Stephanie Salling

Mrs. Stephanie Salling

Aarhus University, Aarhus, Midtjylland, Denmark
orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 August 2021 in Construction Economics and Building
Verified
Journal Article
Open access
SWSoren Wandahl
Soren Wandahl
CPChristina T. Pérez
Christina T. Pérez
SSStephanie Salling
Stephanie Salling
HNHasse H. Neve
Hasse H. Neve
JLJon Lerche
Jon Lerche
SPSteffen Petersen
Steffen Petersen

20 July 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
CPCristina Toca Pérez
Cristina Toca Pérez
SSStephanie Salling
Stephanie Salling
SWSøren Wandahl
Søren Wandahl
This study is part of an ongoing research project aiming to develop a method for understanding workers’ efficiency (workers’ time spent in value-adding activities) by measuring new indexes, such as workers’ travelled distances and workers’ locations collected by smartwatches. To achieve the objective of the study, a Design Science Research (DSR) strategy was adopted. The first cycle consists of understanding which types of information smartwatches can collect and how this data can be employed for measuring workers’ efficiency. This paper reports a case study as part of the first Cycle of the DSR. The object studied were the activities carried out by a carpenter trade in a housing renovation project. The authors used the geographic coordinates obtained by smartwatches worn by the carpenter trade connected to two Global Navigations Satellite Systems. The primary contribution of this research consists of proposing a set of five guidelines for the application of smartwatches, using data gathered from the case study. The guidelines are: (1) adopt a stratified sampling approach for selecting the workers involved according to their tasks conducted; (2) set up the smartwatches considering workers’ physical features; (3) carefully consider the job site location for delivering the smartwatch to workers; (4) establish assumptions for the data cleaning process regarding construction project features and the study’s goal; and (5) use individual participant data in the analysis according to each participant’s characteristics and role.

1 May 2023 in Journal of Engineering, Project, and Production Management
Verified
Journal Article
Open access
PDF file
SWS. Wandahl
S. Wandahl
CPCristina Toca Pérez
Cristina Toca Pérez
SSStephanie Salling
Stephanie Salling
HNH. H. Neve
H. H. Neve
The Work Sampling (WS) technique, used worldwide to understand how workers spend their time, represents a time-consuming and costly activity. Therefore, several researchers work on different approaches to automate the data collection using sensor-based and vision-based technologies. The challenge of all the sensor-based approaches is that they do not provide the share of time in different work categories. The lack of knowledge on a possible correlation between Direct Work and, e.g., presence, location, or worker movement represents a gap in the current body of knowledge. Thus, this research aims to understand the correlation between Direct Work as the independent predictor variable; and Movement as the dependent response variable. The authors used the data gathered through the application of WS in five case studies on building renovation projects in Denmark. To explain this correlation. The authors selected a combination of four quantitative techniques: (1) curve estimation; (2) linear regression; (3) ANOVA analysis; and (4) t-test. The correlation of the result is discussed considering three assumptions: (1) the structure of the day; (2) global vs. local; and (3) Movement vs. Transporting and Walking. The result shows a significant correlation between Direct Work and Movement with an average R 2 of 0.328. This is considered acceptable predictability taking the socio-technical system aspect of a construction site into account.

1 July 2024
Verified
Conference Paper
Open access
PDF file
CPCristina Toca Pérez
Cristina Toca Pérez
MMMalik Madushanka
Malik Madushanka
LLLorenzo Loyola
Lorenzo Loyola
MEMelisa Ergul
Melisa Ergul
SSStephanie Salling
Stephanie Salling
SWSøren Wandahl
Søren Wandahl
This study is part of an ongoing research project that aims to understand workers' job satisfaction in the construction industry. For that, a survey was applied among construction workers in Denmark. This paper aims to identify the impact of Lean Construction on job satisfaction. Data from 2176 responses were analysed using framework analysis, shorting the answers into three categories: Lean knowledge; Lean application; and Lean operation, even though they declared not knowing Lean. The study investigated the impact of the different levels of Lean familiarity on job satisfaction within five aspects: Project progress; Management-employee relationship; Employee work monitoring; Workload; and Workflow. Findings indicate that only 15% of respondents have some knowledge of Lean concepts, with only 8% confirming its application. The strongest correlation (R 2 =0.557) was found between the Lean practice of "organization attempt to keep workers informed" and the job satisfaction factor of "manager-worker relationship". Allowing the workers to evolve and improve presented, also, a strong correlation with job satisfaction. The study highlights that Lean practices that lead or require Respect for People are the aspects that impact the most on job satisfaction. The results emphasize that implementing Lean principles effectively matters more than merely being familiar with them.

25 March 2026 in Buildings
Verified
Journal Article
Open access
PDF file
SSStephanie Salling
Stephanie Salling
SWSøren Wandahl
Søren Wandahl
CPCristina Toca Pérez
Cristina Toca Pérez
Despite substantial research conducted over the past decades, the transition to a circular construction industry remains in its infancy. The deconstruction of buildings to recover materials for reuse is recognized as a promising strategy for advancing circularity. However, terminological ambiguity and a lack of conceptual consensus continue to lead to misinterpretation and may impede theoretical and practical progress. Based on a systematic literature review of 51 academic and non-academic sources, this paper analyzes the use of core terminology related to deconstruction processes. Ten central terms and expressions are identified, among which ‘demolition’ and ‘deconstruction’ are the most consistently applied, whereas ‘selective demolition’ is used with varying interpretations. To further document the current state of terminology in the field, a glossary of general terms commonly employed is also presented. Clear communication and the explicit definition of applied terms are essential to ensure efficient on-site construction processes and the relevance and value of future studies in this field. To this end, this study aims to enhance transparency and contribute to coherence within the terminological landscape of deconstruction research.

1 September 2026 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
SSStephanie Salling
Stephanie Salling
SWSøren Wandahl
Søren Wandahl
Deconstruction has emerged as a promising strategy for supporting circular construction by reducing waste and enabling the recovery of building components for reuse, yet it remains poorly integrated into mainstream construction practice. Assessing its practical contribution to circular economy objectives requires insight into how onsite workflows are organized and managed. This paper investigates how onsite deconstruction processes are represented in existing research. A systematically identified literature corpus of 51 publications is re-screened using new inclusion criteria focused on execution-related activities and expanded through snowball searching. Fifteen publications are included and analysed across five dimensions of onsite practices: component handling, site logistics, safety, documentation and information use, and management of uncertainty. The first four themes appear with comparable frequency across the studies but are typically treated descriptively, with little attention to workflow structure or coordination, whereas uncertainty is addressed in few publications. No study provides a comprehensive account of onsite deconstruction workflows. The findings indicate a need for further empirical investigation of onsite workflows to assess whether and how planning and control approaches, including those used in Lean Construction, may be relevant in this context.