Serhii Zubko

Dr. Serhii Zubko

PJSC “Zaporizhzhia Iron-ore Plant”

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 January 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Oleg BazalukOleg Bazaluk
Oleg Bazaluk
Petlovanyi MykhailoPetlovanyi Mykhailo
Petlovanyi Mykhailo
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
Serhii ZubkoSerhii Zubko
Serhii Zubko
Kateryna SaiKateryna Sai
Kateryna Sai
Pavlo SaikPavlo Saik
Pavlo Saik
The present paper considers aspects of underground iron ore mining in Ukraine, in particular the level of mine production and reserves of basic ore fields. It analyzes and generalizes the practice of using cemented rockfill under difficult mining and hydrogeological conditions of the Pivdenno-Bilozerske high-grade iron ore field. The Belozersky iron ore district is the only one in Ukraine that, without any technological cycle of beneficiation, can provide both domestic and foreign consumers with high-quality raw iron ore as required by world markets. The PJSC Zaporizhzhia iron ore plant extracts iron ore from the Pivdenno-Bilozerske field with an iron content of more than 60% using the low-waste, environmentally friendly technology of backfilling the mined-out area with a hardening mixture. The peculiarities of the technology for steep deposit mining and the main processes of backfilling operations in terms of preparation, transportation, and construction of the backfill mass with its stability assessment are explained in detail in this paper. As a result of using cemented rockfill, rock mass stability is provided, a considerable part of industrial waste is disposed of in the mined-out area, and the earth’s surface subsidence within the area is prevented (in comparison with mining enterprises in other fields).

10 August 2021 in Minerals
Verified
Journal Article
Open access
PDF file
Oleg BazalukOleg Bazaluk
Oleg Bazaluk
Petlovanyi MykhailoPetlovanyi Mykhailo
Petlovanyi Mykhailo
Serhii ZubkoSerhii Zubko
Serhii Zubko
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
Kateryna SaiKateryna Sai
Kateryna Sai
The paper presents the study of the deformation processes development in unstable rocks of the hanging wall during mining a thick steeply dipping ore deposit in the example of the Yuzhno-Belozerskyi deposit. In the studied field, there are problems of stability of hanging wall rocks, represented by low-resistant shale rocks that do not withstand significant outcrops in time. A decrease in stability is manifested in the form of failure of the hanging wall rocks into the stope. Based on a detailed study of the ore deposit geological structure and the performance of the stopes mining, according to the survey data, an area of the deposit has been identified where the ore failure and dilution reach 4%–8% with a maximum value of 12%. This also makes it possible to determine the most important averaged source data for performing physical modeling on equivalent materials. It has been determined that the deformation value of the hanging wall rocks with subsequent failure into the stope and ore mass deformation in the sloping bottom change exponentially with an increase in the depth of the stope location, and the dynamics of increasing rock deformations in the hanging wall is noticeably higher than in the sloping bottom of the stope. This reduces the quality of the mined ore and increases the probability of rock failure area propagation to the hanging wall drifts with their subsequent destruction. The results of physical modeling are characterised by acceptable reliability and are confirmed by a high similarity with the actual data on ore dilution with broken rocks during the stopes development. It has been found that during the formation of a steeply dipping outcrop of stopes with an area of 1200 m2, unstable rocks of the hanging wall are prone to failure of significant volumes. For successful mining and achieving stope element stability, it is recommended to optimise its parameters, the height, width and the value of a steeply dipping outcrop, as well as to preserve the ore pillar in the hanging wall until the ore is broken and drawn from the rest of the stope.

1 January 2022 in SCIENTIFIC PAPERS OF DONNTU Series: “The Mining and Geology”
Verified
Journal Article
Closed access
MPMykhailo Petlovanyi
Mykhailo Petlovanyi
DTDnipro University of Technology
Dnipro University of Technology
DMDmytro Malashkevych
Dmytro Malashkevych
Kateryna SaiKateryna Sai
Kateryna Sai
Serhii ZubkoSerhii Zubko
Serhii Zubko
Purpose. Development and generalization of a set of key elements for a non-waste technology concept of mining high-quality coal from thin coal seams, based on the processes of backfilling the mined-out space with waste rocks from stope and tunneling operations. Methods. A comprehensive methodical approach, containing the systematization and generalization of the constituent elements of a non-waste coal mining technology based on the implementation of theoretical studies and substantiations, is used in the research. Findings. The main hypothesis of a new approach to non-waste coal mining has been formed, in which the priority is not only the process of leaving the maximum waste rock volume in underground cavities, but also its use to form backfill mass, thereby improving the geomechanical conditions for mining thin coal seams. A wide range of mining tasks has been formulated and systematized for using a non-waste coal mining technology. The conditions for the harmonious functioning of the proposed conceptual scheme of a non-waste coal mining technology within the extraction field boundaries have been determined and substantiated. The conceptual foundations for the functioning of a new highly efficient non-waste technology for mining high-quality thermal coal from thin coal seams have been developed. Originality. The scientific novelty is in revealing the mechanism for the effective logistic functioning of rock-transport systems for the accumulation of waste rocks in the underground space using a non-waste technology of coal mining from thin coal seams. Practical implication. The research results can be used in planning non-waste technological schemes for mining the coal with an increased energy potential. Keywords: non-waste technology, waste mine rocks, backfill, selective mining, stope, drifting face, transportation.