fast convergence is used to solve the model predictive control(MPC) problem in a hierarchical manner without loss of optimality of the primal problem. With the ADMM, given that the control task is distributed to WT controllers, the computation burden of the central wind farm controller can be efficiently reduced. A wind farm with 10 DFIG WTs was used to validate the control performance of the proposed HAPC scheme.
1 November 2021 in Applied Energy
25 January 2022 in IEEE Transactions on Power Systems
This paper proposes an online voltage control strategy of distributed energy resources (DERs), based on the projected Newton method (PNM), for unbalanced distribution networks. The optimal Volt/VAr control (VVC) problem is formulated as an optimization program, with the goal of maintaining the voltage profile across the network by coordinating the VAr outputs of DERs. To overcome the slow convergence rate of conventional gradient-based methods, a PNM-based solution algorithm is developed to solve this VVC problem. It utilizes a non-diagonal symmetric positive definite matrix, developed from the Hessian matrix of the objective, to scale the gradient, and thus a fast convergence performance can be expected in this Newton-like algorithm. Moreover, taking advantage of the instantaneous feedback of voltage measurements, the online implementation of the PNM-based VVC is further designed to deal with fast system variations. In this online PNM-based VVC scheme, each bus agent communicates the instantaneous voltage measurements to the central agent, and the central agent communicates the VAr output commands of DERs back to each bus agent. The fast convergence performance of PNM results in a stronger capability to track the system variations in real time. Finally, numerical case studies are performed to validate the effectiveness, superiority, and scalability of the proposed method.
25 January 2024 in IEEE Transactions on Sustainable Energy
Existing low-voltage ride-through (LVRT) methods of virtual synchronous generators (VSGs) are facing the problem of inverter damage due to prolonged overcurrent caused by the delay in fault detection. Additionally, the newly updated grid codes (GCs) mandate that inverter-based resources (IBRs) should inject negative-sequence current during asymmetrical faults. To address this issue while complying with the new GCs, this article proposes an adaptive LVRT method. At the onset of the fault, the proposed method compensates for the voltage difference between the reference and feedback values of voltage control loop, while simultaneously adjusting the angle output of the active power loop based on the phase change of the point of connection (POC) voltage and the active power output of the VSG. Thus, it enables a seamless transition between normal and LVRT conditions. Furthermore, it complies with the new GCs and guarantees the maximum utilization of the phase current. The method offers two notable advantages. First, it can achieve fast fault current limitation without the need for fault detection. Second, it eliminates the necessity for parameter design, making it straightforward to implement. The simulation results in PSCAD confirm the effectiveness of the proposed method under different asymmetrical fault conditions.