This article presents the optimal placement of electric vehicle (EV) charging stations in an active integrated distribution grid with photovoltaic and battery energy storage systems (BESS), respectively. The increase in the population has enabled people to switch to EVs because the market price for gas-powered cars is shrinking. The fast spread of EVs depends solely on the rapid and coordinated growth of electric vehicle charging stations (EVCSs). Since EVCSs can cause power losses and voltage variations outside the permissible limits, their integration into the current distribution grid can be characterized by the growing penetration of randomly dispersed photovoltaic (PV) and battery energy storage (BESS) systems, which is complicated. This study used genetic algorithm (GA) optimization and load flow (accommodation of anticipated rise in the number of electric cars on the road) analysis with a forward and backward sweep methodology (FBSM) to locate, scale and optimize EVCSs from a distribution grid where distributed PV/BESSs are prevalent. Power optimization was demonstrated to be the objective issue, which included minimizing active and reactive power losses. To verify the proposed optimal objective solutions from the active distribution grid, an IEEE 33 bus distribution grid was considered for EVCSs’ optimization under the penetration of photovoltaic and BESS systems. MATLAB simulations for the integrated EVCS-PV-BESS system on the distribution grid for five different zones were performed using detection from zone 1 (ranging from 301.9726 kW to 203.3872 kW), reducing the power losses (accounting for 33%) in the system to a minimum level.
This study presents a comprehensive multi-objective optimization framework for optimal placement and sizing of distributed generation (DG) units in electric bus (E-bus) transit systems integrated with a high-power flash charging infrastructure. An enhanced Multi-Objective Grey Wolf Optimizer (MOGWO), utilizing Euclidean distance-based Pareto ranking, is developed to minimize power loss, voltage deviation, and voltage violations. The framework incorporates realistic E-bus operation characteristics, including a 31-stop, 62 km route, 600 kW pantograph flash chargers, and dynamic load profiles over a 90 min simulation period. Statistical evaluation on IEEE 33-bus and 69-bus distribution networks demonstrates that MOGWO consistently outperforms MOPSO and NSGA-II across all DG deployment scenarios. In the three-DG configuration, MOGWO achieved minimum power losses of 0.0279 MW and 0.0179 MW, and voltage deviations of 0.1313 and 0.1362 in the 33-bus and 69-bus systems, respectively, while eliminating voltage violations. The proposed method also demonstrated superior solution quality with low variance and faster convergence, requiring under 7 h of computation on average. A five-method compromise solution strategy, including TOPSIS and Lp-metric, enabled transparent and robust decision-making. The findings confirm the proposed framework’s effectiveness and scalability for enhancing distribution system performance under the demands of electric transit electrification and smart grid integration.