RIDHA DJAMEL MOHAMMEDI

Dr. RIDHA DJAMEL MOHAMMEDI

Ziane Achour University of Djelfa, Djelfa, Algeria
+1
orcid

Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
9 January 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
RMRIDHA DJAMEL MOHAMMEDI
RIDHA DJAMEL MOHAMMEDI
kouzou Abdellahkouzou Abdellah
kouzou Abdellah
MMMustafa Mosbah
Mustafa Mosbah
ASAissa Souli
Aissa Souli
Jose RodriguezJose Rodriguez
Jose Rodriguez
Mohamed AbdelrahemMohamed Abdelrahem
Mohamed Abdelrahem
Over the last decade, flexible alternating current transmission systems (FACTS) have been crucial in ensuring optimal power distribution within modern power systems. A vital component of FACTS devices is the distribution static compensator (DSTATCOM), which is essential for maintaining a reliable power supply. It is commonly used for reactive power compensation, voltage regulation, and harmonic reduction. Determining the appropriate size and placement of DSTATCOMs is vital to ensuring their efficiency. This study introduces the improved gray wolf optimizer (I-GWO), a refined version of the classical gray wolf optimization (GWO) method. The I-GWO incorporates a dimension learning-based hunting (DLH) strategy to preserve population diversity, balance exploration and exploitation, and prevent the premature convergence of classical GWO. In this research, the I-GWO was applied to determine the optimum allocation and sizing of the DSTATCOMs, considering system constraints, including those presented by the intermittent and stochastic nature of the load and renewable energy resources, specifically wind and solar energy. The suggested approach was successfully tested on 33-, 69-, and 85-bus distribution systems and then compared with existing studies. The results demonstrated the I-GWO-based approach’s superiority in terms of reducing power losses, improving voltage profiles, and enhancing voltage stability.

1 October 2017
Verified
Conference Paper
Closed access
MMMustafa Mosbah
Mustafa Mosbah
SASalem Arif
Salem Arif
RMRIDHA DJAMEL MOHAMMEDI
RIDHA DJAMEL MOHAMMEDI
AHAbdelhafid Hellal
Abdelhafid Hellal
Distribution networks reconfiguration is among the main tasks in distribution management system. The networks reconfiguration is determined by opening and closing switches devices. This reconfiguration can be static or dynamic. In static reconfiguration, the loads are assumed to be constant, while in dynamic reconfiguration loads are assumed to vary according to time. In this work, a dynamic reconfiguration considering the load variation was proposed. A minimum spanning tree (MST) based on Kruskal's algorithm has been applied to find the optimal reconfiguration under multi times, with minimizing the total power loss as objective function. This algorithm was tested on IEEE (33-nodes, 84-nodes) and validated on Algerian distribution network (116 node), using MATLAB Software.

1 November 2016
Verified
Conference Paper
Closed access
MMMustafa Mosbah
Mustafa Mosbah
RMRIDHA DJAMEL MOHAMMEDI
RIDHA DJAMEL MOHAMMEDI
SAS. Arif
S. Arif
AHA. Hellal
A. Hellal
The integration of shunts capacitor in the distribution system can have significant effects on the behavior of the system. An improper insertion of this equipment can cause negative impacts, the solution of these impacts requires an optimal location of shunt capacitors with adequate power injected. The main objective of this study is to determine the optimal placement and size so that the maximum annual benefit due to peak power and reduce energy loss, compared to the cost of installation be minimal. So it is necessary to use optimization techniques that we used the Particle Swarm Optimization (PSO) algorithm to solve this problem. The technique has been validated and tested on different types of distribution network including three IEEE standard networks (10 bus, 15 bus and 34 bus) and applied on a real network of Algerian distribution system.

1 September 2019
Verified
Conference Paper
Closed access
ALAbdelkader Azzeddine Laouid
Abdelkader Azzeddine Laouid
MRMohamed Mounir Rezaoui
Mohamed Mounir Rezaoui
AKAbdellah Kouzou
Abdellah Kouzou
RMRIDHA DJAMEL MOHAMMEDI
RIDHA DJAMEL MOHAMMEDI
This paper exposes a hybrid algorithm using particle swarm optimization and gravitational search algorithms to resolve the optimal PMUs placement (OPP), to achieve full observability of the power network. The principal purpose of the proposed technique is to reduce the total number of PMUs with and without zero injection bus and in the case of one PMU loss while improve the measurement redundancy. The proposed PSO-GSA has been applied to the IEEE 14, 30 and 57-bus.The outcomes show that the number of PMUs is similar to or less than the corresponding results of recently published papers, while the system topological observability is complete.

1 October 2018 in TELKOMNIKA (Telecommunication Computing Electronics and Control)
Verified
Journal Article
Open access
PDF file
RMRIDHA DJAMEL MOHAMMEDI
RIDHA DJAMEL MOHAMMEDI
RZRabie Zine
Rabie Zine
MMMustafa Mosbah
Mustafa Mosbah
SASalem Arif
Salem Arif
Optimum Network Reconfiguration using Grey Wolf Optimizer

1 November 2018
Verified
Conference Paper
Closed access
Laouamer MosbahLaouamer Mosbah
Laouamer Mosbah
AKAbdellah Kouzou
Abdellah Kouzou
RMRIDHA DJAMEL MOHAMMEDI
RIDHA DJAMEL MOHAMMEDI
ATAbdelhalim TLEMCANI
Abdelhalim TLEMCANI
The Phasor Measurement Unit is a contemporary measuring device installed in power system Used for control and monitoring. PMU's are most exact and advance time synchronized technology which extends operation of measurements voltages in the buses and also current phase values which are installed to those buses where these PMU ' s are observed. In this study, The Sine Cosine Algorithm(SCA) is novel method to optimize the placement optimal of the PMU'sin power system visibility. The optimal PMU placement(OPP) problem is intended such that minimizing the number of PMUs placing in power grid. This new method of placement has been tested on 3 standards IEEE-9,14 and 30-Buses.