Bingyu Ren

Dr. Bingyu Ren

State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300350, China;

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 March 2017 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Closed access
PDF file
XLXiaochao Li
Xiaochao Li
ZDZhong Denghua
Zhong Denghua
BRBingyu Ren
Bingyu Ren
GFGuichao Fan
Guichao Fan
BCBo Cui
Bo Cui

22 December 2021 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Closed access
PDF file
KLKai Li
Kai Li
BRBingyu Ren
Bingyu Ren
TGTao Guan
Tao Guan
JWJiajun Wang
Jiajun Wang
JYJia Yu
Jia Yu
JHJicun Huang
Jicun Huang

31 August 2020 in Energies
Verified
Journal Article
Open access
PDF file
WSWenshuai Song
Wenshuai Song
TGTao Guan
Tao Guan
BRBingyu Ren
Bingyu Ren
JYjia yu
jia yu
JWJiajun Wang
Jiajun Wang
BWBinping Wu
Binping Wu
Joint grouting simulation is an important aspect of arch dam construction simulation. However, the current construction simulation model simplifies the temperature factors in joint grouting simulation, which leads to the difference between the simulation results and the actual construction schedule. Furthermore, the majority of existing temperature prediction research is based on deterministic point predictions, which cannot quantify the uncertainties of the prediction values. Thus, this study presents a real-time construction simulation method coupling a concrete temperature field interval prediction model to address these problems. First, a real-time construction simulation model is established. Secondly, this paper proposes a concrete temperature interval prediction method based on the hybrid-kernel relevance vector machine (HK-RVM) with the improved grasshopper optimization algorithm (IGOA). The hybrid-kernel method is adopted to ensure the prediction accuracy and generalization ability of the model. Additionally, the improved grasshopper optimization algorithm (IGOA), which utilizes the tent chaotic map and cosine adaptive method to improve the algorithm performance, is developed for the parameter optimization of HK-RVM. Thirdly, concept drift detection based on variable window technology is proposed to update the prediction model. Finally, an arch dam project in China is used as a case study, by which the superiority and applicability of the proposed method are proven.

7 July 2018 in Journal of Zhejiang University-SCIENCE A
Verified
Journal Article
Closed access
PDF file
TGTao Guan
Tao Guan
DZDeng-Hua Zhong
Deng-Hua Zhong
BRBingyu Ren
Bingyu Ren
WSWen-Shuai Song
Wen-Shuai Song
ZCZhi-Qiang Chu
Zhi-Qiang Chu
目的 针对当前高拱坝施工进度仿真研究中施工仿真参 数难以实现对现场施工状态的有效跟踪的现状, 研究施工仿真参数实时更新方法,以提高施工仿 真参数及仿真计算结果的准确度。

1 March 2018 in Journal of Hydraulic Engineering
Verified
Journal Article
Closed access
ZCZhengfei Cheng
Zhengfei Cheng
XWXiaoling Wang
Xiaoling Wang
BRBingyu Ren
Bingyu Ren
PLPeng Lv
Peng Lv
XZXiaobin Zhu
Xiaobin Zhu
Dam foundation seepage is a major concern for the stability of a hydropower project in southwest China (referred to here as Project X). The complicated geological structure, multiple grouting curtains, and adjustable drainage system of Project X significantly increase the complexity of the dam foundation seepage field. In this work, a three-dimensional (3D) air-water two-phase seepage mathematical model, coupled with the volume of fluid (VOF) method, is developed based on the computational fluid dynamics (CFD) approach. The 3D unified model of Project X, including strata, unfavorable geological bodies, grouting curtains, adjustable drainage system, consolidation grouting, and gravity dam body, is later established in an integrated manner for the entire dam area. Furthermore, an extended “fissure to represent line of holes” method is proposed to model the drainage holes with adjustable opening degrees. Subsequently, the distributions of the water head, hydraulic gradient, and uplift pressure, both before and after adjusting the drainage system, are analyzed. The overall behavior of the seepage control system and the influence of the opening degrees of the drainage holes on the seepage field are comprehensively discussed, and an optimized operating state is recommended for the drainage system. The discussion reveals that the maximum hydraulic gradient at the grouting curtains decreases and the average uplift pressure on the dam foundation surface increases with decreasing water discharge of the drainage system. Comparisons with in situ monitoring data demonstrate the reliability of the proposed methodology.

10 July 2017 in Transactions of Tianjin University
Verified
Journal Article
Closed access
PDF file
DZDenghua Zhong
Denghua Zhong
ZCZhiqiang Chu
Zhiqiang Chu
BRBingyu Ren
Bingyu Ren
MZMengqi Zhao
Mengqi Zhao
TGTao Guan
Tao Guan
WSWenshuai Song
Wenshuai Song