Sillawat Romphochai

Dr. Sillawat Romphochai

Rajamangala University of Technology Thanyaburi
orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 November 2023 in Energies
Verified
Journal Article
Open access
PDF file
SDSaksit Deeum
Saksit Deeum
TCTossaporn Charoenchan
Tossaporn Charoenchan
Natin JanjamrajNatin Janjamraj
Natin Janjamraj
Sillawat RomphochaiSillawat Romphochai
Sillawat Romphochai
SBSergej Baum
Sergej Baum
Krischonme N. BhumkittipichKrischonme N. Bhumkittipich
Krischonme N. Bhumkittipich
This article presents the optimal placement of electric vehicle (EV) charging stations in an active integrated distribution grid with photovoltaic and battery energy storage systems (BESS), respectively. The increase in the population has enabled people to switch to EVs because the market price for gas-powered cars is shrinking. The fast spread of EVs depends solely on the rapid and coordinated growth of electric vehicle charging stations (EVCSs). Since EVCSs can cause power losses and voltage variations outside the permissible limits, their integration into the current distribution grid can be characterized by the growing penetration of randomly dispersed photovoltaic (PV) and battery energy storage (BESS) systems, which is complicated. This study used genetic algorithm (GA) optimization and load flow (accommodation of anticipated rise in the number of electric cars on the road) analysis with a forward and backward sweep methodology (FBSM) to locate, scale and optimize EVCSs from a distribution grid where distributed PV/BESSs are prevalent. Power optimization was demonstrated to be the objective issue, which included minimizing active and reactive power losses. To verify the proposed optimal objective solutions from the active distribution grid, an IEEE 33 bus distribution grid was considered for EVCSs’ optimization under the penetration of photovoltaic and BESS systems. MATLAB simulations for the integrated EVCS-PV-BESS system on the distribution grid for five different zones were performed using detection from zone 1 (ranging from 301.9726 kW to 203.3872 kW), reducing the power losses (accounting for 33%) in the system to a minimum level.

21 August 2024 in IEEE Access
Verified
Journal Article
Open access
RTRadomboon Taksana
Radomboon Taksana
NJNatin Janjamraj
Natin Janjamraj
Sillawat RomphochaiSillawat Romphochai
Sillawat Romphochai
Krischonme N. BhumkittipichKrischonme N. Bhumkittipich
Krischonme N. Bhumkittipich
Mithulan NadarajahMithulan Nadarajah
Mithulan Nadarajah
When a trip occurs, the utility of company-type 115/22 kV loading transformer trips out of the electrical system, cutting off power to the distribution of a company customer. The outage damage is valuable at 8.5 US$/kWh. A 12-step load transfer procedure at the utility control center takes the operator 433 seconds to complete when restoring power to a customer experiencing an outage. Problem number 1 is that many Supervisor Control and Data Acquisition (SCADA) message alarms will appear during the event, which confuses the operator and possibly leads to an incorrect analysis of the trip event details. Problem number 2 occurs in the process where the operator incorrectly predicts the MW-load data of the Loading Transformer will cause a power outage, causing the neighboring loading transformer to overload and cause damage after the operator completes the LTR process. In this study, Pyauto2, an application developed with the Python platform that connects to the utility control center’s SCADA and runs automatically, is introduced Pyauto2 serves two purposes: to work as an operator to reduce person-hours in the utility company’s LTR process and to analyze find accurate answers to trip events of 68 Loading Transformers installed in the electrical system in the central region of Thailand. The last purpose is to use Pyauto2 to reduce the LTR time. Pyauto2 can analyze the SCADA message alarm via fault tree analysis. To help plan the transfer load, it forecasts MW load data on the day of the loading transformer trip using two-time series forecasting techniques. Holt–Winters exponential smoothing (HWS) method is the second technique, and the triple exponential moving average (TEMA) is the first HWS method. In this study, the distorted data are filtered out via the exponential moving average (EMA) technique before being sent to TEMA and HWS for forecasting. The data gathered between 2017 and 2020 revealed distortion in the MW load data, which may be brought on using SCADA equipment or brief communication failures. Temporary outage, reduced traffic on holidays, and arrangement of the distribution grid route. In this study, the grid search method is compared with limited-memory Broyden–Fletcher–Goldfarb–Shanno (L-BFGS) to modify the alpha–gamma–beta value used in this HWS. The prediction error values of the L-BFGS calculations are lower than those of the grid search method, with a mean absolute error of 0.4576, a mean square error of 0.3996, and a root mean square error of 0.6084. After Pyauto2 is introduced, the average LTR time decreases from 433 s to only 64.88 s, and Pyauto2 works as a substitute for the operator and accurately diagnoses the SCADA alarm, preventing the occurrence of neighbor loading transformer supplying power overload after LTR.
1

28 April 2025 in Energies
Verified
Journal Article
Open access
PDF file
CPChaimongkol Pengtem
Chaimongkol Pengtem
SDSaksit Deeum
Saksit Deeum
AAAmirullah Amirullah
Amirullah Amirullah
Hideaki OhgakiHideaki Ohgaki
Hideaki Ohgaki
Sillawat RomphochaiSillawat Romphochai
Sillawat Romphochai
Krischonme N. BhumkittipichKrischonme N. Bhumkittipich
Krischonme N. Bhumkittipich
The potential for electricity distribution in power systems has significantly increased over the years. This is mainly because of the discovery of alternative electricity generation sources, such as renewable energy, coupled with distributed generation (DG), making electricity more widely accessible. However, challenges remain in distributing electricity to remote area communities (RACs), especially because of difficult terrain and the complexity of installing power plants, leaving some areas without access to electricity. In this study, we used an improved particle swarm optimization (IPSO) technique to propose multi-objective energy management for remote area communities within a hybrid integrated Photovoltaic–(PV)–Hydropower plant (HPP)–Battery Energy Storage System (BESS). The multi-objective functions enhance power quality and voltage stability to meet grid code requirements. The proposed method was applied to the IEEE 15-bus system, which is consistent with systems commonly used in remote area communities, under the following scenarios: Case I—random installation of PV-HPP-BESS and PI parameter control of BESS; Case II—optimal location of PV-HP-BESS and PI parameter control of BESS using IPSO; Case III—sudden short circuit of the transmission line in Case II. Effectiveness was verified through hardware-in-the-loop (HIL) testing. The experimental results indicate that the proposed method significantly improves power quality and stability under disturbances, demonstrating superior performance.

21 January 2016
Verified
Conference Paper
Closed access
Sillawat RomphochaiSillawat Romphochai
Sillawat Romphochai
KHKomsan Hongesombut
Komsan Hongesombut
This paper presents fault ride through capability enhancement of Doubly Fed Induction Generator (DFIG) by using Superconducting Fault Current Limiter (SFCL). The specific model of a resistive-type SFCL based on Bi-2212 is implemented to accomplish the DFIG fault ride through improvement. Denmark grid code requirement with below 100 kV is interestingly considered as a criterion of this paper. The study cases are divided into two parts, which are case A for line to line fault and case B for three phase fault. The line to line and three phase faults are supposed to evaluate the characteristics of the Bi-2122 Superconducting Coil (SC) along with fault ride through evaluation. The results of DFIG-based wind turbine with the SFCL for fault ride through evaluation at disparate events are totally investigated that the SFCL effectively enhances the fault ride through performance of DFIG.

6 January 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Komsan HongesombutKomsan Hongesombut
Komsan Hongesombut
SPSuphicha Punyakunlaset
Suphicha Punyakunlaset
Sillawat RomphochaiSillawat Romphochai
Sillawat Romphochai
When an islanding condition caused by an unintentional single-line to ground fault occurs in an active distribution network with distributed generation, the frequency stability and protection issues remain challenging. Therefore, this paper presents the under frequency protection enhancement of the active distribution network using a virtual inertia-controlled-battery energy storage system to improve the frequency stability under the islanding condition caused by unintentional faults. The virtual inertia control is designed based on the direct and quadrature axis-controlled battery energy storage system to generate the virtual inertia power, compensating the system’s inertia to enhance the stability margin. The proposed method is verified by the simulation results that reveal the frequency stability performance and the under-frequency load shedding enhancement of the study active distribution network in Thailand. The study is divided into two cases: the normal control parameters and the parameter uncertainty scenarios, compared with a power-frequency droop control. The simulation results demonstrate that the proposed virtual inertia control can effectively improve the frequency and transient stabilities in the islanding condition, diminishing the number of loads disconnected by the proposed under-frequency load shedding scheme.

10 March 2021
Verified
Conference Paper
Closed access
RRRungsarit Ruensukon
Rungsarit Ruensukon
NTNaowarat Tephiruk
Naowarat Tephiruk
KHKomsan Hongesombut
Komsan Hongesombut
Sillawat RomphochaiSillawat Romphochai
Sillawat Romphochai
The outbreak of COVID-19 has resulted in a shift in economic and social conditions. Most of the electrical energy use is in buildings or dwellings near utility facilities. Therefore, this paper presents a case study of electrical energy use in Mueang Phetchaburi district, Phetchaburi province, Thailand, to study the behavior of electrical energy consumption changes during the COVID-19 pandemic. COVID-19 affects everyday life, such as rapidly decreased and increased electrical energy consumption in some areas. In this paper, the application of geographic information system (GIS) and python programming has been proposed and applied in spatial energy analysis. The results show that the total electrical energy consumption is decreased by approximately 24.48%, and the electrical energy consumption is significantly decreased in the medium business sectors. Whereas, the electrical energy consumption is slightly increased in the residential and commercial sectors. Moreover, the changes in patterns and behaviors of electrical energy uses and how the electrical energy flow affects urban areas can be understood easily.