Zoran Stojadinovic

Dr. Zoran Stojadinovic


Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 May 2023 in Journal of Big Data
Verified
Journal Article
Open access
PDF file
ZBZoran Babović
Zoran Babović
BBBranislav Bajat
Branislav Bajat
VĐVladan Đokić
Vladan Đokić
FĐFilip Đorđević
Filip Đorđević
Dražen DraškovićDražen Drašković
Dražen Drašković
SZStan Zak
Stan Zak
This article presents a taxonomy and represents a repository of open problems in computing for numerically and logically intensive problems in a number of disciplines that have to synergize for the best performance of simulation-based feasibility studies on nature-oriented engineering in general and civil engineering in particular. Topics include but are not limited to: Nature-based construction, genomics supporting nature-based construction, earthquake engineering, and other types of geophysical disaster prevention activities, as well as the studies of processes and materials of interest for the above. In all these fields, problems are discussed that generate huge amounts of Big Data and are characterized with mathematically highly complex Iterative Algorithms. In the domain of applications, it has been stressed that problems could be made less computationally demanding if the number of computing iterations is made smaller (with the help of Artificial Intelligence or Conditional Algorithms), or if each computing iteration is made shorter in time (with the help of Data Filtration and Data Quantization). In the domain of computing, it has been stressed that computing could be made more powerful if the implementation technology is changed (Si, GaAs, etc.…), or if the computing paradigm is changed (Control Flow, Data Flow, etc.…).

22 March 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
NSNevena Simić
Nevena Simić
NINenad Ivanišević
Nenad Ivanišević
ĐNĐorđe Nedeljković
Đorđe Nedeljković
Aleksandar SenićAleksandar Senić
Aleksandar Senić
ZSZoran Stojadinovic
Zoran Stojadinovic
MIMarija Zoran Ivanovic
Marija Zoran Ivanovic
Cost estimates in the early stages of project development are essential for making the right decisions, but they are a huge challenge and risk for owners and potential contractors due to limited information about the characteristics of a future highway project. Whereas previous studies were mainly focused on achieving the highest possible estimation accuracy, this paper aims to propose cost-estimation models that can provide satisfactory accuracy with the least possible effort and to compare the perspectives of owners and contractors as the key stakeholders on projects. To determine cost drivers (CDs) that have a high influence on highway-construction costs and require low effort for their establishment, a questionnaire survey was conducted. Based on the key stakeholders’ perceptions and collected data set, cost-estimation models were developed using multiple-regression analysis, artificial neural networks, and XGBoost. The results show that reasonable cost-estimation accuracy can be achieved with relatively low effort for three CDs for the owners’ perspective and five CDs for the contractors’ perspective. Additional inclusion of input CDs in models does not necessarily imply an increase in accuracy. Also, the questionnaire results show that owners are more concerned about environmental issues, whereas contractors are more concerned about the possible changes in resource prices (especially after recent high increases caused by COVID-19 and the Russia–Ukraine war). These findings can help owners and potential contractors in intelligent decision-making in the early stages of future highway-construction projects.

16 January 2025 in Mathematics
Verified
Journal Article
Open access
PDF file
Aleksandar SenićAleksandar Senić
Aleksandar Senić
MIMarija Zoran Ivanovic
Marija Zoran Ivanovic
Momčilo DobrodolacMomčilo Dobrodolac
Momčilo Dobrodolac
ZSZoran Stojadinovic
Zoran Stojadinovic
Risk management in construction projects is a critical process aimed at identifying, evaluating, and mitigating potential risks that could impact project performance. Preventive measures play a central role in this process, serving as proactive strategies to minimize the likelihood and impact of risks on project outcomes. This study involved 37 experts from multidisciplinary fields related to road infrastructure, ensuring a diverse and comprehensive perspective on risk evaluation and prevention. The DELPHI method was employed to systematically define key risks and their corresponding preventive measures, providing a structured foundation for further analysis. The experts evaluated 302 preventive measures across 56 risks using 4 predefined criteria: implementation costs, time required for implementation, implementation complexity, and probability of success. A multi-criteria decision making (MCDM) approach was then applied to analyze these evaluations, enabling the prioritization of preventive measures and the allocation of resources toward the most effective strategies. Additionally, fuzzy logic was employed to analyze and validate the results, providing a complementary approach to the MCDM methodology. The results of this research provide a robust framework for risk management, offering practical guidance for decision makers in the construction industry. By integrating expert judgment, systematic evaluation, and advanced analytical methods, this study delivers actionable insights and establishes a reliable methodology for enhancing the effectiveness of risk mitigation in road infrastructure projects.

4 March 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Aleksandar SenićAleksandar Senić
Aleksandar Senić
NSNevena Simić
Nevena Simić
Momčilo DobrodolacMomčilo Dobrodolac
Momčilo Dobrodolac
ZSZoran Stojadinovic
Zoran Stojadinovic
During the execution of road infrastructure projects, project managers face significant challenges, including financial, technical, regulatory, and operational risks. More than 90% of infrastructure projects have incurred costs exceeding initial estimates, impacting both completion timelines and the operational efficiency of road infrastructure. Effectively assessing and managing these risks is crucial for improving project outcomes and ensuring the sustainability of infrastructure investments. To address these challenges, this study developed a hybrid model for risk assessment and management in road infrastructure projects. The model quantifies risks across seven key categories: Design, External, Resource, Employer, Contractor, Engineer, and Project, based on three primary input factors: Environment coefficient, Contractual coefficient, and Design coefficient. Initially, various machine learning models, including linear regression, Random Forest, Gradient Boosting, Stacking Models, and neural networks, were applied to assess risk predictions. However, due to the specific nature of the dataset, these models did not achieve satisfactory predictive accuracy. As a result, fuzzy logic systems (Mamdani and Sugeno) were employed, demonstrating superior performance in modeling risk occurrence probabilities. Comparative analysis between these two fuzzy logic approaches revealed that the Sugeno model provided the most accurate predictions. The findings highlight the benefits of applying fuzzy logic for risk assessment in complex infrastructure projects, providing a structured framework for enhancing decision-making processes. This study provides a structured methodology for accurately predicting risks and enhancing project safety, efficiency, and long-term sustainability.

31 May 2023 in Journal of Big Data
Verified
Journal Article
Open access
PDF file
ZBZoran Babović
Zoran Babović
BBBranislav Bajat
Branislav Bajat
DBDusan Barac
Dusan Barac
VBVesna Bengin
Vesna Bengin
VĐVladan Đokić
Vladan Đokić
SZStan Zak
Stan Zak
This article describes a teaching strategy that synergizes computing and management, aimed at the running of complex projects in industry and academia, in the areas of civil engineering, physics, geosciences, and a number of other related fields. The course derived from this strategy includes four parts: (a) Computing with a selected set of modern paradigms—the stress is on Control Flow and Data Flow computing paradigms, but paradigms conditionally referred to as Energy Flow and Diffusion Flow are also covered; (b) Project management that is holistic—the stress is on the wide plethora of issues spanning from the preparation of project proposals, all the way to incorporation activities to follow after the completion of a successful project; (c) Examples from past research and development experiences—the stress is on experiences of leading experts from academia and industry; (d) Student projects that stimulate creativity—the stress is on methods that educators could use to induce and accelerate the creativity of students in general. Finally, the article ends with selected pearls of wisdom that could be treated as suggestions for further elaboration.

4 September 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
Aleksandar SenićAleksandar Senić
Aleksandar Senić
Momčilo DobrodolacMomčilo Dobrodolac
Momčilo Dobrodolac
ZSZoran Stojadinovic
Zoran Stojadinovic
Road infrastructure is a significant factor in the development of any country, affecting economic growth, social development, and environmental sustainability. Large infrastructure projects often face significant risks and uncertainties, which can lead to delays, budget over-runs, and an insufficient quality of the completed work. These issues undermine the economic viability of projects and affect the overall efficiency of infrastructure development. For these reasons, based on a literature review and completed project analysis, the risks that lead to an increasing Contract Price (ICP) and an Extension of Time (EoT) for the construction of the project are identified. Based on the results of the completed project analysis, the values of the ICP and EoT were quantified. Also, the probability of the occurrence of each risk in new projects was calculated. Based on the obtained results, a model was defined that groups risks into clusters. Risks in the first cluster should have priority for funding, and preventive measures are defined for them. The model obtained in this way can greatly enhance project management in real-world conditions and can lead to a significant reduction in project time and budget over-runs.