Productivity is key to the survival and growth of any organisation, industry or nation. Some factors constrain the achievement of the set project objectives in the New Zealand building and construction industry and are responsible for the reported steady decline of productivity and performance. This study aims to identify the key constraints to on-site labour productivity and improvement measures. Using the descriptive survey method, views of some project managers, contractors and subcontractors in New Zealand were canvassed via pilot interviews and questionnaire surveys at the qualitative and quantity data gathering stages, respectively. Multi-attribute technique was used to analyse the quantitative data. Results showed that the key external constraints to on-site labour productivity comprise, in order of decreasing impact, statutory compliance, unforeseen events and wider external dynamics. The internal constraints, which contribute 67 percent of the onsite productivity issues, comprise reworks, level of skill and experience of the workforce, adequacy of method of construction, buildability issues, and inadequate supervision and coordination. . The factors underlying each broad category of external and internal constraints are reported. The relative levels of impact of the identified constraints are expected to guide the project team in addressing the constraints in a cost-effective manner.
Subcontractors handle a major portion—about 85%—of all construction projects in the building industry. The ability of the main contractor and consultants to deliver the project within time, quality and cost targets depends largely on the performance of the subcontractors. Selection of subcontractors on the basis of overall ability to perform is therefore crucial to successful project delivery. The key criteria for assessing subcontractors' eligibility for tender invitation and award, and subsequent performance at the construction stage, were investigated. Using the descriptive survey method, 243 contractors and 307 subcontractors registered with the Gauteng Master Builders Association of South Africa were surveyed. The multi‐attribute technique was used to analyse the data. Results showed that quality record is the most influential criterion for selecting high performing subcontractors at the pre‐qualification stage, and for assessing their performance at the construction stage. Tender price exerts the most significant influence in the subcontract award. A framework was developed for use by main contractors and consultants in the assessment of the suitability and performance of subcontractors. Application of the framework to a case study demonstrated its merit as a tool for ensuring that only high performing subcontractors are selected for subcontract jobs.
Highway infrastructure plays an important role in assuring the proper function of the nation’s transportation. Highway alignment is an essential part of the highway planning and design phase, which has significant effects on the surroundings. Identifying optimal highway routes while using traditional methods requires significant time, cost, and effort, since it requires a comprehensive assessment of multiple factors, such as cost and environmental impacts. This study proposes an approach for managing highway alignment in the context of a larger landscape that integrates building information modelling (BIM) and geographic information system (GIS) capabilities. To support this integration, semantic web technologies are used to integrate data on a semantic level. Moreover, the approach also uses genetic algorithms (GAs) for optimizing highway alignments. A fully automated model is developed that enables data interoperability between BIM and GIS systems and also allows for data exchange between the integration model and the optimization algorithm. The model enables the full exploitation of features of the project and its surroundings for highway alignment planning. The proposed model is also applied to a real highway project to validate its effectiveness. The visualization model of the highway project and its surroundings provides a realistic three-dimensional image that produces a comprehensive virtual environment, where the project could be effectively planned and designed. That can help to reduce design errors and miscommunication, which, in turn, reduces project risks. Moreover, geological and geographical analyses help to identify geohazards and environmentally sensitive regions. The proposed model facilitates highway alignment planning by providing a cross-disciplinary approach to close the gap between the infrastructural and geotechnical planning processes.
Critical issues surrounding the promotion and adoption of building information modeling (BIM) for construction projects are largely country-specific due to contextual socio-cultural, economic, and regulatory environments impacting construction operations and outcomes. There is little information on BIM adoption issues specific to the Cambodian construction industry (‘the industry’). This paper aims to narrow existing knowledge by investigating key drivers for, and barriers to the adoption of BIM in the industry. Using descriptive survey method, feedback was received from contractors and architects that were registered with their respective trade and professional associations in the industry. The multi-attribute method and the Statistical Package for the Social Sciences (SPSS)-based Kendall’s coefficient of concordance (W) test were used to analyze the empirical datasets. Results showed that out of the 13 significant drivers identified in the study, the most influential comprised the technology’s ability to remarkably enhance project visualization and schedule performance; this is followed by awareness that the technology is redefining how project information is created and shared among stakeholders and therefore the future of the industry that cannot be ignored. On the other hand, the most constraining barrier to the adoption of the technology, out of 19 significant barriers, related to strong industry resistance to change, especially reluctance to change from 2D drafting to 3D modeling; other highly rated barriers included the high initial cost of the software and the shortage of professionals with BIM skills. Implementation of the study findings could support greater uptake of the technology and the leveraging of its key benefits to improving project success and the growth of the Cambodian construction industry, as well as those of other developing economies that share similar socio-cultural, economic, and regulatory environments.
1 January 2006 in Construction Management and Economics
A conceptual framework is developed for assessment of client needs, and the measurement and monitoring of client satisfaction levels in the building development process. Data were obtained from qualitative and quantitative surveys of a target population of clients of commercial buildings in South Africa. Satisfaction levels based on multi‐attribute measures were compared with those based on single evaluative responses, using Wilcoxon's matched‐pair test. Results showed no significant differences in pairwise comparisons. A strong positive correlation also existed between both equivalent measures of client satisfaction levels. These results validate the conceptual framework. Results of evaluation of client satisfaction levels showed that clients perceived average levels of satisfaction in the building development process. Areas for improvement in the services of contractors and consultants were identified through ‘Criticality Index’ analyses. Empirical models were developed for proactive measurements of client satisfaction levels at distinct stages of the development process. A dynamic approach to satisfaction measurement is recommended. This contrasts with post‐purchase and static views adopted in the consumer services segment and enables consultants to monitor and improve satisfaction levels proactively, as the development process evolves.