Petar Mijić

Dr. Petar Mijić

University of Zagreb, Faculty of Mining, Geology and Petroleum Engineering
orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2022 in Energies
Verified
Journal Article
Open access
PDF file
IMIgor Medved
Igor Medved
Nediljka Gaurina-MeđimurecNediljka Gaurina-Međimurec
Nediljka Gaurina-Međimurec
KMKarolina Novak Mavar
Karolina Novak Mavar
PMPetar Mijić
Petar Mijić
Drilling fluid represents the most important fluid that must fulfill numerous important assignments during drilling operations. Many commercially available additives for water-based drilling fluid fall into the category of non-degradable and environmentally hazardous materials. Significant development in this area can be made by using biodegradable materials as additives in drilling fluids. The objective of this study was to determine whether mandarin peel powder particle size affects the properties of the drilling fluid. In this paper, mandarin peel was used in the form of a dry powder divided into particle sizes smaller than 0.1 mm, and between 0.1 mm and 0.16 mm. Mandarin peel powder was added to a water-based drilling fluid in four different concentrations (0.5, 1, 1.5, and 2% by volume of water). By increasing the mandarin peel powder concentration, the API filtration reduced up to 42%, PPT filtration significantly decreased up to 61.54%, while the rheological parameters generally increased but remained within acceptable limits. It is determined that the optimal concentration of mandarin peel powder is up to 1.5% by volume of water.

14 January 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Nediljka Gaurina-MeđimurecNediljka Gaurina-Međimurec
Nediljka Gaurina-Međimurec
Borivoje PašićBorivoje Pašić
Borivoje Pašić
PMPetar Mijić
Petar Mijić
IMIgor Medved
Igor Medved
For years, drilling engineers have been faced with the challenge of drilling wells through naturally fractured reservoirs that are present around the world. During drilling, the pressure at the bottomhole of a well is frequently intentionally higher than formation pressure, which can result in the loss of mud in surrounding rocks. During well cementing, the bottomhole pressure is even higher than it is during drilling, because the cement slurry density is higher than the density of the mud. Therefore, if natural or induced fractures in the surrounding rocks are not plugged during drilling, the cement slurry can be lost to them, reducing their permeability which is undesirable in the case of a pay zone. To prevent the loss of circulation and the related consequences, it is necessary to apply good drilling and cementing practices and to use adequate methods and carefully selected materials for plugging the loss zones. The aim of this article is to give an overview of the preventive and corrective methods that can be applied in drilling and cementing through fractured zones as well as improvements in drilling and cementing technology to avoid lost circulation issues (e.g., aerated drilling fluid, casing while drilling, managed pressure drilling, expandable tubulars, lightweight cement slurries, etc.).

23 March 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
KSKarim El Sabeh
Karim El Sabeh
Nediljka Gaurina-MeđimurecNediljka Gaurina-Međimurec
Nediljka Gaurina-Međimurec
PMPetar Mijić
Petar Mijić
IMIgor Medved
Igor Medved
Borivoje PašićBorivoje Pašić
Borivoje Pašić
With the development of different segments within the drilling technology in the last three decades, well drilling has become possible in harsh downhole conditions. The vertical well provides access to oil and gas reserves located at a certain depth directly below the wellsite, and a large number of vertical wells are required for the exploitation of hydrocarbons from spatially expanded deposits. However, the borehole can deviate from the vertical well, which means that the target zone can be reached by a horizontal directional well. With this type of well, especially in the case of drilling an extended-reach well (ERW), the length of the wellbore in contact with the reservoir and/or several separate reservoirs is significantly increased, therefore, it is a much better option for the later production phase. Unfortunately, the application of extended-reach drilling (ERD technology), with all of its advantages, can cause different drilling problems mostly related to the increased torque, drag, hole cleaning and equivalent circulation density (ECD), as well as to an increase in the well price. Overcoming these problems requires continuous operational change to enable operators to address downhole challenges. Today, the longest well reaches 15,240 m (50,000 ft), which raises the question of the technological and economic feasibility of this type of drilling project, especially with the lower oil price on the energy market. This paper provides a comprehensive overview of extended-reach drilling technology, discusses the main problems and analyzes current achievements.

21 March 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Nediljka Gaurina-MeđimurecNediljka Gaurina-Međimurec
Nediljka Gaurina-Međimurec
Vladislav BrkićVladislav Brkić
Vladislav Brkić
MTMatko Topolovec
Matko Topolovec
PMPetar Mijić
Petar Mijić
Hydraulic fracturing operations are performed to enhance well performance and to achieve economic success from improved production rates and the ultimate reserve recovery. To achieve these goals, fracturing fluid is pumped into the well at rates and pressures that result in the creation of a hydraulic fracture. Fracturing fluid selection presents the main requirement for the successful performance of hydraulic fracturing. The selected fracturing fluid should create a fracture with sufficient width and length for proppant placement and should carry the proppant from the surface to the created fracture. To accomplish all those demands, additives are added in fluids to adjust their properties. This paper describes the classification of fracturing fluids, additives for the adjustment of fluid properties and the requirements for fluid selection. Furthermore, laboratory tests of fracturing fluid, fracture stimulation design steps are presented in the paper, as well as a few examples of fracturing fluids used in Croatia with case studies and finally, hydraulic fracturing performance and post-frac well production results. The total gas production was increased by 43% and condensate production by 106% in selected wells including wellhead pressure, which allowed for a longer production well life.

27 March 2020 in Minerals
Verified
Journal Article
Open access
PDF file
Nediljka Gaurina-MeđimurecNediljka Gaurina-Međimurec
Nediljka Gaurina-Međimurec
Borivoje PašićBorivoje Pašić
Borivoje Pašić
PMPetar Mijić
Petar Mijić
IMIgor Medved
Igor Medved
Oil and gas exploration and production activities generate large amounts of waste material, especially during well drilling and completion activities. Waste material from drilling activities to the greatest extent consists of drilled cuttings and used drilling mud with a smaller portion of other materials (wastewater, produced hydrocarbons during well testing, spent stimulation fluid, etc.). Nowadays, growing concerns for environmental protections and new strict regulations encourage companies to improve methods for the reduction of waste material, as well as improve existing and develop new waste disposal methods that are more environmentally friendly and safer from the aspect of human health. The main advantages of the waste injection method into suitable deep geological formations over other waste disposal methods (biodegradation, thermal treatment, etc.) are minimizing potentially harmful impacts on groundwater, reducing the required surface area for waste disposal, reducing the negative impact on the air and long-term risks for the entire environment. This paper gives a comprehensive overview of the underground waste injection technology, criteria for the selection of the injection zone and methods required for process monitoring, as well as a comprehensive literature overview of significant past or ongoing projects from all over the world.

18 July 2021 in Energies
Verified
Journal Article
Open access
PDF file
Vladislav BrkićVladislav Brkić
Vladislav Brkić
IZIVAN ZELENIKA
IVAN ZELENIKA
PMPetar Mijić
Petar Mijić
IMIgor Medved
Igor Medved
The storage of natural gas in geological structures such as depleted fields, aquifers and salt caverns plays an important role in a gas supply system as it balances the fluctuation of gas demand and price. Hydraulic loss due to fluid flow through gas storage production equipment and an interfering effect from nonequal productivity index of storage wells may have an important influence on gas storage performance. An integrated mathematical model is developed based on underground gas storage facility production data. Using this model, the hydraulic loss is determined. A real test case that consists of a gas storage reservoir linked to the surface facility is analysed. The mathematical model uses an experimentally determined pressure drop coefficient in chokes. The base case scenario created using real gas storage facility data enables the achievement of a good history match with the given parameters of the gas storage reservoir. Using the history match simulation case as an initial scenario (a base case), two different scenarios are created to determine the injection and withdrawal performance of the gas storage field. The results indicate that the pressure drop in chokes, when fully open as a constraints in an underground gas storage facility, has a significant impact on gas storage operations and deliverability.