jia yu

Prof. jia yu

Tianjin University

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 August 2020 in Energies
Verified
Journal Article
Open access
PDF file
WSWenshuai Song
Wenshuai Song
TGTao Guan
Tao Guan
BRBingyu Ren
Bingyu Ren
JYjia yu
jia yu
JWJiajun Wang
Jiajun Wang
BWBinping Wu
Binping Wu
Joint grouting simulation is an important aspect of arch dam construction simulation. However, the current construction simulation model simplifies the temperature factors in joint grouting simulation, which leads to the difference between the simulation results and the actual construction schedule. Furthermore, the majority of existing temperature prediction research is based on deterministic point predictions, which cannot quantify the uncertainties of the prediction values. Thus, this study presents a real-time construction simulation method coupling a concrete temperature field interval prediction model to address these problems. First, a real-time construction simulation model is established. Secondly, this paper proposes a concrete temperature interval prediction method based on the hybrid-kernel relevance vector machine (HK-RVM) with the improved grasshopper optimization algorithm (IGOA). The hybrid-kernel method is adopted to ensure the prediction accuracy and generalization ability of the model. Additionally, the improved grasshopper optimization algorithm (IGOA), which utilizes the tent chaotic map and cosine adaptive method to improve the algorithm performance, is developed for the parameter optimization of HK-RVM. Thirdly, concept drift detection based on variable window technology is proposed to update the prediction model. Finally, an arch dam project in China is used as a case study, by which the superiority and applicability of the proposed method are proven.

1 December 2022 in Journal of Zhejiang University-SCIENCE A
Verified
Journal Article
Closed access
PDF file
FLFei Lv
Fei Lv
JYjia yu
jia yu
JZJun Zhang
Jun Zhang
PYPeng Yu
Peng Yu
DTDa-Wei Tong
Da-Wei Tong
BWBin-Ping Wu
Bin-Ping Wu

Abstract

目的

对钻进效率进行精确预测是制定土方开挖进度计划的关键。但现有预测方法多采用单个机器学习模型, 存在参数敏感性和过拟合等问题, 且往往忽略了环境因素和人员操作因素的影响。针对这些问题, 本文提出一种同时考虑多种因素综合影响的新的集成学习预测方法。

创新点

1. 建立一种基于Stacking集成学习的钻进效率预测模型; 2. 定量地考虑地质特性、人员操作、环境和机械特性等多种因素的综合影响; 3. 提出一种基于自适应步长策略的改进布谷鸟搜索优化方法 , 优化模型关键参数。

方法

1. 通过多次对比实验, 最终选择极值梯度提升(XGBoost)、随机森林(RF)和反向传播神经网络(BPNN)三个模型作为基学习器, 支持向量回归(SVR)作为元学习器进行集成。2. 建立基于自适应步长策略的改进布谷鸟搜索优化算法, 对集成模型的Max_depth等超参数进行优化。3. 将钻进效率值及相关影响因素的样本数据输入到每个基学习器中, 得到相应的输出结果, 再将预测结果作为元学习器的输入值, 得到最终的预测结果。4. 以中国西南地区某土石方工程为例, 通过五折交叉验证方法, 验证模型的鲁棒性, 并采用五个常用评价指标评价模型的精度和泛化性能。

结论

工程应用结果表明, 相比于目前流行的单个机器学习方法中预测性能最好的XGBoost和基于粒子群算法优化的Stacking集成模型, 本文所提方法的平均绝对百分比误差(MAPE)分别提高了16.43%和4.88%。


22 November 2021 in Sensors
Verified
Journal Article
Open access
PDF file
CWCheng Wang
Cheng Wang
JWJiajun Wang
Jiajun Wang
Wenlong ChenWenlong Chen
Wenlong Chen
JYjia yu
jia yu
ZJZheng Jiao
Zheng Jiao
HYHongling Yu
Hongling Yu
Paving thickness and evenness are two key factors that affect the paving operation quality of earth-rock dams. However, in the recent study, both of the key factors characterising the paving quality were measured using finite point random sampling, which resulted in subjectivity in the detection and a lag in the feedback control. At the same time, the on-site control of the paving operation quality based on experience results in a poor and unreliable paving quality. To address the above issues, in this study, a novel assessment and feedback control framework for the paving operation quality based on the observe–orient–decide–act (OODA) loop is presented. First, in the observation module, a cellular automaton is used to convert the location of the bulldozer obtained by monitoring devices into the paving thickness of the levelling layer. Second, in the orient module, the learning automaton is used to update the state of the corresponding and surrounding cells. Third, in the decision module, an overall path planning method is developed to realise feedback control of the paving thickness and evenness. Finally, in the act module, the paving thickness and evenness of the entire work unit are calculated and compared to their control thresholds to determine whether to proceed with the next OODA loop. The experiments show that the proposed method can maintain the paving thickness less than the designed standard value and effectively prevent the occurrence of ultra-thick or ultra-thin phenomena. Furthermore, the paving evenness is improved by 21.5% as compared to that obtained with the conventional paving quality control method. The framework of the paving quality assessment and feedback control proposed in this paper has extensive popularisation and application value for the same paving construction scene.

31 July 2023 in Neural Computing and Applications
Verified
Journal Article
Closed access
PDF file
YZYunuo Zhang
Yunuo Zhang
XWXiaoling Wang
Xiaoling Wang
JYjia yu
jia yu
TZTuocheng Zeng
Tuocheng Zeng
JWJiajun Wang
Jiajun Wang

10 September 2020 in Sensors
Verified
Journal Article
Open access
PDF file
Jun ZhangJun Zhang
Jun Zhang
JYjia yu
jia yu
TGTao Guan
Tao Guan
JWJiajun Wang
Jiajun Wang
DTDawei Tong
Dawei Tong
BWBinping Wu
Binping Wu
The compaction construction process is a critical operation in civil engineering projects. By establishing a construction simulation model, the compaction duration can be predicted to assist construction management. Existing studies have achieved adaptive modelling of input parameters from a Bayesian inference perspective, but usually assume the model as parametric distribution. Few studies adopt the nonparametric distribution to achieve robust inference, but still need to manually set hyper-parameters. In addition, the condition of when the roller stops moving ignores the impact of randomness of roller movement. In this paper, a new adaptive compaction construction simulation method is presented. The Bayesian field theory is innovatively adopted for input parameter adaptive modelling. Next, whether rollers have offset enough distance is used to determine the moment of stopping. Simulation experiments of the compaction process of a high earth dam project are demonstrated. The results indicate that the Bayesian field theory performs well in terms of accuracy and efficiency. When the size of roller speed dataset is 787,490, the Bayesian field theory costs only 1.54 s. The mean absolute error of predicted compaction duration reduces significantly with improved judgment condition. The proposed method can contribute to project resource planning, particularly in a high-frequency construction monitoring environment.

29 January 2024 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
TZTianhong Zhang
Tianhong Zhang
XWXiaoling Wang
Xiaoling Wang
JYjia yu
jia yu
XXXiao Xiao
Xiao Xiao
LHLianxing Hu
Lianxing Hu
HGHui Guo
Hui Guo